Building Safety (Remediation of Unsafe Cladding etc) Bill
Public Bill Committee, 19 November 2026.
Rupa Huq (Labour, Ealing Central and Acton)
We are now sitting in public and the proceedings are being televised—so good behaviour, everyone, please. I remind Members to switch their electronic devices to silent. In a Select Committee the other day, people watching the broadcast saw someone playing a game, so try to refrain.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Not ours!
Rupa Huq (Labour, Ealing Central and Acton)
No, it was definitely not here. Also, tea and coffee are not allowed during sittings.
Clause 35 - Offence
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Amendment 42, in clause 36, page 20, line 17, leave out from “undertaking” to the end of line 8 and insert—
“or where the undertaking is a member of a group, a fixed cap, to be determined by regulations.
(2A) Regulations under subsection (2)(b) may not be made unless a draft of the instrument has been laid before and approved by a resolution of each House of Parliament.”
This amendment would remove the ability to impose penalties based on worldwide revenue and instead subject them to a fixed cap, to be set by regulations.
Clause 36 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
It is an absolute privilege to serve for the first time under your chairship, Dr Huq, on day two of our line-by-line scrutiny of the Bill. The input that we had from all parts of the Committee on the first day was well natured and enlightening, and I look forward to today’s debates. We are one down on the Lib Dem side, but I am sure the hon. Member for Taunton and Wellington will do his best and provide challenge during our proceedings.
On clauses 35 and 36, critical remediation work is too often delayed by disputes about access to the buildings, the scope of works or the contractual arrangements. We must ensure that no one can unreasonably stand in the way of making buildings safe. That is why clause 35 makes it an offence to intentionally obstruct anyone seeking to assess, put in place interim measures or remediate. That includes obstructing responsible entities acting under the legal duty to remediate, developers carrying out works under the developer remediation contract, and remediation authorities using remediation backstop powers. Obstruction could include deliberately blocking access for assessment or works, withholding necessary consent or otherwise preventing interim measures or remediation from proceeding.
Importantly, the obstruction offence does not prevent people from expressing concerns or seeking to resolve legitimate disputes. We recognise that some complex remediation projects may inevitably involve disagreement. The offence is therefore carefully targeted and distinguishes between someone acting reasonably and constructively to resolve a valid dispute and someone deliberately obstructing remediation without a reasonable excuse. That is why the offence requires intentional obstruction and provides a reasonable excuse defence. Those are important safeguards.
Whether someone has a reasonable excuse will depend on the circumstances of their case. When someone intentionally obstructs without a reasonable excuse, enforcing authorities will have the power to prosecute or can impose a substantial financial penalty as an alternative to criminal prosecution. Those penalties are intended to encourage co-operation and to deter obstruction. They will also provide meaningful consequences for those who egregiously block remediation. Many parties have a part to play in fixing unsafe buildings. The clause will ensure that vital works move forward, and that residents are not left at risk because someone is obstructing the building’s progress.
Clause 36 enables enforcement authorities to issue substantial financial penalties where a person commits an obstruction offence under clause 35. That is similar to the approach taken for the majority of the offences in the Bill, which we discussed in detail on 17 November. Where an individual has committed an obstruction offence, the enforcement authority may impose a financial penalty of up to £40,000. Where a company has committed an obstruction offence, the enforcement authority may impose a financial penalty of up to 5% of qualifying worldwide revenue of the undertaking or group.
Clause 36 also contains important safeguards. To ensure that the financial penalties are fair, the enforcement authority must be satisfied beyond reasonable doubt that the offence has been committed. A penalty cannot be imposed where the person can show, on the balance of probabilities, that they had a reasonable excuse. I therefore commend clauses 35 and 36 to the Committee.
Gareth Bacon (Conservative, Orpington)
I join the Minister in saying what a pleasure it is to serve under your chairmanship for the very first time, Dr Huq.
Colleagues across the House will be familiar with the argument I am about to make for amendment 42, which is tabled in my name, because I made exactly the same one for amendments 36 and 40. Amendment 42 will do exactly what it says on the tin: it is about ensuring proper democratic parliamentary oversight and that both Houses have the opportunity to scrutinise and approve regulations before they take effect—no more, no less. We are asking for the affirmative rather than the negative procedure to be used.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
We will resist amendment 42 on maximum fines. I hope the hon. Member will appreciate that company size and turnover may vary widely.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
Did the shadow Minister address the fines in his speech on amendment 42? I did not hear him talk about them, and I just wonder whether there is an opportunity to do so. The Liberal Democrats oppose the limit on fines proposed in amendment 42. Does the Minister agree that they should not be seen as a cost of doing business, as the deputy Mayor of Greater Manchester suggested they could be if they are too limited and too small?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank the hon. Member for raising that valid point. I was going to highlight the fact that company size and turnover may vary widely, so a one-size-fits-all approach could risk over-penalising smaller companies and not penalising bigger companies, which may have bigger profits and turnover. A fixed cap could also weaken the deterrent of the financial penalties for large corporate companies.
As the hon. Member for Orpington highlighted, his amendment 42 is similar to amendments 36 and 40, which we have already discussed. It would replace the revenue-based maximum financial penalty for an undertaking or group with a fixed cap to be set by regulations. The Government recognise that financial penalties must be fair and proportionate, but they must also be a meaningful deterrent to non-compliance. As we have discussed, that is why the Bill links the maximum financial penalty to qualifying worldwide revenue. That ensures that the available sanctions reflect the financial resources of the undertaking or group concerned. I stress that again to the hon. Member and hope he will accept that reassurance. I urge him not to press the amendment.
Gareth Bacon (Conservative, Orpington)
As the Minister said, these are two issues on which we have already argued and divided. It was very, very close, obviously, but we did not win either vote and I do not propose to detain the Committee with a Division in this instance.
Clause 37 - Local housing authorities
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clauses 38 and 39 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clauses 37, 38 and 39 collectively ensure that the three regulators of building safety in England can use their powers to enforce part 1 of the Bill.
Clause 37 ensures that local housing authorities have the investigatory tools they need to enforce part 1. It does that by extending three existing powers under the Housing Act 2004, allowing local housing authorities to use established and familiar powers, rather than creating a whole new investigative regime. First, the Bill allows local housing authorities to require relevant documents to be produced. That will help them establish the facts, assess compliance and support enforcement. Secondly, it allows authorised officers to enter premises where a survey or examination is needed for functions under part 1. That will enable authorities to inspect a building when directly investigating compliance or deciding what action to take. Thirdly, it allows authorities to seek a warrant where the statutory conditions are met.
Clause 38 ensures that the Building Safety Regulator has the framework it needs to regulate and enforce part 1 of the Bill. It does that by making three targeted amendments to the Building Safety Act 2022. Together, those changes give the Building Safety Regulator a coherent and familiar framework to investigate non-compliance, take effective enforcement action and support remediation.
Clause 39 ensures that fire and rescue authorities have the investigatory tools they need to enforce part 1 of the Bill. It allows inspectors to use existing powers to enter and inspect premises, make inquiries, require information and records, and take samples where necessary. That ensures that fire and rescue authorities can obtain the evidence and access they need to investigate non-compliance, take effective enforcement action and help remediation move forward.
Rachel Blake (Labour/Co-operative, Cities of London and Westminster)
These are clearly important powers. I know they are not directly focused on the resources of individual authorities, but given the scale of the issue would the Minister agree that this is an important moment to acknowledge the need to develop skills in the authorities that will now have these investigatory powers, and that there is a positive opportunity around apprenticeships, given the nature of the workforce in this area?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank my hon. Friend for raising that important and valid point. Capacity and workforce are a key issue that comes up time and again, and this is a very technical area. However, this is essentially about making sure we are looking for more people to join the sector and the trade. Developers, housing associations and others always mention additional capacity for our local authority colleagues. My hon. Friend will be aware that the Ministry of Housing, Communities and Local Government is conducting a new burdens assessment for the Bill to understand what additional support, if any, the regulators need in order to comply with the new duties, and to ensure that the workforce and training are there.
James Asser (Labour, West Ham and Beckton)
This is an extremely important clause. As the Minister is aware, I am dealing with a major housing issue. Although it is not fire and cladding related, my residents have often found themselves casting around for the right authority. Does she agree that having that authority, so that residents know they can go to either the local authority or the Building Safety Regulator and that there is somebody who can pick up and deal with their concerns, is extremely important in reassuring people that they can get the work done?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I share the concerns about what my hon. Friend’s constituents are having to go through; as it stands, they are being passed from pillar to post, and people are shirking their responsibilities. A key aim of the Bill is to identify, with clarity, who is responsible for which part of a building and to make it clear that, if any works are needed, those responsible need to be up front about the schedule of work and to post regular updates, including on any changes to the works. Continuing to extend the existing powers of local authorities is vital to give them the tools to enforce these measures, especially when they are dealing with third or second freeholders, where ownership of a building may have changed multiple times. As I have outlined, and as I hope Members see, the Bill allows authorities to seek a warrant where the statutory conditions are met. I commend clauses 37, 38 and 39 to the Committee.
Clause 40 - Relevant buildings
Rupa Huq (Labour, Ealing Central and Acton)
The Question is that clause 40 stand part of the Bill. As many as are of that opinion, say Aye.
Rupa Huq (Labour, Ealing Central and Acton)
Of the contrary, No.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
No!
Rupa Huq (Labour, Ealing Central and Acton)
I think that is decisive: the Ayes have it.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
On a point of order, Dr Huq. I do not intend to detain the Committee needlessly, but for us Liberal Democrats clause 40, along with clause 1, is the most central in the whole Bill. I do not believe we have pressed Questions on clause stand part to a Division in any other case in this Committee, but on this clause, with the leave of the Chair, I will continue to shout, “No!”
Rupa Huq (Labour, Ealing Central and Acton)
If you would like to press the Question to a formal vote, we will have one.
Clause 45 - Undertakings and groups etc
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Amendment 43, in schedule 2, page 101, line 26, at end insert—
“(3A) A relevant authority may only give P, or P and a connected person, a notice if it considers it just and equitable to do so.”
This amendment incorporates the “just and equitable” test from the Building Safety Act 2022, so that a relevant authority may only give a notice for group liability where it is just and equitable to do so.
Amendment 44, in schedule 2, page 103, line 21, at end insert—
“(1A) For the purpose of this Schedule, a “connected person” is not—
(a) an institutional investor;
(b) a fund; or
(c) a build to rent investor.”
This amendment clarifies that connected person does not include passive investors and lenders.
Schedule 2.
Clause 46 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 45 introduces provisions that manage how corporations are to be treated under part 1 of the Bill. Corporate ownership of a property is often complex, using multiple companies operating within a single portfolio. Too often, the company legally responsible for building safety is not the company that holds the money, makes the decisions or controls the building, which allows those with real control of a building to avoid the consequences of non-compliance. That is why the Bill allows for certain fines in clauses 6, 13 and 36 and costs in schedule 1 to be placed on multiple parties within a group undertaking.
Clause 45(1) defines those undertakings as being part of a group if there is at least one other company connected to it through a corporate group relationship. The assets of corporate groups can be widely distributed, which is why we allow for fines in clauses 20, 26, 31 and 36 to be calculated on the basis of up to 5% of worldwide revenue.
The clause also introduces schedule 2, which ensures that liability for key remediation penalties can extend to connected persons, rather than resting with a single entity. A company should not be able to avoid the consequences of non-compliance by placing responsibility with an under-resourced entity elsewhere in its corporate structure.
Schedule 2 closes that loophole by allowing liability, in specified circumstances, to extend to a connected company that controls the entity. It sets out that those notices can be given to both the person who was responsible and to any connected persons. Where those notices have been served, both parties are jointly and severally liable.
Paragraph 2 sets out limitations as to where those notices cannot be made. It specifically sets out that where a notice has been given, parties can make representations to the relevant authority to prove that they do not exercise meaningful control of the company.
While this intervention is necessary, I recognise that it is also substantial. That is why clause 47 introduces a review period for the powers in the schedule to ensure that the powers are not retained for longer than necessary. Taken together, clause 45 and schedule 2 ensure that accountability follows real control, helping regulators hold the right people to account and preventing avoidance through corporate structuring.
Clause 46 then provides a general interpretation provision for part 1 by defining key terms used throughout the part, to provide clarity about the meaning of those terms, supporting everyone to interpret and apply the provisions consistently. The clause does not create new duties or enforcement powers. It provides the definitions needed to interpret and apply part 1 consistently.
I commend clause 45, schedule 2 and clause 46 to the Committee.
Gareth Bacon (Conservative, Orpington)
I will address amendments 43 and 44, which are tabled in my name. At present, schedule 2 makes provision for a relevant authority to serve notice on a person, or jointly on that person and a connected person, without a clear statutory requirement to consider whether doing so is fair or proportionate. Considering the scale of the financial and legal obligations that such notices can bring forward, that is clearly an omission in need of correction.
That is why we have tabled amendment 43, which incorporates the “just and equitable” test from the Building Safety Act 2022, so that a relevant authority may give notice for group liability only where it is
“just and equitable to do so.”
Amendment 43 is about consistency and fairness. After all, through the 2022 Act, which specifies that remediation contribution orders can be made only when it is
“just and equitable to do so”,
Parliament has already recognised that precedent. Therefore, Amendment 43 serves to align legislative precedents with the Bill, and I hope that the Committee will see it in that way.
Amendment 44 relates to the scandal that has come to light in the years since the Grenfell Tower tragedy, which has left Parliament, industry and other connected bodies needing to rebuild trust and confidence in the system. That trust has to flow two ways. First, and crucially, leaseholders and homeowners must be afforded the transparency, clarity and fairness to make them able to trust the system once again. As we can probably all agree, that can come only from acting on the failures of the past and fixing the failures of the present. I acknowledge that is what the Government are trying to do with the Bill.
Secondly, however, we must also inspire the industry’s trust in us and the wider legal system—trust that bad actors will be punished and that justice will be dispensed fairly. That means not targeting individuals who are passive players in the system, rather than connected people. That is why we have tabled amendment 44, which clarifies that the connected person does not include passive investors and lenders.
Any bad actor is one too many. It is crucial that we work across the House to bring to justice anyone who is guilty. Let us not, therefore, clog the courts with passive investors and lenders who are not connected to the dangerous material, and who are acting only to provide the capital investment to build new homes in good faith.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
It is a pleasure to serve on the Committee with you in the Chair, Dr Huq.
As I said earlier, the Liberal Democrats’ position is that no residents or leaseholders should be left out of pocket for faults caused by others. Our concern about the Conservatives’ amendment 44 is that it would provide a new hiding place for any developer, or any responsible person, wishing to avoid that responsibility. Too often, it is found that such promoters are hiding behind institutional investors or funds. It is not a question of those passive investors always being responsible. The question is whether they were responsible. If they were responsible for the faults, they should be held responsible.
Therefore, providing a blanket exclusion for all institutional investors, funds and build-to-rent investors is just a way of enabling people to hide behind other company structures to avoid liabilities. Therefore, we will not be able to support the Conservatives’ amendment 44.
Darren Paffey (Labour, Southampton Itchen)
It is a pleasure to see you in the Chair, Dr Huq.
While schedule 2 may look like technical company law drafting, for my constituents it is actually one of the most important parts of the Bill. That is because it is about liability. It decides whether enforcement reaches the people who actually hold the money, which is why I welcome what is in the Bill.
We can take the example of the Blake building, which I mentioned briefly in an intervention in our first sitting. If a resident asks who is responsible for their building, the honest answer is a list. There is a freeholder, Brigante Properties. It is part of the Consensus Business Group. Then there is an asset manager, a managing agent, a landowner, an estate management agent and the developer. One of my constituents, Ben, who has a young family, has put off having more children because he cannot sell a flat in the building that is now too small for him.
Ben, and others like him up and down the country, are not interested in corporate structures. They want to know who will fix their building and when. Enforcement that stops at a shell company at the bottom of the chain is enforcement in name only. What schedule 2 allows is a penalty or costs notice to be given jointly to the responsible entity and a connected person, whether that is a group company or an individual who controls it. It makes them “jointly and severally liable”.
This is how we make sure that the Bill lands where the decisions are taken. The Minister has set out very clearly that it is also fair, before a notice is given to a connected person, that they have the chance to make representations about whether joint liability is appropriate. A parent company with only nominal control can show that it does not exercise real influence. A subsidiary can be pursued only if its own acts or omissions contributed to the failure.
That brings me to the Conservative amendments, about which I have genuine questions and concerns. Amendment 43 seeks to add a “just and equitable” test. Given the safeguards in the Bill, what does that test add that existing representations and contribution tests do not? My worry is that its real effect would be to have another ground for argument and another round of legal correspondence, and therefore more delays, which I do not believe any of our constituents want. They want action.
On amendment 44, I agree with the hon. Member for Taunton and Wellington—it occasionally happens, where there is common concern—that it would mean that institutional investors, funds and build-to-rent investors could never be connected persons. Its explanatory statement calls them “passive” investors and lenders. A fund that controls a freeholder is not passive. It decides whether work happens or not. If the amendment were to pass, what would prevent every freeholder of a block with unsafe cladding from being restructured into a fund so that its owners are beyond reach? I hope the Conservatives accept that the amendment would create exactly that loophole.
There is a broader point. Leaseholders like Ben did not choose these ownership structures. They cannot see through them. They cannot move on with their lives while they exist. The least the law can do, as we propose, is to make sure that those who profit from such structures cannot hide behind them when the cost of making those buildings safe is due. That is why schedule 2 and clauses 45 and 46 should pass unamended.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
The two amendments in this group were tabled by the hon. Member for Orpington. Amendment 43 would require the relevant authority to consider it “just and equitable” before serving a notice that can make a person—or a person and a connected person—jointly and severally liable for certain financial penalties or remediation costs. I recognise the concerns behind the amendment, but schedule 2 already contains robust protections that make the amendment unnecessary.
Liability does not arise simply because a company belongs to the same corporate group. The provisions are directed at connected persons exercising influence or control over the person responsible for each breach. Before a relevant notice is served, connected persons will have the opportunity to make representations, including about whether they exercised meaningful control over the person responsible for the breach. Where a relevant notice is served, they will also have the opportunity to appeal to the courts.
Furthermore, the regulator must already be certain beyond reasonable doubt that an offence has taken place before it can impose a penalty on a responsible entity. Adding an additional “just and equitable” test would only complicate the proposed approach and risks making it harder to hold the right parties to account. That would reduce the effectiveness of these powers for enforcing authorities and, more importantly, the outcome for residents.
Amendment 44 would exclude institutional investors, funds and build-to-rent investors from the definition of a connected person for the purposes of schedule 2. I recognise the importance of investment in our housing sector. We need it, especially when we are seeing so many slow starts across the country, but we also need to ensure that these provisions are targeted and proportionate. The question should be whether a person exercises meaningful control, not simply what category of investor they fall into.
Schedule 2 addresses a specific problem. A directly responsible company may have limited resources, with control and financial resources sitting elsewhere in its corporate structure. Companies should not be able to avoid the consequences of non-compliance by leaving responsibility with an under-resourced entity. Amendment 44 would prevent liability from applying to the listed categories of investor, even where they would otherwise meet the conditions for liability. That could leave a relevant authority unable to recover a penalty or relevant remediation costs from a connected person exercising real control, simply because that person is an institutional investor, a fund or a build-to-rent investor.
Importantly, the Bill already includes safeguards. Being a parent undertaking is not, by itself, sufficient to establish liability. The safeguards provide a targeted approach. They distinguish between investment alone and the control or involvement that can justify extending liability. An investor should not be held liable merely because it has invested. Equally, investor status should not provide an automatic exemption where the conditions for liability are met.
My hon. Friend the Member for Southampton Itchen highlighted the case of his constituent Ben in the Blake building. Many of us have constituents like Ben. We have all received many emails about situations where leaseholders are caught having to do multiple searches just to find out who owns their building. Leaseholders have to take time off work, and some have a whole case file, just to establish who owns the building and who will take responsibility. It is important that we highlight who owns the buildings and make sure that they pay the financial penalty for the failed buildings that have gone up, while leaseholders continue to pay monthly, continue to receive large bills in the post and, in some cases, continue to receive legal threats for non-payment.
We hope that the measures outlined in the Bill will help to identify owners and give leaseholders the confidence that they will be able to seek remediation from the right person at the right time. The Government therefore consider that the existing provisions strike the right balance between protecting investment and ensuring that accountability follows real control. For those reasons, we cannot accept amendments 43 and 44, and I urge the hon. Member for Orpington not to press them.
Gareth Bacon (Conservative, Orpington)
Amendments 43 and 44 were both intended as probing amendments. I listened carefully to what the Minister said, and I am content not to press them.
Clause 47 - Repeal of Chapter 1 etc
Gareth Bacon (Conservative, Orpington)
I beg to move amendment 46, in clause 47, page 26, line 5, leave out “five years” and insert “one year”.
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Amendment 47, in clause 47, page 26, line 7, leave out “five years” and insert “one year”.
This amendment would require the review of whether it would be appropriate to repeal Schedule 2 every year rather than every five years.
Amendment 48, in clause 47, page 26, line 7, at end insert—
“(3A) The review specified in subsection (3) must include, but shall not be limited to, the following—
(a) the remediation progress,
(b) specialist capacity,
(c) prosecutions and
(d) penalties.”
This amendment would ensure the review considered remediation progress, specialist capacity, prosecutions and penalties.
Clause stand part.
Gareth Bacon (Conservative, Orpington)
Amendments 46 and 47 were tabled in my name. They have a practical purpose and encourage a common sense approach to the Bill’s wider impact. At present, the clause invites the Secretary of State to carry out a post-implementation review of the Act every five years. We agree that there should be a review, but we think that for an issue as important as this, half a decade is probably four years too long. That is why the amendments would require a review of whether it would be appropriate to repeal schedule 2 every year, rather than every five years.
The proposed impact of the Bill is mighty, including sweeping new sanctions, duties, guidance, liabilities and ramifications—all in the name of the vital aim of accelerating remediation to end the cladding crisis. We support that, but we must ensure that it is working as best it can and as intended—whether for leaseholders trapped in unsafe homes, for an industry that needs to carry out essential works or for courts that need the power to dispense justice.
James Asser (Labour, West Ham and Beckton)
I have a question about the change to the timescale. I can understand the hon. Gentleman’s argument for why five years could be too long. However, given the length of time that reviews often take, does he not feel that requiring one every year will mean that we could be finishing one review and then having to start another—or even have them overlapping and creating a rolling programme that never gets a review done properly?
Gareth Bacon (Conservative, Orpington)
I do acknowledge the danger that, if a review was started from scratch each year, we might have precisely that problem. However, that is not what we are proposing. If it were set up badly, that is what we would get, but I trust implicitly that the Government would not set it up badly. I am sure that they would set it up perfectly well—I trust the Minister and her officials. We consider any flaw in the system that prevents things from happening effectively and swiftly to be a flaw that we cannot wait five years to fix. Amendments 46 and 47 are designed to ensure that we spot such flaws, so that we can fix them quicker and keep remediation works on track.
I turn to amendment 48. Last week in our evidence sessions, we heard about the desperate and damaging lack of specialist capacity, such as fire risk assessors, when it comes to the acceleration of the remedial works that residents deserve. Shortages create blockages, and blockages mean that work is not getting done. The Bill proposes sweeping new powers, orders and mechanisms that impact a number of sectors. It is vital that, as with fire risk assessments, we do not let shortages inhibit the Bill’s best points from coming into force as effectively as possible. That is why amendment 48 seeks to ensure that the review in clause 47(3) considers remediation progress, specialist capacity, prosecutions and penalties. These areas are the crux of the Bill’s intentions, and all require full consideration from the powers that be. Any shortage, blockage or inhibiting factor in these areas risks derailing the core of the Bill’s delivery aim, which is of course safe homes for residents.
I turn to new clause 5, which is tabled in my name. In our evidence session, it was made clear to us that the shortage of skilled professionals is a weakness in system now, but the Bill does not do anything meaningful to fix that. We contend that the issue needs attention now, not later. Many of the measures in the Bill will be rendered unviable if there is no one to carry them out. A law proposing material changes to buildings is only as powerful as the people available to carry out the work that it mandates.
The experts are warning us now—as they have for some time—of this fault. As the shadow Secretary of State, my hon. Friend the Member for Weald of Kent (Katie Lam), highlighted on Second Reading, the National Fire Chiefs Council, responding to the Public Accounts Committee, warned that
“limited workforce capacity was the primary bottleneck to remediation.”
My hon. Friend went on:
“The then NFCC chair, Mark Hardingham, put it best when he said that
‘we cannot enforce our way out of the cladding crisis.’”—[Official Report, 27 October 2026; Vol. 792, c. 222.]
That is why new clause 5 would require the Secretary of State to assess before the commencement of the Bill, and annually thereafter, whether there was sufficient specialist capacity to enable the delivery of the new duties that it will create when enacted.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I come back again to the shadow Minister’s days chairing the London Assembly fire committee, as well as the work of firefighters across the country. I recognise that, for a number of those firefighters, complex training takes many years. Does he agree that the £30 million invested by MHCLG to build a workforce programme to expand fire engineers’ education and research, including bursaries for new prospective entrants, will help us to increase that workforce capacity? As the Bill progresses, we will continue to monitor the workforce capacity, so that any pressures can be identified as they emerge. Does the shadow Minister feel that this is a reasonable approach to ensure that we have the right capacity?
Gareth Bacon (Conservative, Orpington)
Although that acknowledges the problem and tries to move us in the right direction, we are not there yet. The Bill is in front of us now. All we are asking for is an annual written ministerial statement, which is hardly a tall order when the very hopes of accelerating remediation lie at the mercy of finding professionals to make it happen. It is our responsibility now to set up a remediation plan that actually succeeds.
Peter Fortune (Conservative, Bromley and Biggin Hill)
Of course, any kind of investment is welcome. However, investment alone does not mean that people are instantly trained. That also takes time, which I think the new clause seeks to facilitate.
Gareth Bacon (Conservative, Orpington)
That is entirely correct—my hon. Friend has put his finger on it. Good intentions are welcome. Putting money into the system is also welcome, but it is the outcome that matters, not whether we are spending money. Simply spending money now does not mean that we will have something straightaway, so my hon. Friend is completely right. Our duty to residents trapped in dangerous homes is to make sure that the groundwork is done proactively, rather than our trying to play catch-up later.
With regard to new clause 6, there is general agreement across the House that more homes need to be built. I think we all agree on that, but despite a lot of talk at the outset of the Parliament, the Government’s record is not great—and future projections show that they will manage to build up to 400,000 fewer homes than they promised. Almost nothing must come between the desire to build more homes and seeing them actually built. However, I think we can all agree that that cannot come at the expense of building safety.
We must only build units that are safe, warm and secure for the families, first-time buyers and residents investing their time and money into what they can call their home. We must reconcile that fact with the crippling housing shortage that we have, two and a half years into this Government’s tenure. Families are waiting for homes, renters are watching their hopes of finding a home dwindle as rents rise, and the Government’s targets are far off being met.
It is right that any impact on house building is closely monitored, including through the Bill. That is why we have tabled new clause 6, which would require the Secretary of State to report on the effects of the Bill on residential building. That would support investors and developers where rules have created uncertainty. It would help Ministers understand the house building landscape, and provide information crucial to sustainable and accelerated house building rates. This is not about questioning the Bill’s intentions, which we support—I want to make that crystal clear; it is about watching how the Bill interacts with other key metrics in the system.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I rise to make a couple of brief points about the Liberal Democrats’ position on the amendments. Although we have no argument with the points that the shadow Minister made about reviews of capacity, which is an issue, I am not sure that reviewing the Bill’s impact on house building numbers avoids trying to balance safety against housing numbers.
We have no objection to reviews of general areas, but it is worth bearing in mind the significance of clause 47, which allows the entirety of chapters 1 and 2—in fact, most of the Bill—to be repealed. The whole regime could be repealed following a review, and the Conservatives’ amendments 46 and 47 would have the effect of hastening that repeal. We do not believe that clause 47 should be included at all, because we do not believe that the provisions for assessment and remediation should be repealed. They are likely to be needed for a long time to come.
The shadow Minister said that we cannot regulate our way out of a crisis, which shows some of the challenges in front of us. We will oppose attempts to hasten the repeal of provisions that are there to protect people and to provide assessment and remediation.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I will begin by speaking to clause 47, then I will turn to the amendments tabled by the hon. Member for Orpington.
Chapter 1 introduces targeted measures to accelerate remediation and tackle a historic building safety risk. However, these targeted measures may not be needed indefinitely. An automatic expiry date could leave remediation unfinished, which is why clause 47 allows the Secretary of State to make regulations to repeal chapter 1 and schedule 2 when their provisions are no longer necessary or proportionate. For chapter 1, the test is clear: the Secretary of State may repeal it only when they consider that its duties are no longer necessary to secure the proper remediation of external walls of relevant buildings in England.
Schedule 2 allows liability for certain financial penalties and remediation costs to be extended to group undertakings. Given the scope of that liability, the Secretary of State must review whether it would be appropriate to repeal schedule 2 within five years of part 1 coming into force and for every five-year period thereafter. The clause also introduces important safeguards. Residents, representatives, relevant enforcement authorities and other persons considered appropriate must be consulted during those reviews and before either repeal power is exercised. The reviews make sure that the legal framework remains appropriate and proportionate as remediation progresses. I commend clause 47 to the Committee.
Amendments 46 and 47, tabled by the hon. Member for Orpington, would replace the five-year review periods for schedule 2 with one-year periods. Again, I recognise the importance of making sure that the provisions are kept under scrutiny, but if a one-year time limit was set, we would first review the liability regime at the same time as the deadline for the assessments came into fruition and before the remediation compliance plan deadline. A review within the first year may tell us relatively little about how the provisions are working in practice. Repeating that statutory process every year would require further consultation and reporting.
Lewis Cocking (Conservative, Broxbourne)
A number of us have raised concerns about communication with residents. Does the Minister agree that a one-year review period would at least keep residents informed? Even getting a letter saying “We are still working on it and nothing has changed” in the first year, for example, would be much better than a five-year review period, which will keep residents in the dark for long periods without the communication that they deserve.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank the hon. Member for that important point. It is right that residents should be regularly communicated with. We feel that the five-year period is better because the Bill provides for residents to be updated with any changes in any of the works within the remediation.
A review within the first year would tell us relatively little about how the provisions are working. It is difficult to see how that would be a proportionate use of valuable public resources. The question is therefore not whether there should be regular scrutiny, but what review period would make that scrutiny most useful for all our constituents. Given the length of time that the remediation projects might reasonably take and subsequent timelines for enforcement, we feel that the five-year cycle strikes the right balance. It provides time to assess how the regime is operating while ensuring that its continued use remains subject to regular scrutiny. For those reasons, the Government cannot accept the amendments. I urge the hon. Member for Orpington to withdraw them.
Amendment 48, tabled by the hon. Member for Orpington, would require the planned five-year statutory review of schedule 2 to include considerations of remediation progress, specialist capacity, prosecutions and penalties. I recognise the intention behind the amendment. I also agree that the decisions about the future of the provisions should be informed by evidence about remediation and how the regime is working.
However, nothing in the existing review requirements prevents those proposed statutory commitments being considered. My objection is therefore not to considering those matters—nor do I suggest that the amendment excludes other evidence—but to requiring those four broad subjects to be assessed in every review when they may not tell us whether this particular extension of liability should remain in place. For that reason, the Government do not consider the amendment necessary and I ask the hon. Member to withdraw it.
New clause 5 would require the Government to report on the availability of fire engineers, assessors and contractors before the Bill comes into force, and every year after that. It would also require those reports to assess the amount of work for those specialists arising from the Bill. Specialist capacity is important to delivering remediation, and we are already monitoring the market closely. As I have mentioned, our current analysis indicates that there is enough overall capacity to support remediation. We appreciate that pressures can arise in parts of the supply chain. Capacity can change throughout the year, so an annual report would only provide a snapshot of the market.
The specialists also work across remediation, fire safety and the wider built environment, not just on work created by the Bill. Looking at Bill-related demand on its own could therefore give an incomplete picture of the pressures across the market. Ongoing monitoring and engagement with suppliers gives us a better way to identify pressures as and when they emerge.
We are also taking longer-term action to strengthen the competence and capacity of the fire-risk assessor and fire engineering professions. Our priority should be practical action to strengthen capacity and respond to pressures, rather than creating a fixed statutory reporting requirement in the Bill, with little outcome to benefit industry capacity or residents. I ask for the new clause to be withdrawn.
New clause 6 has also been tabled by the hon. Member for Orpington. I understand that it seeks to ensure that the Government considers the impact of the Bill on new housing supply.
This Government believe that everyone deserves to live in a safe and decent, secure and affordable home. To achieve that, we are taking action across the housing system to increase supply, including through planning reform and major long-term investment. That includes more than £40 billion in the social and affordable homes programme and £16 billion in the National Housing Bank, which is expected to support more than 500,000 homes and unlock £53 billion of additional private investment.
I have explained that the Government are committed to maximising housing supply. A legislative commitment to report on the specific impact of the Bill is unnecessary for the following reasons. First, the Bill’s impact assessment already estimates that the Bill will have a negligible impact on housing supply. Secondly, the evidence presented by Vistry at our Committee evidence session confirmed the case presented in the impact assessment. The Bill’s provisions on construction product manufacturer redress are expected to help developers to recover the costs of historic remediation, which may benefit housing supply. Finally, the Department already publishes annual statistics on how many net additional homes have been delivered. That captures the number of new builds and gains from conversions and change of use, subtracting losses from demolitions and other changes to housing stock.
For those reasons, we cannot accept the new clause. I ask the hon. Member for Orpington to withdraw it.
Gareth Bacon (Conservative, Orpington)
I will respond to Members’ comments in the order they were made, so apologies if this is a slightly scattergun response.
First, the hon. Member for Taunton and Wellington was, I think, commenting on new clause 6 when he said he was not sure how reviewing the impact of the Act—which the Bill will become—under that new clause would relate to house building numbers, and the Minister also talked about that. It is a question of viability. There have been a lot of changes in the planning and development sphere over the last five to 10 years. Most have been entirely well meaning—they are not intended to be a hindrance—but cumulatively they result in the situation we have right now, which is that the viability of the house building sector has taken an enormous hit. At a time when the demand for housing in this country is greater than it has ever been, almost nothing is getting built. We are seeing numbers decline, not increase.
All new clause 6 asks for is an assessment of the impact on house building after the Act takes effect. The Minister talked about the impact assessment, which we heard about last week. An impact assessment is a forecast. What is wrong with testing the reliability of that forecast after the event? If all the Government’s impact assessments were always correct, house building would be going gangbusters at the moment, but it is not. That is what we are asking for with new clause 6.
The hon. Member for Taunton and Wellington said that amendments 46 and 47 would repeal the Bill. Of course they would not. That is not our intention at all. It is simply about looking at how the Act functions and, if it does not function as intended, tweaking it to make it function better. That is all that those amendments are about.
I think the Minister and I have more in common on amendment 48, although I know she will resist it. We asked for four specific areas to be included in any assessment. The amendment says that the review
“must include, but shall not be limited to, the following”,
so there is no intention to limit anything. We think those four relevant areas should be included in any assessment.
Regarding new clause 5, I think the hon. Member for Taunton and Wellington accidentally misquoted me when he said that I said we cannot regulate our way out of a cladding crisis. That is not what I said. I was quoting the former chairman of the National Fire Chiefs Council, who said that
“we cannot enforce our way out of the cladding crisis.”
He made that comment specifically in relation to lacking the personnel to get the changes through. That is why he made that comment, and that is why I agree.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I am grateful for that clarification on new clause 5. On the point about repealing the Bill, I hope the hon. Gentleman will accept that clause 47, to which amendments 46 and 47 apply—they refer to reviews under that clause—is about repealing chapter 1 and schedule 2. Is it not the case that making those reviews in respect of repealing the Bill more frequent—yearly—would hasten the repeal of those parts of the Bill?
Gareth Bacon (Conservative, Orpington)
No, I do not agree with that interpretation. I can sense that we are not going to have a meeting of minds. I will be pressing all the amendments in my name to a Division.
Clause 48 - Medium-rise buildings
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clauses 49 and 50 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Part 2 of the Bill establishes a medium-rise building register. We already know the value of having a statutory building register. Since 2023, higher-risk buildings have been required to register with the Building Safety Regulator. That has given us a much clearer picture of the 18-meter-plus building stock and supported the identification of buildings that require remediation. However, there is no equivalent register for residential buildings of heights between 11 metres and 18 metres in England. Homes England has done significant work to identify the vast majority of medium-rise buildings that may require remediation, but without a statutory register of the entire medium-rise stock, we cannot have confidence that every building has been identified.
Clause 48 provides a foundation for part 2, by defining what is considered a medium-rise building for the new registration scheme in England. A medium-rise building must contain at least two residential units. It must be at least 11 meters, but under 18 metres, or be five or six storeys. The definition covers existing occupied buildings. It also covers buildings built or converted into homes in the near future.
Importantly, the clause creates a clear boundary between medium-rise buildings and higher-risk buildings, through alignment with the definition of a higher-risk building in the Building Safety Act 2022. Buildings of at least 18 metres in height or with at least seven storeys remain within the higher-risk building regime. The clause also allows the Secretary of State to make supporting regulations to explain how height and storeys are to be measured, what counts as a building and which buildings are excluded.
Finally, the clause allows the Secretary of State to amend the medium-rise building definition through regulations. That might be needed to maintain a clear boundary between the two regimes if the definition of a higher-risk building changes, or to reflect other changes in policy.
Clause 49 sets out the processes for determining who the registration duty holder is for a medium-rise building. The duty holder will be responsible for registering an occupied medium-rise building and providing information. They may also face financial penalties and potential prosecution if they fail to comply with those duties.
Rather than creating a new duty-holder concept for medium-rise buildings, clause 49 builds on the existing framework in the Building Safety Act 2022. This promotes consistency and supports effective implementation. In general terms, the term refers to the person with legal responsibility for the repair and maintenance of the building’s structure and exterior, including its external walls.
There may be cases in which more than one person meets the test for being the registration duty holder. In such circumstances, they can decide to nominate one of them to the registrar to be the duty holder. If there is uncertainty or disagreement about who the registration duty holder is, clause 49 allows an interested person to apply to the first-tier tribunal for a determination.
Clause 50 establishes the registrar for the medium-rise buildings register, who will be responsible for keeping, maintaining and administering the register. The registrar will either be the Secretary of State or a person prescribed in regulations. If another person is appointed as registrar, the clause provides for the practical arrangements needed to make the appointment work. That provides flexibility in how the register operates and is delivered, so that it can adapt to changes in the wider regulatory framework over time.
At the same time, clause 50 contains a safeguard to make sure that, even when the Secretary of State is not the registrar, they can still exercise control where needed through a power of direction. Overall, this approach strikes the appropriate balance between accountability and oversight, and the operational flexibility needed to deliver the register effectively. I therefore commend clauses 48 to 50 to the Committee.
Rupa Huq (Labour, Ealing Central and Acton)
We are now sitting in public and proceedings are being broadcast. Before we begin, I remind Members please to switch their electronic devices to silent, and that tea and coffee are prohibited during sittings.
Clause 51 - The register
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I beg to move amendment 9, in clause 51, page 28, line 31, at end insert—
“(3) Regulations under subsection (2) must require that—
(a) the register includes information on any building for which an external wall assessment has concluded that fire safety risks are tolerable without physical remediation or cladding removal having been completed; and
(b) information under paragraph (a) shall be published in a publicly accessible electronic format at intervals of no more than 3 months.”
This amendment requires quarterly public disclosure of all buildings that have been signed off under risk-balancing guidance (such as PAS 9980) as “tolerable” without physical removal of unsafe materials.
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Clause stand part.
Clauses 52 to 54 stand part.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I considered moving an amendment that tea and coffee be allowed in sittings. [Hon. Members: “Hear, hear!”] That will be the best response I get all day. Clearly, I have been missing something all this time.
I know that Members will be even more excited about the amendment, which would require public disclosure of all buildings that have been signed off under risk-balancing guidance, such as PAS—publicly available specification—9980, as presenting a tolerable risk without the cladding having been removed or the works having been carried out.
The amendment anticipates that our earlier amendments that would have replaced PAS 9980, the risk-based approach that allows tolerable fire risks to remain in buildings even after remediation, would not succeed. Our amendments would have put remediation standards at the same level as the standards we require of new build homes. Those amendments having fallen, amendment 9 would deal with buildings that have been remediated already under the regime in which unsafe, flammable cladding remains on the buildings even after remediation.
I have been to buildings of that nature. There are a number around the country. Under this scheme, there will be a lot more as time goes on. It is therefore essential that it is made clear and public where such buildings are—where buildings have been remediated but the unsafe, flammable cladding remains, it having been decided that that is a tolerable risk.
No doubt the Government will point to provisions to ensure that remediation plans are made available publicly. However, not all buildings will have a remediation plan and the residents will therefore not necessarily know whether it was decided that the risk was tolerable and no remediation was necessary, perhaps even with flammable cladding remaining on the building. With no remediation plan, residents and others will not know that that is the case, unless we agree the amendment. Unfortunately, it may not be quite as popular as the tea and coffee amendment; none the less, I think it is equally deserving of support in Committee. Even if remediation plans are made available, those will not include the full fire risk assessment of external walls, so again the residents will not know exactly what the fire risk assessment was.
The Government may also point to article 21A of the Regulatory Reform (Fire Safety) Order 2005, under which a summary of the defects may be provided, but again that is only a summary. Where cladding remains, posing what is described as a tolerable risk, it is important that residents and the public know that that is the case. We therefore propose amendment 9 to improve the Bill and to provide that information, so that tenants know about this risk-based approach.
If in the Bill, we go ahead with an approach where it may be decided that risk is tolerable—where a building does not meet the building regulations that we would require of a new build today—surely the least that we should do is to publish all the information, so that residents and the public are aware. On that basis, I commend the amendment to the Committee.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank the hon. Member for his amendment. I will explain the clauses in this group first. Clause 51 requires a registrar to establish and maintain a register of medium-rise buildings in England, which will give the Government and regulators a more complete and authoritative picture of medium-rise building stock. That will provide an important safety net for remediation, helping us to identify buildings that may still require action and those responsible for them.
The value of the register goes far beyond the current remediation programme: it will provide a lasting national dataset of medium-rise buildings, which will help Government and regulators to respond more quickly and effectively to wider or emerging safety risks both now and in the future.
Darren Paffey (Labour, Southampton Itchen)
Departmental figures from the Ministry of Housing, Communities and Local Government show an estimate of between 1,100 and 2,500 such buildings as yet unidentified. Can the Minister give us the assurance that the register proposed in clause 51 is a sure-fire way of making sure that none of those buildings slip through in the future as they have done in the past?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank my hon. Friend for raising that important point. It is important that regulations will outline a transitional period in which existing buildings will be required to register. After that, the registration duty holders will be required to keep that information up to date if anything changes. The register is important because it will be held by the registrar, who may be the Secretary of State or another appointed person, and will contain key information needed to support building remediation. It is a good way to ensure transparency, as opposed to leaseholders having to go through a rabbit warren just to find out which buildings are on it and which are not.
Clause 51 gives the Secretary of State powers to set out how the register will work in practice. Regulations may specify what information the register must contain, how it should be updated and what feature it should have. They can also set out how information on the register may be published or shared. Those powers are important, because the register needs to remain accurate, accessible and secure, and may need to be changed in the future to respond to regulatory needs.
Clause 52 sets out how a medium-rise building is added to or removed from the register. Its purpose is to provide a clear and efficient registration process that supports compliance and keeps the register accurate. This clause also allows the Secretary of State to make regulations covering practical details of registration and removals.
Clause 53 allows the registrar to charge fees for the medium-rise buildings register, which can cover the cost of setting up, maintaining and running the register. The clause provides a fair and sustainable way to meet those costs. The aim is to recover the cost and not deliberately make a profit. Regulations may set the fees directly and may also allow the registrar to set them under a published scheme or formula. What this means for registration duty holders is that there will be an up-front registration fee to pay at the point of registration—transparency is key. There may also be fees for applying to amend or update information already held on the register. The clause also allows for regulations to set out what happens if the fee is not paid.
Clause 54 requires the registration duty holder to ensure that a medium-rise building is registered whenever it is occupied. For existing occupied buildings, regulations will set a transitional period for registrations, and for new or reoccupied buildings, regulations may allow a set period after occupation for registration. Taken together with the existing higher-risk buildings register, the medium-rise register will help to provide a much clearer picture of multi-occupancy buildings in England. I commend clauses 51 to 54 to the Committee.
On amendment 9, the Government agree that residents should have access to clear and reliable information about the safety of their building. However, we do not believe that this detailed requirement should be on the face of the Bill. The duty to register will apply to all occupied medium-rise buildings, regardless of the outcome of any external wall assessments. Clause 51 will give the Secretary of State the power to determine what information a register must contain, how it must be updated and what information should be published or disclosed. These are detailed and operational matters more appropriately dealt with in secondary legislation.
We must ensure that information is accurate, proportionate and handled appropriately. In developing the regulations, we will carefully consider what information, including information relating to external wall assessments, should be recorded and potentially published. We do not want to pre-empt that process by imposing one.
Gareth Bacon (Conservative, Orpington)
The Minister is generous in giving way. I know that the hon. Member for Taunton and Wellington will speak for himself, but I suspect that he tabled this amendment because of the level of discomfort exposed to the Committee during the oral hearings about the question of tolerability and what is “tolerable”. As he said, he did indeed table amendments taking that out or clarifying it. I suspect that this is a safeguard so that, where buildings are declared to be tolerable but may still have flammable cladding on them—because this is a risk-based rather than absolutist approach—this provides a safety net. Would the Minister be willing to assure the Committee that when the secondary legislation is drafted, that will be part of the consideration?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Having heard some of the concerns around tolerable and non-tolerable, we have to be clear, not pre-empt any thing and have the flexibility within the Bill to update the regulations. We do not want to pre-empt that process by imposing one specific category of information and quarterly publication requirements in primary legislation.
Gareth Bacon (Conservative, Orpington)
I apologise for taking up time again. Would the secondary legislation that we are discussing be dealt with under the affirmative or negative procedure?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I am happy to write to the hon. Member to clarify that and so that I do not make any incorrect commitments.
Having set out the detailed reasons for rejecting the amendment, I hope that the hon. Member for Taunton and Wellington will agree that this level of detail should not be placed on the face of the Bill and that instead we should update regulations as and when needed. For those reasons, the Government cannot accept this amendment, and I ask him to withdraw it.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I listened carefully to the Minister, but this amendment simply requires that the register includes information on any building for which an external assessment has concluded that fire safety risks are tolerable without physical remediation or cladding removal having been completed. This amendment does not seek a huge amount of detail; it is simply telling people in these buildings, “This is the situation.” I am struggling to think of reasons why we should not be doing that.
Peter Fortune (Conservative, Bromley and Biggin Hill)
My understanding of the verbal evidence from Dame Judith Hackitt was that having a set standard—something that was clearly definable—would help the industry to understand its responsibilities. It is fighting against that flexibility that has made the scheme in Australia so successful.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
The hon. Gentleman highlights the exact point underlying this amendment. The Bill does not go down the line that Dame Judith Hackitt and other witnesses suggested, which was a clear, objective standard. We proposed the building regulations standard—as exists for new homes—but there may be other approaches. The hon. Gentleman is absolutely right that the example from Australia was just such an objective test. We do not have that. We have a different test where owners can conclude, on the basis of reports from fire safety assessors that they have appointed and paid for, that risks are tolerable and that flammable cladding should remain. All this amendment asks is that those buildings are listed publicly—nothing else. On that basis, I intend to press this to a vote.
Clause 55 - Provision of information to the registrar and other persons
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I beg to move that in any Bill proceedings, hot beverages—oh no, forgive me; that’s the wrong one.
I beg to move amendment 7, in clause 55, page 30, line 13, after “building” insert—
“(ba) leaseholders of the building”.
This amendment, in connection with Amendment 8, would include leaseholders of buildings as a group to whom prescribed information shall be provided.
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Amendment 8, in clause 55, page 30, line 15, at end insert—
“(1A) The regulations must make provision to require the provision of full copies of any fire risk assessment of external walls, remediation compliance plan, and underlying fire safety data to the registrar, residents and leaseholders of the building.”
This amendment, in connection with Amendment 7, would require the Secretary of State to make regulations requiring medium-rise building duty-holders to provide full external wall fire risk assessments, remediation compliance plans and safety reports directly to residents and leaseholders.
Clause stand part.
Clause 56 stand part.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
Amendments 7 and 8 would require the Secretary of State to make regulations requiring medium-rise building duty holders to provide full external wall fire risk assessments. No Bill is complete without a few new acronyms, and this Bill has FRAEWs: fire risk appraisals of external walls, which are the key documents for any resident concerned about cladding in their building, owners and other stakeholders.
The amendments would include leaseholders in the group that receives the information and ensure that FRAEWs were included in the information for leaseholders. This is a general information point. As I have said, the provisions in the Bill would provide remediation plans, but I am sure that someone living in a flat will want to know what the assessment of its external walls was, whether or not the remediation plan will deal with it.
Sean Woodcock (Labour, Banbury)
I am sympathetic to what the hon. Member is saying, but as somebody who worked for 15 years dealing with fire risk assessments in my previous role in social housing, I know that they are often quite complicated documents. I wonder whether trying to give more information to residents is the wrong angle, because it might obscure the wood for the trees.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I will take the wood or the trees. At the moment, we have neither. No level of information is available to leaseholders apart from the remediation plan. As we have discussed, remediation plans will not always exist, so the level of information will be zero—neither wood nor trees—for people in those buildings. That is why it is important that this information be made available. I look forward to the Government’s response.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 55 is about making sure that the right people have the right information about medium-rise buildings. The Hackitt review of building regulations and fire safety identified that accurate and timely information is essential for building safety. The registrar needs reliable information to oversee the safety framework, and residents also need clear information about their building. That is why clause 55 will allow regulations to require the registration duty holder to provide prescribed information to the registrar, residents and other people specified in the regulations. The regulations may say when and how the information must be provided; they may also set its format and standard. The clause also allows regulations to clarify whether information given to the registrar can be used in criminal proceedings. This does not create a new offence or penalty; it simply makes the evidential position clear.
Clause 56 will establish the framework for managing a change in the registration duty holder. It is designed to ensure that both an incoming duty holder and a registrar have the information needed to keep the building’s registration accurate and up to date. Where responsibility changes hands, the outgoing duty holder must give prescribed information to both the incoming duty holder and the registrar. These requirements will help to ensure the continuity of information where responsibility changes, and they will maintain the accuracy of the register. I commend clauses 55 and 56 to the Committee.
I turn to amendment 7. I fully recognise the importance of leaseholders having access to clear and appropriate information about their building. However, the amendment is not needed to achieve that, because the Bill will already provide the necessary power. Clause 55 will allow regulations to require the registration duty holder to provide prescribed information to any other prescribed person. That power is broad enough to include leaseholders where it is appropriate to do so.
Darren Paffey (Labour, Southampton Itchen)
I have a concern. In Southampton, we have residents from several blocks—Sirocco, Mistral and Ranger—who are not residing in their homes because they have been decanted to fix and remediate them. They would not necessarily count as residing in the building at the time, so can the Minister confirm that the regulations would include such leaseholders, whether they are in the building at the time or temporarily residing elsewhere?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
The responsible entity or duty holder for any building has to take reasonable steps to ensure that they contact all leaseholders or others with legal ownership or interest in the building. That could include ensuring that the plans are published on a company website—or the responsible entity’s website, if they have one—as well as displaying a notice that highlights and explains where residents can view that information. I think it is really important that those documents are available to everybody, including people who do not reside in the property.
On amendment 8, we agree that residents and leaseholders should receive clear and useful information about the safety of their building. However, the existing legal framework already provides for relevant fire safety information to be recorded and shared. Under the fire safety order, responsible persons must record their fire risk assessments and give residents comprehensive and relevant information about identified risks and the measures in place to address them.
The Building Safety Act 2022 also provides an established framework for requiring information and documents to be given to the regulator, residents and residential unit holders in higher-risk buildings, and other prescribed persons. The Bill builds on that framework. Clause 55 will enable regulations to require registration duty holders to provide prescribed information to the registrar, residents and other prescribed persons. Separately, the Bill requires remediation compliance plans to be published and shared with residents and others, including—as my hon. Friend the Member for Southampton Itchen has just highlighted—anyone with an interest in the building.
The amendment would go further by requiring full copies of every assessment and all underlying data to be provided automatically in every case. But requiring full and technical documents and all underlying data to be shared automatically would not necessarily given residents clearer or more useful information. Information provided to the registrar for regulatory purposes may not be the same as the information that residents need to understand the risks in their building and what is being done about them. For those reasons, we cannot accept the amendments. I ask the hon. Member for Taunton and Wellington to withdraw amendment 7 and not to press amendment 8.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I have it written in my notes that if the Government committed to dealing with the amendments in regulations, that would be a reasonable basis on which to withdraw. However, while the Minister said that the regulations would provide a power for leaseholders to be told this information, and for those all-important fire risk assessments to be included, there was no commitment. I understand that the Minister does not wish to give commitments—that is the Minister’s and the Government’s privilege—but having not had that assurance, we will stand by our amendments, because leaseholders should receive this information.
When it comes to the criticism that such provision should not be on the face of the Bill, we are—I will not say scraping the barrel, but reaching arguments that perhaps it is agreed in principle but we do not want to use particular words in the amendment, or whatever. On that basis, we will maintain our position and press my amendments to a vote, unless the Minister wishes to give an assurance that what the amendments seek will be done via regulations.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I reassure the hon. Member that residents are expressly contained and mentioned in the Bill because they will have a direct interest in the buildings they live in. As things stand, the regulations will provide the flexibility to specify other appropriate recipients, including leaseholders. Does the hon. Member agree that that is a sensible and clear way forward?
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I certainly welcome those provisions in the Bill. We do not doubt the sincerity with which the Minister is prosecuting the Bill and pursuing its provisions to help those affected by the cladding scandal, but providing the flexibility to do something is not quite the same as actually doing it. Our amendments would deal with that issue. They could be voted into the Bill right now and then we could all move on, with a better Bill in front of us. On that basis, I will press them both to a vote.
I wish to divide the Committee on amendment 7.
Clause 57 - Financial penalties for non-compliance
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clauses 58 and 59 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 57 will establish a financial penalty regime for non-compliance with part 2 registration and information provision duties. It will allow enforcing authorities to impose financial penalties when a registration duty holder fails to meet key duties, such as by failing to register an occupied building and/or provide the required information, by failing to pass the information to a new duty holder, or by failing to tell the registrar when the duty holder changes.
When an enforcing authority is satisfied beyond reasonable doubt that a duty holder has breached such a duty, the authority may impose an initial penalty of up to £7,000. If the failure continues beyond 28 days, the authority may impose a further penalty of up to £40,000. Still further penalties may follow if the same failure continues. The higher penalties are for persistent non-compliance: they make it clear that duty holders cannot simply pay the initial penalty and continue to ignore the law. The clause also includes safeguards: a duty holder can appeal the fine, and they cannot be penalised if they satisfy the enforcing authority that, on the balance of probabilities, they had a reasonable excuse for the failure.
Clause 58 will allow the authority to take stronger action in the form of criminal prosecutions if the failure continues despite the imposition of the financial penalties. Under the clause, a registration duty holder commits an offence liable to criminal prosecution if the failure is still ongoing 28 days after a financial penalty was imposed under clause 57. If the duty holder appeals, the 28-day period will start the day after the appeal concludes. A person prosecuted and found guilty is liable on conviction to a fine. They will have a defence if they can show that they had a reasonable excuse.
Clause 59 will protect the accuracy and integrity of the medium-rise buildings register. It will make it a criminal offence for a registration duty holder to knowingly or recklessly provide false or misleading information. That applies to information given to the registrar and to information given to an enforcing authority carrying out its functions under part 2. The offence targets deliberate or reckless conduct; it does not target honest mistakes. Regulators may prosecute the offence through the courts. If convicted, the person may receive a custodial sentence, a fine, or both. Alternatively, an enforcing authority may impose a financial penalty of up to £40,000. It must be satisfied beyond reasonable doubt that the offence was committed. I commend clauses 57 to 59 to the Committee.
Clause 60 - Right of review
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clause 61 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 60 will give people affected by certain registrar decisions the right to ask for a review. This is needed so that those decisions can be challenged fairly but effectively. It will give the registrar an opportunity to reconsider the decision before an affected person pursues a formal appeal.
The clause covers decisions to add a building to, or remove it from, the register under clause 52. For those decisions, the affected person is the registration duty holder. Regulations may bring other registrar decisions within the review process and specify who can request a review. Regulations will also set out how a review must be requested, including the timeline, the form of the notice and the information that it must contain.
Once a review is requested, the registrar will decide the nature and extent of the review. This allows the review to reflect the issues and circumstances of each case. The registrar must consider information provided by the affected person in time and may consider any other relevant information. This ensures that decisions can be considered in the light of all relevant evidence.
At the end of the review, the registrar must either uphold or vary the original decision. It must also notify the affected person of the outcome and the reasons within the required period. If the registrar does not notify within the required period, the original decision is treated as upheld. The affected person must be told as soon as is reasonably practicable.
Clause 61 will give an affected person a right of appeal to the first-tier tribunal. An appeal can be made after the registrar has reviewed the decision under clause 60. Clause 61 sets out clear grounds for appeal. A decision to add or remove a building from the register may be appealed if it was based on an error of fact, was wrong in law or was unreasonable.
Where regulations bring additional registrar decisions within the review process under clause 60, the clause 61 regulations must set out the grounds for an appeal against those decisions. Regulations made under clause 61 may also set out how the registration regime will operate while an appeal is ongoing. The clause is needed to provide a fair and complete decision-making process. I commend clauses 60 and 61 to the Committee.
Clause 62 - Enforcing authorities
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clause 63 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 62 makes local housing authorities responsible for enforcing part 2 of the Bill. The registration duties need to be backed by effective enforcement, so that duty holders have a strong incentive to comply and action can be taken where they do not.
Local housing authorities are well placed to perform that role. They already have responsibilities and enforcement powers for housing conditions and safety in their areas, and hold important knowledge and intelligence about the local building stock.
The registrar is likely to be a different body from the local housing authority responsible for enforcement. Therefore, the two bodies need to share information, so that the registrar and the enforcement regime work together effectively. That is why clause 62 requires enforcing authorities to keep the registrar informed of any action they take or are considering taking under part 2 in relation to a building. Clause 62 also allows the Secretary of State to add or remove enforcement authorities through regulations.
Clause 63 allows the Secretary of State to issue statutory directions to part 2 enforcing authorities. The register operates nationally, but enforcement will be carried out locally. Local capacity, delivery models and experience may vary. This power will help to support a consistent and effective approach across the country.
Darren Paffey (Labour, Southampton Itchen)
My hon. Friend the Minister has a background in local government, as I do. She mentioned local capacity. Can she elaborate on what support or capacity she envisages being required within local authorities under this duty?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank my hon. Friend for that important intervention. I know that many of us are regularly contacted by our local councils, even if they are run by political parties that are different from our own, which highlights the very real financial challenges that many of them face on the ground as demand continues to grow right across the country. We recognise that some of these new duties will place additional demands on local housing authorities and we are assessing any additional costs arising from the Bill through the Government’s new burdens process. That will include costs associated with enforcing the medium-rise and building registration requirements. I hope that that answer satisfies my hon. Friend and other Members interested in this issue.
Local capacity delivery models and experience may vary, but this power will help to support a consistent and effective approach across the country. A direction may apply to all enforcing authorities, a group of authorities or individual authorities. It may require an authority to adapt plans or procedures, collect information, carry out reviews, appoint people to specific roles or co-operate with people appointed by the Secretary of State.
The power may be used to communicate a new strategic direction or address operational enforcement issues efficiently. To protect local operational independence, a direction cannot relate to action at a particular building. This prevents case-specific interventions in individual enforcement matters, while still allowing directions to cover general matters.
Lewis Cocking (Conservative, Broxbourne)
The Minister is making an eloquent speech about enforcement authorities. She said that local housing authorities, mainly councils, will be an enforcement partner under this legislation. Could she outline some of the impact that local government reorganisation might have in certain areas? Hopefully, she can give us some reassurance that those areas that go through local government reorganisation will not fall through the cracks when it comes to their new responsibilities under the Bill.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank the hon. Gentleman for that important point. I know that many Members are quite worried about local government reorganisation and they have raised valid concerns about it. As he will be aware, the Under-Secretary of State for Housing, Communities and Local Government, my hon. Friend the Member for Oldham West, Chadderton and Royton (Jim McMahon), has said that as this process develops, he will continue to engage with local authorities to ensure that any concerns that they raise are picked up, including any new specific burdens that arise from the Bill. We continue to discuss these matters not just with local authorities, but with the Local Government Association, which speaks with one voice on behalf of all local authorities.
To protect local operational independence, a direction cannot relate to an action at a particular building, which prevents case-specific interventions in individual enforcement matters, while still allowing directions to cover general matters.
Before issuing a direction to an individual authority or a subset of authorities, the Secretary of State must first give the authority or authorities an opportunity to make representations. That will help to ensure that the direction is proportionate and takes account of their views. However, once a direction is given, the authority must comply with it. That will support the smooth and consistent delivery of the register. I commend clauses 62 and 63 to the Committee.
Clause 64 - Passing costs of compliance to leaseholders
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to consider clause 65 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Part 2 of the Bill requires occupied medium-rise buildings to be registered. It also requires key building information to be provided and kept up to date. Meeting the duties will involve some small costs, including the registration fee and any other fees or charges levied by the registrar and may also include management costs and legal or other professional fees.
Clause 64 allows those costs to be recovered through the service charge. That applies even where the lease does not expressly allow it. The clause applies to leases of seven years or more where the tenant pays a service charge. It does not apply to social housing tenancies. Only costs linked to registration and the required information can be recovered. The clause does not allow wider remediation costs to be passed to leaseholders.
We expect the cost to each leaseholder to be low. Our impact assessment estimates an average of £28 per resident for initial registration, although the actual amount will depend on the building. While there may be some costs after registration, for example when updating register information, we expect them to be minimal and infrequent.
We are aware that, for some leaseholders in higher-risk buildings, complying with the Building Safety Act 2022 information requirements, such as preparing and applying for a building assessment certificate, has led to them receiving high service charge bills. We therefore want to emphasise that registering a medium-rise building will be a much less demanding process. Medium-rise buildings will not need a safety case report or the other documents required for the building assessment certificate application. We understand that it is these documents that have led to high costs in certain cases.
None the less, we are not complacent about the risk highlighted to us by leaseholders and their representative groups that registration could create a consultants’ charter, with unscrupulous professionals seeking to profit. To mitigate that risk, we will work with leaseholder groups and industry bodies to keep information requirements proportionate. Alongside the Government’s reforms to increase service charge transparency, this should also make it easier to identify and challenge unreasonable charges. The clause supports an effective register, while keeping costs transparent and proportionate.
Clause 65 defines the key terms used in part 2. The definitions are important to provide clarity when the duties in part 2 apply. That includes when a medium-rise building must be registered and when information must be required.
Darren Paffey (Labour, Southampton Itchen)
Some of my leaseholders have reached breaking point under service charges. One constituent had a £1,500 service charge bill when they moved into Oceana; that went up to £6,000. In the Blake building, one paid nearly £8,000 in service charges last year. I am sure this kind of story could be replicated across the country. Can the Minister offer a reassurance that the registration costs passed on under clause 64 will stay minimal and never include costs that are caused by a landlord’s non-compliance?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
It is really important to recognise that, as we come up to the festive period, many leaseholders will be looking at those bills. In the first few months of 2027, they will probably receive a demand for new service charges, which in many cases may go up again. My hon. Friend will be aware that the Minister for Planning introduced the Commonhold and Leasehold Reform Bill today, which outlines additional areas where the Government are seeking to ensure that service charges are more transparent.
In response to the point my hon. Friend just made, clause 64 allows the costs linked to registering medium-rise buildings to be recovered. However, registration duty holders will have to apply for this, and they will be required to ensure that only costs connected with the registration and information duties under clauses 52, 55 and 56 may be recovered. It is important that any wider remediation costs are not passed on to leaseholders. We want to make that very clear, and we want to make sure that duty holders are also very clear about that.
James Asser (Labour, West Ham and Beckton)
Like my hon. Friend the Member for Southampton Itchen, I am dealing with huge numbers of leaseholders who are facing all sorts of costs, which are often tacked on. The Minister has rightly talked about the need for transparency, particularly where we might get other agencies doing the registrations. What we have found with lots of our leaseholders is that the companies buying in often look like they are sub-contractors, but they are actually companies owned by the managing agent under different names. Can the Minister reassure leaseholders that the work she is putting in on transparency will ensure that anything like that shows up, so that extra costs are not being funnelled in by the back door in a rather obscure way?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I share my hon. Friend’s concerns, and he raises a valid point. In some cases, leaseholders are having to resort to becoming detectives, and they are having to go through their service charge costs line by line. In many cases, where leaseholders have rightfully challenged, they have been able to recoup costs. I have heard many such examples, including one where leaseholders were being charged for tree-cutting, even though there were no trees in the development. I am not sure how leaseholders were subject to or liable for that cost.
As I said in response to my hon. Friend the Member for Southampton Itchen, it is important that we are pushing leaseholders, freeholders and managing agents. The Commonhold and Leasehold Reform Bill will also include the option for some leaseholders to move to a right-to-manage option. If they find that their current managing agent is not transparent or working on their behalf, residents have that option to manage their buildings on their own.
The clauses support an effective register, while keeping costs transparent and proportionate. Clause 65 defines the key terms used in part 2 of the Bill, which is important to provide clarity on when the duties in part 2 apply. This includes when a medium-rise building must be registered, and when information must be provided. Clear definitions give the duty holders and enforcement authorities certainty. They also support consistent compliance and enforcement. I therefore commend clauses 64 and 65 to the Committee.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
Regretfully, I rise to speak against clause 64. It does not take a genius to work that a clause entitled “Passing costs of compliance to leaseholders” will not be popular with the Liberal Democrats, given everything that we have said about not passing a penny of these costs on to them. How on earth can leaseholders be responsible for the failure to build buildings that are not flammable?
According to paragraphs (a) to (c) of proposed new section 30IZA(4) of the Landlord and Tenant Act 1985, the costs being passed on will include legal and other professional fees, management costs and fees payable to the registrar. In other words, we are creating extra costs to the Government, and we are then inserting a section into the Landlord and Tenant Act 1985 to make leaseholders pay the costs that we have created in this Parliament. That fundamentally cannot be supported.
The Liberal Democrats will therefore oppose clause 64. As I say, it allows the costs of the new medium-rise buildings register to be passed on to leaseholders. Registering a building is the owner’s obligation, not the leaseholders’, so the costs of complying with it should fall on the owner and not leaseholders. Leaseholders have already faced years of service charge increases, as has just been debated. We should not be adding to those bills; we should be reducing them.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
The hon. Gentleman will be aware that it is normal for service charges to meet reasonable administrative and management costs associated with running a building. The costs of registering a building and complying with associated information requirements are part of the administrative nature of this Bill. I fully appreciate the concerns he has outlined; hence, we will continue to work with leaseholders and their representatives to ensure that those costs remain reasonable and that, where leaseholders face any unreasonable costs, they are able to challenge them. Most importantly, we want to ensure that any cost for wider remediation work is not passed on to leaseholders.
Gareth Bacon (Conservative, Orpington)
I have a clarificatory question for the Minister, who is being generous with her time. When she says that leaseholders will have the ability to challenge unreasonable costs, to whom and in what way will they challenge them? I read the announcement last week from her right hon. Friend the Housing and Planning Minister about providing transparency around service costs, which is a good starting point, but I would like to know where remediation would come into that. Leaseholders might have the ability to see how the service cost is broken down, but how would they challenge it, and who would they challenge it to?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
The hon. Gentleman will be aware that, under section 19 of the Landlord and Tenant Act, only relevant costs may be taken into account. Leaseholders already have the right to service charge information under the Leasehold and Freehold Reform Act 2024 and to challenge it. From 1 April 2027, the Act’s provisions on litigation costs will reduce the risk to leaseholders. In relation to medium-rise registration costs, which may be passed on to leaseholders, we are working with professional bodies and representatives such as the Royal Institution of Chartered Surveyors and the Property Institute to look at a benchmarking system for the costs and to identify any areas for leaseholders to challenge, should they wish to do so.
Gareth Bacon (Conservative, Orpington)
I thank the Minister for her answer. I do not think it quite clarifies the question I asked, but I suspect we will talk more about it in the forthcoming Commonhold and Leasehold Reform Bill.
Clause 66 - Buildings and authorities to which this Part applies
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Clause 67 stand part.
Amendment 49, in clause 68, page 38, line 12, leave out “useful” and insert “necessary”.
Amendment 50, in clause 68, page 38, line 21, leave out “useful” and insert “necessary”.
This amendment with Amendment 49 would restrict the relevant authority to only being able to obtain information about building ownership to when it is necessary, rather than just useful.
Clauses 68 to 72 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 66 defines the scope of part 3 of the Bill, which addresses beneficial ownership information. It identifies both the buildings in which the powers can be used and the public authorities that can use them. The powers can be used in relation to self-contained buildings, or self-contained parts of buildings, with at least two dwellings. As ownership can be unclear in residential blocks of any size, there is no height threshold.
The clause identifies the authorities that can use those powers. In England, those are local housing authorities, fire and rescue authorities, the Building Safety Regulator and Homes England. The clause allows the Secretary of State to add or remove public authorities through regulations. That keeps the list up to date if bodies or their responsibilities change. In Wales, Welsh Ministers will specify the devolved Welsh authorities through regulations.
Clause 67 gives relevant authorities a clear and targeted power to require information about who owns and controls residential blocks. Ownership structures can be complex. A building may be held through companies, partnerships, trusts or overseas entities. That can obscure who ultimately owns or controls it. The clause addresses that information gap.
A relevant authority may issue a building ownership information notice when it has reasonable grounds to believe that a person holds or can access the information needed. The notice must specify what information is required, how it must be provided and the deadline for doing so. It must also explain the consequences of non-compliance and tell the recipients how they may make representations if they believe they cannot comply. The clause does not permit speculative requests. The reasonable grounds test requires the authority to have an objective basis for believing that the recipient has or can access the information.
Clause 68 defines the information that a relevant authority may seek through a building ownership notice. The definition includes information that may help an authority to identify the legal owner and beneficial owners and understand the relationship that those people or entities have with the whole or part of the residential block.
Clause 69 supports clause 68 by defining when a partnership or body corporate is associated with another person. It covers links through trusts, partners and directors. It also covers bodies corporate that share a director or are linked through ownership or control. The clause looks at both direct and indirect control. Rights held through nominees or controlled companies count too. That helps authorities to trace connections through complex ownership structures. The definition also covers equivalent overseas partnerships, because where a partnership was formed should not prevent authorities from understanding those links. The clause does not make any associated persons automatically liable for building safety failures. Any liability must arise under the relevant building safety legislation.
Clause 70 gives the building ownership information regime effective and proportionate enforcement. It creates two offences. First, a person commits an offence if they fail to comply with a notice. On summary conviction, that offence may result in a fine. Secondly, a person commits an offence if they knowingly or recklessly provide information that is false or misleading. On conviction in a magistrates court, that offence may result in imprisonment up to the maximum term for the summary offence, a fine or both. The offences are proportionate. The false information offence does not criminalise an honest mistake. It requires knowledge or recklessness, and the information must be false or misleading in a material respect.
There is also an important safeguard for a person who fails to comply with a notice. They have a defence if they can prove that they had a “reasonable excuse”. Whether an excuse is reasonable will depend on the facts, including the steps taken to obtain and provide the information. The offences will help to ensure that the relevant authorities can rely on the information they receive, identify the right parties, and take timely and proportionate building safety action.
Clause 71 allows relevant authorities to impose a financial penalty for clause 70 offences. That is similar to elsewhere in the Bill, and can be an alternative to criminal prosecution. A financial penalty can be imposed for failing to comply with a building ownership information notice or for knowingly or recklessly providing information that is materially false or misleading. The maximum penalty for both is £40,000. Authorities will determine the appropriate penalty in each individual case.
Clause 71 also includes important safeguards. The authority must be satisfied beyond reasonable doubt that an offence has been committed. A person cannot be penalised for failing to comply if they show that, on the balance of probabilities, they had a reasonable excuse. The recipient must have opportunity to make written representations and can appeal to a tribunal. A person cannot be convicted and given a financial penalty for the same conduct.
Clause 72 ensures that building ownership information can be used and shared effectively, so that authorities can act more quickly to make buildings safe and drive forward remediation. More than one authority may need the same information. Each should not have to issue a separate notice to obtain it; that would duplicate work, cause delay and increase costs. The clause therefore allows relevant authorities to share information obtained through a building ownership information notice under clause 67. This is not a general power to share or use ownership information. Clause 72 only allows information to be shared with relevant enforcement and remediation functions.
In Wales, Welsh Ministers may specify the relevant devolved building safety functions in regulations. Clause 72 will help authorities to work together and avoid asking for the same information twice. It will support building safety and remediation while keeping clear limits on how information is used. I commend clauses 66 to 72 to the Committee.
Gareth Bacon (Conservative, Orpington)
We will not oppose this group of clauses, but I wish to speak to amendments 49 and 50, which were tabled in my name. Clause 68 as drafted gives relevant authorities the broad and intrusive power to compel the disclosure of information about building ownership from private companies whenever the authorities regard that information as “useful”. “Useful” is an almost boundless term for a curious regulator.
Such powers of compulsion should be well defined, and not so limitless as to leave companies subject to investigation with the potential to move well beyond the necessary bounds of a case. That is why amendments 49 and 50 would replace “useful” with “necessary”, because this is about proportionality. Data protection law exists not only to protect information reasonably, but to access it reasonably. Amendments 49 and 50 would enshrine that principle in the Bill without inhibiting the work of the regulator. The amendments encourage good and targeted regulation, not sweeping intrusion.
Rachel Blake (Labour/Co-operative, Cities of London and Westminster)
I will speak in favour of clauses 66 to 72, but I will focus my remarks on clauses 67 to 69, drawing on examples from my own constituency and experience. I will also put forward some questions about the clauses’ implications for the Crown dependencies and overseas territories, which are currently not providing publicly accessible registers of ownership.
Within my constituency, residents of Barrington Court face particularly high insurance premiums because a neighbouring building has not yet been remediated. Our shared understanding with local residents is that the reasons behind that are connected to the nature of the ownership of the building and the nature of the ownership of the company that owns the neighbouring building.
I believe that clause 67 will support the understanding of why the ownership of the building causes the higher insurance premiums. I want an assurance that, in respect of a building belonging to a foreign owned company, the measures in clause 67, and again in clause 42 around responsible entities, will provide some hope for my constituents that the neighbouring building will be remediated.
I believe that clause 69, which delves into the “Meaning of ‘associated with’”, will actually provide some of that hope because a responsible authority would be able to pursue the ownership information based on clause 67 and then link that ownership information to the responsible entity under clause 42.
On a broader point that will affect many constituencies, I flag my ongoing concerns about many places and buildings in the country where ownership of buildings rests in trusts that are based in Crown dependencies or overseas territories that have not come forward with public ownership registers. That has been an expectation of the UK Government for many years now. I know how seriously the Government take the issue of public registers. I am really pleased to see the measures in clauses 67 to 69, which will get us closer to understanding the ownership of some buildings. However, I am still concerned that we will get to a point where the trail stops at the register. We need to remain mindful of the urgency of securing those public registers.
Finally, I reflect on my concern for orphaned buildings, which I know the Minister will share. Those are buildings whose ownership has dispersed because the companies that previously owned the buildings are simply uncontactable or no longer entities in and of themselves. I appreciate that I am taking us quite deep into the nature of property ownership in this country, and I am grateful for the time that we can spend on that.
It is really important that we pursue the issue of orphaned buildings for the sake of the owners and tenants in them and so that the Bill, which is providing so much hope to people affected by unsafe cladding, helps as many people as it possibly can.
Gideon Amos (Liberal Democrat, Taunton and Wellington)
I will speak briefly on amendments 49 and 50, which we cannot support. They are about the amount of information that can be obtained, restricting it to only what is necessary, rather than what is useful. I listened carefully to the shadow Minister’s points, but we are not talking about personal information; we are talking about building information. As a liberal, I am here to stand up for the individual at the bottom of this heap: the leaseholders—those affected by the cladding scandal. We should surely make the maximum amount of information available to them and to the regime to get the issue resolved and to support them.
I support freedom of information generally for the same reasons, so we cannot support amendments 49 and 50, which would restrict the amount of information available. The whole point of part 3 is to cut through the complex ownership structures. The LGA told the Committee that bad actors deliberately obscure ownership to make enforcement harder. When ownership and information is hidden, authorities cannot know in advance the information that will be necessary. Those responsible for unsafe buildings must not be able to hide from accountability. These Conservative amendments would make it easier for them to do so.
Darren Paffey (Labour, Southampton Itchen)
It is a pleasure to serve under your chairship, Dr Huq. I very much welcome the provisions in part 3 of the Bill. These give public authorities the power to require information about who owns and controls a residential block. Again, to some it may sound like quite a dry administrative power, but in my constituency it would make a real difference.
As the Committee will now well know, I have far too many affected buildings. One of those is Admirals Quay in Southampton, where residents have spent years trying to find out who is responsible for their building. What they have found is, like in other cases, a maze: a head lease, a freeholder and intermediate asset management companies—each pointing to the other. There is a never-ending passing of the blame. The council faces the same wall. It is not possible to enforce against someone who cannot be identified. That is a simple fact. It is certainly not possible to serve a notice—as the Bill provides for—if there is not a name.
I very much commend what the measures in clauses 67 to 69 seek to address. They seek to clarify the ownership and provide that an authority will be able to require anyone it reasonably believes holds the information to provide that information, whether that concerns corporate owners, beneficial owners, trusts or associated persons. Failing to comply or giving false information will be an offence—as the Minister has outlined—with penalties of up to £40,000. That is good news, because, for the first time, hiding ownership will carry a cost. I very much welcome that.
I also query the amendments before us. While I accept that language always has its restrictions and vagaries, I question whether changing “useful” to “necessary” even deals with some of those. When an authority sends a notice asking who owns a building, how can it know in advance which pieces of information will turn out to be necessary? The whole point of asking is that the authority does not yet have clear what the ownership structure looks like.
I would raise an equal concern that a “necessary” test would require it to justify each line of a request before it has seen the answer. Is that not a gift to the very owners who want to stay hidden and who could refuse on the grounds that a particular item was, in their view, not strictly necessary? I support the choice of “useful”. It is the right test for an investigative power, and it is not a blank cheque. On the face of the Bill we have the assurance that information must relate to identifying the owners, beneficial owners and associated persons of a residential block, and the authority must have reasonable grounds to believe that the person holds it. Those are the proper safeguards.
Finally, I have two questions for the Minister. Many ownership chains run not just around this country, but also offshore. Could the Minister confirm that a notice can be given to anyone who holds the information, including the UK agents of overseas owners, and that authorities will be able to follow it using Companies House and the register of overseas entities, so that, again, distance does not become a wall behind which owners can hide?
When an authority does find out who is responsible, will it then be able to share that, within data protection law, with the leaseholders who have been trying to find that out for years? They deserve that transparency. This Bill takes huge strides towards ensuring that there is transparency. I would appreciate assurance that this will be another item of transparency for the residents at Admirals Quay who should not have needed a forensic accountant or detective to find out who owns their homes. Part 3 of this Bill, if done well, will mean that they will no longer have to. I welcome its inclusion in the Bill.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I will first address amendments 49 and 50, tabled by the hon. Member for Orpington, along with the comments from the hon. Member for Taunton and Wellington. Amendments 49 and 50 would change the definition of building ownership information from information that appears “useful” to information that appears “necessary”. I understand the intention is to ensure that these powers are used anywhere it is proportionate to do so, but the Bill already has enforcement safeguards in place to ensure that. Authorities must have good reason to believe that a person has or can access the information. They must explain exactly what they need and it must relate to the ownership provisions set out in clause 68.
Recipients can make representations if they cannot comply, and a reasonable excuse can provide protection against criminal liability for non-compliance. Information obtained may also be used or shared for specific building functions. These safeguards keep the powers targeted, while allowing authorities to unravel complex ownership arrangements. I therefore ask the shadow Minister not to press the amendments.
I share the many concerns raised by my hon. Friend the Member for Cities of London and Westminster, including those about residents in Barrington Court, where residents essentially have to go through different sources just to find the complex web of ownership, as well as the concerns she outlined on insurance. She may be aware that we are looking at the cost of fire safety insurance faced by leaseholders. We are also looking at how we can improve transparency around that and improve charges by tackling any unfair commissions.
The industry-led Fire Safety Reinsurance Facility increased capacity earlier this year. The MHCLG has also published the remediation programme insurance survey, providing the most comprehensive evidence to date on insurance costs for building remediations. Building on that, my hon. Friend may also be aware that the Financial Conduct Authority is carrying out a review of multi-occupancy buildings on the insurance market, which will help us to understand where further intervention may be identified.
My hon. Friend outlined the issues with regard to existing sources, as well as different ownerships and complex ownerships. She will be aware that different sources hold different information. The Land Registry identifies the registered legal owner, while Companies House and other sources may contain information about companies or overseas entities. These sources are not always integrated, and may not show the full chain of the beneficial ownership, or how an associated person may relate to the building, as in the concerns raised by my hon. Friend the Member for Southampton Itchen.
This information is vital. Regulators need specialist or legal expertise just to identify who owns the building. That is why it is so difficult for leaseholders trying to get key information to go through that web. Clause 67, as both my hon. Friends outlined, will allow an authority to seek this information directly from a person who holds it or can access it. The power complements existing registrars, but does not replace them.
To respond to my hon. Friend the Member for Southampton Itchen regarding who can be required to provide the information, a notice may be given to a person where the authority has reasonable grounds to believe that person has access to the building ownership information. On my hon. Friend’s further comments on overseas ownership, I will look into them in more detail and write to him with more information.
Gareth Bacon (Conservative, Orpington)
I listened carefully to the comments from the Minister and, in particular, the hon. Member for Southampton Itchen, and I will not press amendments 49 and 50.
Clause 73 - Key concepts determining the application of this Part
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clause 73 establishes the scope of part 4, making it clear which authorities, functions and buildings are covered by the co-operation agreements. That matters because responsibility for fire safety in residential buildings is shared across several statutory regimes. Local housing authorities, fire and rescue authorities and the Building Safety Regulator each have important but different roles to regulate fire safety. In some cases, more than one authority may be able to act in relation to the same building or defect.
Co-operation between regulatory bodies is therefore essential. That is why we are legislating for a clear and joined-up enforcement system that strengthens co-operation, enables regulators to act swiftly, and closes gaps in partnership working. The effect of clause 73 is to bring relevant fire safety functions within one clear co-operation framework. It covers existing functions under housing, fire safety and building safety legislation, as well as functions created by parts 1 to 3 of the Bill. Some of the functions listed in the clause cover matters beyond fire safety. Part 4 applies to those functions only in so far as they relate to risks from fire. I commend clause 73 to the Committee.
Clause 74 - Duty to cooperate
Gareth Bacon (Conservative, Orpington)
I beg to move amendment 57, in clause 74, page 42, line 36, at end insert—
“(3A) Where co-ordination in exercising the relevant functions between relevant authorities is unable to progress beyond 3 months, the Building Safety Regulator will make the final decisions on a relevant building.”
This amendment ensures that disagreements between Local Authorities, Local Fire Authorities and the Building Safety Regulator regarding areas of co-operation can be resolved by giving the Building Safety Regulator the ability to decide the final relevant action within a specified timeframe.
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss the following:
Clause stand part.
Clauses 75 to 79 stand part.
Gareth Bacon (Conservative, Orpington)
The amendment serves a clear, common-sense purpose: to provide clarity to an important element of what we believe to be an important Bill. The amendment would ensure that impasses do not turn into long-term blockages and would keep the process of remediation moving quickly by ensuring that where co-ordination between relevant authorities in exercising their functions is unable to progress, the Building Safety Regulator would make the final decision on a relevant building.
As we heard in last week’s oral evidence sessions, at present three regulators—local authorities, local fire authorities and the Building Safety Regulator—all work to serve similar but potentially overlapping purposes. The Bill is correct to legislate for co-operation and co-ordination, but where that fails we must break delays before they break the system. Delays are harmful and serve to disrupt other projects up and down the same pipeline. That is why one body must hold the power of the final say.
The Building Safety Regulator is the obvious choice. It is the national lead body on building safety and has an available body of experts at its disposal. The amendment is not designed to disrupt co-operation but to encourage it and, most critically, to ensure that it always reaches a timely result.
Darren Paffey (Labour, Southampton Itchen)
I support the clauses in this group, because they tackle an issue that every Member with such buildings in their constituencies has encountered: residents simply do not know who is in charge. In Southampton, three bodies have a legitimate role in fire safety in residential building: Southampton city council, Hampshire and Isle of Wight fire and rescue service and, for the tallest buildings, the Building Safety Regulator. Each has different powers under different regulations, and each has its own priorities and pressures.
At Royal Crescent, the council is balancing enforcement for leaseholders against its new duties to private renters, and the fire and rescue service tells me that its enforcement goes well beyond cladding to include fundamental failures of compartmentation and basic building standards. Residents get caught in the middle, because they are passed from one body to another.
I have a couple of questions for the Minister. First, I understand that the regulatory co-operation statement may take up to eight months, and the partnership agreements can take a further four, so it could be a year before the arrangements are in place. What assurance can the Minister give that authorities will continue to co-operate in the meantime? Will those partnership agreements be published so that residents can see which body leads on their building?
Ultimately, my constituents, like those of all Committee members, do not care which logo is on the enforcement notice. What they care about is that someone is in charge and something happens. These clauses make that far more likely, and so I support them. I look forward to the Minister’s reassurances.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I will address the clauses first. MHCLG is aware that many regulators are working well together through voluntary partnership working agreements or under local remediation acceleration plans. However, evidence shows an inconsistent adoption of co-operation principles. An October 2025 survey by the Department found that 37% of respondents do not have an up-to-date partnership working agreement in place. Therefore, more can and should be done to ensure a consistent co-operation approach between regulators.
Clause 74 creates the central duty to co-operate. The existing fire safety regulatory system is overseen by several regulators with different expertise and, at times, overlapping powers. That can be a strength, but only if the regulators share information, agree who is best placed to lead and act, and co-ordinate their work. The clause therefore requires co-operation where regulators operate in the same area or where one holds information that is likely to help another.
The clause is clear about what co-operation includes as a minimum. Regulators must share information and professional opinions upon request. Where more than one regulator may act at the same building for substantially the same purpose, they must seek to agree who should do so. If more than one regulator acts, they must seek to co-ordinate that action. Without the clause, known weaknesses in co-ordination could continue, buildings could be missed, and responsible parties could face overlapping and potentially inconsistent action.
Clause 75 requires the Building Safety Regulator to publish a regulatory co-operation statement, which will provide a clear and consistent explanation of how the regulator intends to co-operate, share information and co-ordinate activity under part 4. It must explain how the regulator will co-operate with other relevant authorities, including how it will share information and determine which authority should lead the investigation and enforcement activity. It must also explain how the regulator will meet requests for information and the arrangements for resolving disputes.
The regulator must consult the relevant authorities that will work with the statement, including mayoral strategic authorities, before it is published. The statement must be published within eight months of commencement to ensure that the co-operation arrangements are established at an early stage. The duty to keep the statement under review ensures that it can respond to changes in legislation, structures and working practices. Without the clause, relevant authorities could lack a clear and consistent understanding of how the Building Safety Regulator intends to co-operate, share information and co-ordinate activity under part 4.
Rachel Blake (Labour/Co-operative, Cities of London and Westminster)
The Minister will remember that this point was powerfully made in the evidence sessions last week. At that point, I was keen to hear from the Building Safety Regulator how prepared it was for this part of the Bill. I believe that it would be a good idea for the regulator to start to do some draft work on the co-operation statement. I appreciate that the Minister is not in a position to direct the regulator from this Committee, but does she share my view that, to make the co-operation statement as powerful and effective as possible, and given the fact that there is a little bit of time to get ahead, it might be a good idea for the regulator to start thinking about drafting the statement at this point, ahead of the implementation of the Bill?
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
I thank my hon. Friend for that important observation. It is important that the criteria, as far as possible, identify the appropriate regulator for the building requiring action. She will be aware that we will try to ensure that local authorities, fire and rescue authorities and the Building Safety Regulator co-ordinate on that action. I know she is aware that we have tasked the Building Safety Regulator with bringing down the number of assessments, and it continues to work at pace using the comments that Lord Roe made to the Committee. I am sure this is something to which the regulator will be giving a lot of thought, as it develops in the Bill.
As I said, the duty to keep the statement under review ensures that it can respond to changes in legislation, structures and working practices. Without the clause, relevant authorities could lack a clear and consistent understanding of how the Building Safety Regulator intends to co-operate, share information and co-ordinate activity.
Clause 76 builds on clause 74 by requiring local regulators to formalise their co-operation agreements into partnership working arrangements. Each agreement must explain how the parties will work together, how they will engage with the Building Safety Regulator, how they will respond to information requests and how they will resolve any disputes.
Local authorities and fire rescue authorities will have four months to agree their local arrangements, once the Building Safety Regulator has completed its regulatory co-operation statement. This ensures that local arrangements are aligned with the national approach. Local regulators must make every reasonable effort to reach and maintain an agreement. Where an agreement is not in place by the deadline, the authority must explain why to the Secretary of State. Once agreements have been entered into or varied, they must be shared with the Secretary of State, the Building Safety Regulator and the relevant mayoral strategic authorities within 21 days.
Clause 77 sets out which authorities in different parts of England must enter into partnership working arrangements with each other. In mayoral strategic authority areas, there will be a single agreement covering all relevant local authorities and fire and rescue authorities for that area.
Outside of these local authority areas, local government and fire and rescue structures may vary. Therefore, clause 77 allows authorities in those areas to choose between two approaches: they may implement a single agreement covering the fire and rescue authority and all local authorities whose areas overlap geographically, or the fire and rescue authority may enter into separate agreements with each local authority whose area overlaps with its own. The Building Safety Regulator is not included in these area-based arrangements because it operates nationally.
Clause 78 allows regulators to request information from one another and from mayoral strategic authorities where it would assist their relevant functions or the duty to co-operate. It also allows the Secretary of State and mayoral strategic authorities to request information where it would help them to monitor or facilitate the discharge of those functions. The recipient must comply as soon as reasonably practicable. That standard requires a prompt response while recognising that the volume, sensitivity and accessibility of information will vary. The power is not unlimited; a request must be linked to the functions specified in the clause. Without this clause, important information could remain fragmented and authorities could be delayed in identifying risks or taking co-ordinated action.
Clause 79 allows the Secretary of State to issue statutory guidance on how authorities carry out their functions relating to the legal duty to remediate, the remediation backstop, the medium-rise building register, building ownership information and regulatory co-operation. The guidance will set clear expectations for how authorities should carry out their functions in practice, how the different parts of the framework work together, and how authorities should co-operate and share information. This clause is important because the statutory duties establish the core legal framework. Meanwhile, guidance can provide further clarity on its consistent implementation across a system involving several regulators.
I recognise that the hon. Member for Orpington raises an important point in amendment 57. Disagreements between authorities must be resolved in good time and must not delay appropriate enforcement action on unsafe buildings. However, it is not the Building Safety Regulator’s role to act as the ultimate arbiter between relevant authorities. Local authorities, fire and rescue authorities and the regulator exercise their own statutory functions and bring their own professional expertise. Making the Building Safety Regulator the final decision maker may draw it into disputes that go beyond its remit and place additional demands on its capacity.
As I am sure the hon. Member is aware, we want the Building Safety Regulator to work at pace. The Government agree with the need for timely resolution, but we consider that the proposals in this Bill are better designed to meet that challenge. I hope that, following my explanation of clauses 74 to 79, the hon. Member will withdraw his amendment.
Gareth Bacon (Conservative, Orpington)
Amendment 57 was a probing amendment; we very much wanted to hear what the Government had to say about this. The hon. Member for Southampton Itchen made a point to the effect that residents do not care about the logo of whichever regulator is regulating their building, and we agree. It is not really about picking favourites; it is more about emphasising the need for clarity in the event of disagreements between regulators.
I heard what the Minister said, and we understand the duty to co-operate, but sometimes organisations are just not going to agree. In the event that that happens, a protracted delay in sorting this out is not in anybody’s best interests. The amendment was designed to provide some clarity about what would happen in that event, in line with amendments we have discussed previously.
The Minister said she was sure that I would want the Building Safety Regulator to work at pace. She is completely right: I would like the Building Safety Regulator to work at pace; it would make a refreshing change. However, as I say, our aim was not to empire-build for the Building Safety Regulator; it was about needing to have an agreed point of dispute resolution. That could be the Building Safety Regulator, the Secretary of State or somebody else, but what we really think is missing from the Bill is clarity about what happens in the event that regulators disagree, because we think that everyone loses if that happens. Because it was a probing amendment, I am content to withdraw amendment 57, but this might be something that gets returned to as the Bill progresses through Parliament. I beg to ask leave to withdraw the amendment.
Clause 80 - Power to update for changes in the relevant authorities
Rupa Huq (Labour, Ealing Central and Acton)
With this it will be convenient to discuss clauses 81 and 82 stand part.
Florence Eshalomi (Labour/Co-operative, Vauxhall and Camberwell Green)
Clauses 80 to 82 are supporting provisions to ensure that part 4 of the Bill continues to function as intended. Clause 80 is an updating power to future-proof the legislation. It ensures that the co-operation framework can continue to work properly if responsibility for enforcing parts 1, 2 or 3 of the Bill were to change. Without the clause, a future change to the authorities responsible for relevant functions could leave part 4 referring to bodies that no longer exercise those functions.
Clause 81 provides a route for the co-operation provisions in part 4 to be repealed. That will take effect only if chapter 1 of part 1 is repealed. This is because it may no longer be proportionate to retain all the associated co-operation arrangements if chapter 1 is repealed. That repeal is not automatic. The power allows the Government to consider which, if any, of the specified provisions remain necessary in the light of the circumstances at the time.
Clause 82 provides the key definitions for part 4. It ensures that key terms used throughout the part have a consistent meaning. The clause is an interpretative provision and does not confer new powers. I therefore commend clauses 80 to 82 to the Committee.