Beta This is a new service and it is still being tested. Tell us about a problem.

Railways: Infrastructure

House of Lords, 15 July 2014.

Baroness Kramer (Liberal Democrat)

My Right Honourable friend, the Secretary of State for Transport (Patrick McLoughlin), has made the following Ministerial Statement:

Earlier this year, I commissioned Network Rail to undertake a study to identify options for providing a resilient rail route west of Exeter.

Network Rail has now provided me with this study which is available on Network Rail’s website at:www.networkrail.co.uk/WestofExeterRouteResilienceStudy.pdf

The study considers the options below;

Option 1 | Base Case

Option 2 | Strengthening the existing railway

Option 3 | Alternative Route A - the former London & South Western Railway route from Exeter to Plymouth via Okehampton

Option 4 | Alternative Route B - constructing a modern double track railway on the alignment of the former Teign Valley branch line from Exeter to Newton Abbot

Option 5 | Alternative Route C (C1 – C5) - five alternative direct routes would provide a new line between Exeter and Newton Abbot

Network Rail’s West of Exeter route resilience study reflects the Government’s commitment to delivering world class transport infrastructure in the South West. It will be treated as a material input for Network Rail’s long term planning process and will be incorporated in the Western Route Study, a draft of which will be published for consultation later in 2014.

It is imperative that this work leads to improvements to the resilience of the railways in the south west that ensure there is no repeat of the disruption we saw earlier this year.

I expect to make a further statement in the autumn regarding the West of Exeter Route Resilience study and our next steps.