Departmental Expenditure Limits

House of Commons, 23 November 2010, ATTORNEY-GENERAL.

Dominic Grieve (Conservative, Beaconsfield)

Subject to parliamentary approval of any necessary supplementary estimate, the Attorney-General's total DEL will be increased by £10,977,000 from £686,875,000 to £697,852,000. Within the total DEL change, the impact on resources and capital are set out in the following table:

| Change | New DEL | £'000

| Voted | Non-voted | Voted | Non-voted | Total

Resource DEL | 10,977 | - | 659,077 | 36,182 | 695,259

of which: | | | | |

Administration budget | - | - | 60,948 | - | 60,948

Capital DEL(1) | - | - | 11,840 | - | 11,840

Less Depreciation(2) | - | - | -9,247 | - | -9,247

Total DEL | 10,977 | - | 661,670 | 36,182 | 697,852

(1)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of resource DEL, is excluded from total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The Crown Prosecution Service's (CPS) element of the Attorney-General's total DEL will be increased by £8,185,000 from £633,242,000 to £641,427,000.

The change in Resource DEL arises from budgetary transfers totalling £8,185,000 from the Ministry of Justice consisting of

£4,300,000 to help fund the Compass Case Management System

£2,600,000 from Victim Surcharge collections

£785,000 to provide support for the Local Criminal Justice Boards

£500,000 to help fund the delivery of the Corporate Manslaughter Act 2007

The Serious Fraud Office's (SFO) element of the Attorney-General's total DEL will be increased by £2,792,000 from £38,754,000 to £41,546,000.

The change in Resource DEL arises from the take up of £2,792,000 in blockbuster funding relating to UN Oil for Food cases to enable the SFO to continue with the investigation and prosecution of outstanding cases in 2010-11.

Eric Pickles (Conservative, Brentwood and Ongar)

Subject to Parliamentary approval of any necessary supplementary estimate, the Department for Communities and Local Government's departmental expenditure limits for 2010-11 will change as follows:

Section 1: Main Programmes DEL

1. The Department for Communities and Local Government's Main DEL will be decreased by £83,471,000 from £9,937,138,000 to £9,853,667,000 and the administration budget will be increased by £290,000 from £261,722,000 to £262,012,000. Within the DEL change, the impact on resources and capital are as set out in the following table:

| | (£'000)

| Change | NEW DEL

| Voted | Non-voted | Voted | Non-voted | Total

Resource | -8,156 | -35,317 | 3,337,329 | 438,354 | 3,775,683

Of which | | | | |

Administration budget | 290 | | 260,334 | 1,678 | 262,012

Capital 1 | -12,005 | -58,024 | 1,305,153 | 4,816,782 | 6,121,935

Depreciation 2 | 0 | 30,031 | -38,488 | -5,463 | -43,951

Total | -20,161 | -63,310 | 4,603,994 | 5,249,673 | 9,853,667

(1) Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets (2) Depreciation, which forms part of resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting

2. The change in the resource element of the DEL arises from:

2.1 An internal transfer of £2,158,000 to Request for Resources 1 (main DEL) from Request for Resources 2 (Local Government DEL) made up from £1,625,000 to the strategic research budget (main DEL) and £533,000 to DCLG's communication budget (main DEL). Both of these changes are to enable more effective management of the budgets.

2.2 An increase in main DEL of £700,000 in respect of Infrastructure UK. This is a technical correction.

2.3 A surrender of £46,191,000 programme expenditure to HM Treasury made up of £16,160,000 internal savings and £30,031,000 to reflect technical changes under the clear line of sight project (CLOS) which were overlooked when CLOS was first set up.

2.4 A net transfer of £140,000 to other Government Departments, made up of:

Transfers in (Programme total £8,300,000, Administration total £290,000)

Amount (£) | Department | Reason

£1,980,000 | Culture Media and Sport | Contributions to the Migration Impact Fund

£4,340,000 | Home Office |

£1,980,000 | Health |

£290,000 | Cabinet Office | Transfer of work on Community Cohesion

Transfers out (Programme total £8,730,000)

£2,500,000 | Energy and Climate Change | Local Carbon Frameworks

£4,280,000 | Business Innovation and Skills | Migration Impact Fund

£100,000 | Cabinet Office | Cross Government funding of Information Assurance capabilities.

£1,850,000 | Foreign and Commonwealth Office | Papal visit

2.5 a net increase in receipts of £23,837,000. This is made up of increases in provision of:

£100,000 for the dividend payment from the Fire Service College;

£7,020,000 in respect of Firelink projects in Scotland and Wales;

£5,160,000 increase in dividend receipts for Ordnance Survey;

£1,883,000 for staff on loan to the Homes and Communities Agency and outward secondment (administration budget);

£21,833,000 administration for Government Office programmes (administration budget);

offset by decreases in provision of:

£159,000 decrease in dividends for Queen Elizabeth II Conference Centre

£12,000,000 to reflect reduced income from sub-tenants following departure from Ashdown House (administration budget).

2.6 a net transfer of £3,336,000 programme provision from non-voted to voted made up as follows:

from voted to non-voted provision

£2,316,000 was surrendered to the departmental unallocated provision (DUP) in respect of savings identified in the review of Pilots projects;

£2,100,000 of departmental receipts to the Homes and Communities Agency to fund additional pension costs. The additional funding is required to meet liabilities which had not been fully costed when the body was first set up;

£100,000 from fire and rescue services improvement programme (a dividend payment from the Fire Service College) is being transferred to DUP;

from non-voted to voted provision

£1,500,000 from the Homes and Communities Agency Growth due to withdrawal of funding in support of eco-towns.

£6,352,000 from DUP to help restore the European regional development fund (ERDF) liability budget to its original total. (The budget was reduced by £17.1 million at main estimates as a temporary measure while the budgets to deliver administrative savings which contributed to the £6.2 billion savings were identified.

2.7 The changes described at paragraphs 2.5 and 2.6 above have a net nil effect on the departmental expenditure limit:

2.8 The change in the administration budget arises from the transfer of £290,000 from the Cabinet Office-see above table at 2.4.

3. The change in the capital element of the DEL arises from:

3.1 a surrender of £70,029,000 programme expenditure to HM Treasury made up of:

£14,629,000 internal savings; and

£55,400,000 as the borrowing element in respect of local authority new build programmes.

3.2 an increase in receipts of £19,500,000 for capital pooled housing receipts offsetting increases in provision of £5,189,000 for the Olympics programme; £13,277,000 for Control Room, £950,000 for Thames Gateway and £84,000 for renewing neighbourhood programme.

3.3 a net transfer of £2,624,000 from non-voted to voted made up of:

from voted to non-voted provision

£2,340,000 to the community infrastructure fund to support the Dearne Valley transport project to be delivered by Barnsley metropolitan borough council;

£950,000 to Thames Gateway to enable the London Urban Development Council to meet pressures on the additional compulsory purchase order valuation.

from non-voted to voted provision

A surplus on local authority supported capital expenditure (LASCE) of £5,914,000 is being moved to private sector renewal to restore an earlier reduction in their 2010-11 allocation.

3.4 The changes described at paragraphs 3.2 and 3.3 above have a net nil effect on the departmental expenditure limit:

Section 2: Local Government DEL

4. The Department for Communities and Local Government's local government DEL will be decreased by £2,374,000 from £25,992,569,000 to £25,990,195,000. Within the DEL change, the impact on resources and capital are as set out in the following table:

| | (£'000)

| Change | NEW DEL

| Voted | Non-voted | Voted | Non-voted | Total

Resource | -2,158 | -182 | 25,863,046 | 115,353 | 25,978,399

Capital (1) | 0 | 182 | 12,470 | 582 | 13,052

Depreciation (2) | 0 | -216 | 0 | -1,256 | -1,256

Total | -2,158 | -216 | 25,875,516 | 114,679 | 25,990,195

(1) Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets (2) Depreciation, which forms part of resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

5. The change in the resource element of the DEL arises from:

the transfer of £2,158,000 from Request for Resources 2 (local government DEL) to Request for Resources 1 (main DEL) described at paragraph 2.1 above

a switch of £182,000 from resource to capital. Local Government Standards Board's capital allocation was taken out in the last budget reduction. It was necessary to transfer this fund from resource to capital to cover the spending to date.

6. The change in the capital element of the DEL arises from

the switch of £182,000 to Capital from Resource for Local Government Standards Board described above.

Jeremy Hunt (Conservative, South West Surrey)

Subject to parliamentary approval, the Department for Culture Media and Sport's departmental expenditure limit (DEL) will be increased by £39,700,000 from £1,957,263,000 to £1,996,963,000 and the administration budget will increase by £7,200,000 from £44,288,000 to £51,488,000. Within the DEL change the impact on resource and capital are set out in the following table:

| Change | New | DEL | £'000

| Voted | Non-voted | Voted | Non-voted | Total

Resource DEL | 4,396 | 5,244 | 90,863 | 1,460,220 | 1,551,083

Ofwhich: | | | | |

Administration budget | 7,200 | - | 51,488 | - | 51,488

Capital(1) | 11,901 | 18,159 | -643,406 | 1,217,392 | 573,986

Less Depreciation(2) | - | - | -7,500 | -120,606 | -128,106

Total | 16,297 | 23,403 | -560,043 | 2,557,006 | 1,996,963

(1)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of resource DEL, is excluded from total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The change in the Resource element of the DEL arises from:

Take up of £9,700,000 End Year flexibility comprising: (£4,000,000) UK Film; (£2,000,000) Museums and Galleries; and £3,700,000 Administration budget, and a transfer of £60,000 from Resource to Capital DEL for the Poetry Archive

The administration budget has increased by £7,200,000 from £44,288,000 to £51,488,000. This is as a result of take up of £3,700,000 Administration End Year Flexibility and an agreed transfer of £3,500,000 from programme to administration costs.

The Capital element of the DEL has increased by £30,060,000 as a result of:

The drawdown of £30,000,000 End Year Flexibility (EYF) to meet agreed spending plans and a transfer of £60,000 to Capital from Resource DEL for the Poetry Archive.

Michael Gove (Conservative, Surrey Heath)

Subject to parliamentary approval of any necessary supplementary estimate, the Department for Education (DfE) departmental expenditure limit (DEL) will be increased by £580,339,000 from £57,318,757,000 to £57,899,096,000; the administration cost budget will increase by £1,500,000 from £180,503,000 to £182,003,000. The Office for Standards in Education, Children's Services and Skills (OFSTED) which has a separate Estimate and DEL, will remain at £190,196,000 with the administration cost budget remaining at £27,337,000. The Office of Qualifications and Examination Regulation (OFQUAL) which has a separate Estimate and DEL, will remain at £23,400,000.

Within the DEL change, the impact on resources and capital are as set out in the following table:

DfE | Resources | Capital(2)

| Change | New DEL | Of which: | Change | New DEL | Of which:

| | | Voted | Non-voted | | | Voted | Non-voted

| £'000 | £'000 | £'000 | £'000 | £'000 | £'000 | £'000 | £'000

RfRI | 623,339 | 49,683,740 | 41,290,026 | 8,393,714 | -43,000 | 6,297,547 | 242,474 | 6,055,073

RfR2 | 0 | 1,602,784 | 1,602,784 | 0 | 0 | 315,025 | 315,025 | 0

DfE Total | 623,339 | 51,286,524 | 42,892,810 | 8,393,714 | -43,000 | 6,612,572 | 557,499 | 6,055,073

OFSTED | 0 | 190,196 | 185,852 | 4,344 | 0 | 0 | 0 | 0

OFQUAL | 0 | 17,900 | 17,300 | 600 | 0 | 5,500 | 5,500 | 0

Sub Total | 623,339 | 51,494,620 | 43,095,962 | 8,398,658 | -43,000 | 6,618,072 | 562,999 | 6,055,073

Of which Admin Budget | 1,500 | 209,340 | 204,872 | 4,468 | 0 | 0 | 0 | 0

Depreciation1(1) | -1,500 | -17,137 | -14,107 | -3,030 | 0 | 0 | 0 | 0

Total | 621,839 | 51,477,483 | 43,081,855 | 8,395,628 | -43,000 | 6,618,072 | 562,999 | 6,055,073

(1)Depreciation, which forms part of resource DEL, is excluded from the total DEL, in the table above, since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting. (2)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets.

Department for Education

Resource DEL

The increase in the resource element of the DEL of £623,339,000 arises from a decrease in the voted element of the resource DEL of £9,089,000 and an increase of £632,428,000 in the non-voted element of resource DEL, mainly in the Department's Non-Departmental Public Bodies.

Voted Resource DEL

The £9,089,000 decrease in the voted element of the resource DEL arises from:

RFR1

A transfer from the Department for Work and Pensions for £4,183,000 in respect of their agreed share of the costs associated with the Child Poverty Innovation fund.

A transfer from the Department for Business, Innovation and Skills of £20,000,000 in respect of Higher Discretionary Support for 19 to 24 year olds.

A Machinery of Government transfer to the Ministry of Justice of £43,811,000 in respect of the Joint Youth Justice Unit. This was a joint project between the Department for Education and the Ministry of Justice. Responsibility for this has been moved entirely to the Ministry of Justice.

A transfer to the Foreign and Commonwealth Office of £1,850,000 to cover the Departments' contribution to the educational objective of the jointly funded Papal Visit.

A transfer from Qualifications and Curriculum Development Agency (QCDA) to the Department for Business, Innovation and Skills of £1,990,000 in respect of National Vocational Qualifications income received by QCDA that fund UK Commission for Employment and Skills expenditure.

A transfer to the Department for Communities and Local Government of £1,980,000 for the Migration Impact Fund.

A transfer to the Scottish Government of £213,000 for Child Trust Funds top ups.

A switch of £33,000,000 from Capital Grants to Resource spending for Schools and Teachers to re-profile budgets affected as part of the Department's 2010 Emergency Budget savings of £670 million.

Take up of Departmental End Year Flexibility of £606,000,000 to increase provision for Sixth Forms delivered through the Young People's Learning Agency.

A movement of £626,928,000 to non-voted resource DEL to support the Department's Non-Departmental Public Bodies.

A movement of £4,500,000 from Non Voted spending to re-profile provision usage no longer required and relieve pressures on the depreciation budgets caused by the recent Clear Line of Sight adjustments.

Non-voted resource DEL

The £632,428,000 increase in Non-voted resource DEL arises from:

RFR1

A movement of £10,000,000 from non-voted Capital switched to resource to re-profile budgets affected as part of the Department's 2010 Emergency Budget savings of £670 million.

A movement of £626,928,000 from voted resource to support the Department's Non-Departmental Public Bodies.

A movement of £4,500,000 from non-voted resource DEL to support the Department's Administration expenditure.

Capital DEL

The decrease in the capital element of the DEL of £43,000,000 arises from a decrease in the non-voted element of capital DEL.

Non-voted Capital DEL

The £43,000,000 decrease in the non-voted element of capital DEL arises from:

A switch of £43,000,000 from non-voted capital into voted and non-voted resource

to re-profile budgets affected as part of the Department's 2010 Emergency Budget savings of £670 million.

Office for Standards in Education, Children's Services and Skills

There has been no change in overall DEL limits within the winter supplementary.

Office of Qualifications and Examination Regulation

There has been no change in overall DEL limits within the winter supplementary.

Christopher Huhne (Liberal Democrat, Eastleigh)

Subject to parliamentary approval of any necessary supplementary estimate, the Department of Energy and Climate Change departmental expenditure limit (DEL) will increase by £650,000 from £3,111,948,000 to £3,112,598,000.

Within the DEL change, the impact on resources and capital are as set out in the following table:

£'000 | Change | New DEL

| Voted | Non-Voted | Voted | Non-Voted | Total

Resource DEL | 943,776 | -924,801 | 407,198 | 810,364 | 1,217,562

Of which: | | | | |

Administration Budget | - | - | 108,084 | - | 108,084

Capital DEL(1) | 3,262 | -21,587 | 725,519 | 1,178,182 | 1,903,701

Less Depreciation(2) | - | - | -2,987 | -5,678 | -8,665

Total DEL | 947,038 | -946,388 | 1,129,730 | 1,982,868 | 3,112,598

(1)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of Resource DEL, is excluded from the total DEL in the table above, since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

Resource DEL

The increase in the Resource element of the DEL of £18,975,000 arises from an increase in the voted element of Resource DEL of £943,776,000 offset by a decrease of £924,801,000 in the non-voted element of Resource DEL.

Voted Resource DEL

The £943,776,000 increase in the voted element of Resource DEL arises from:

A decrease of £923,000,000 in Nuclear Decommissioning Authority operating appropriations-in-aid.

A transfer from non-voted Capital DEL of £18,325,000, reflecting the revision of the Capital/Resource split of the £85 million DECC contribution to the £6.2 billion savings announced on 24 May 2010.

A transfer from non-voted Resource DEL of £1,801,000.

A transfer from the Department for Communities and Local Government of £2,500,000 for Low-Carbon Framework pilot programmes.

A transfer to the Foreign and Commonwealth Office of £1,850,000 towards the costs of the Papal visit.

Non-voted Resource DEL

The £924,801,000 decrease in non-voted Resource DEL arises from:

A decrease of £923,000,000 in Nuclear Decommissioning Authority DEL reflecting the revised scoring of their income as non-voted in DEL terms, offsetting the reduction in appropriations-in-aid.

A transfer to voted Resource DEL of £1,801,000.

Capital DEL

The decrease in the Capital element of the DEL of £18,325,000 arises from an increase in the voted element of Capital DEL of £3,262,000 and a decrease of £21,587,000 in the non-voted element of Capital DEL.

Voted Capital DEL

The £3,262,000 increase in the voted element of Capital DEL arises from:

A transfer from non-voted Capital DEL of £3,262,000.

Non-voted Capital DEL

The £21,587,000 decrease in the non-voted element of Capital DEL arises from:

A transfer to voted Capital DEL of £3,262,000.

A transfer to voted Resource DEL of £18,325,000, reflecting the revision of the Capital/Resource split of the £85 million DECC contribution to the £6.2 billion savings announced on 24 May 2010.

Richard Benyon (Conservative, Newbury)

Subject to parliamentary approval of any necessary supplementary estimate, the Department for Environment, Food and Rural Affairs departmental expenditure limit (DEL) will be reduced by £218,000 (0.01%) from £2,417,291,000 to £2,417,073,000. The Administration Budget will be reduced by £662,000 (0.23%) from £282,750,000 to £282,088,000. Within the DEL change, the impact on resources and capital is set out in the following table:

£'000

| Change | New DEL

| Voted | Non-voted | Total | Voted | Non-voted | Total

Resource | 12,345 | -12,563 | -218 | 3,707,615 | -1,290,542 | 2,417,073

Of which: | | | | | |

Administration Budget | -662 | - | -662 | 282,088 | - | 282,088

Capital | -17,763 | 17,763 | - | 123,127 | 424,587 | 547,714

Depreciation(1) | 325 | -325 | - | -100,441 | -109,235 | -209,676

Total | -5,093 | 4,875 | -218 | 3,730,301 | -975,190 | 2,755,111

(1)Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The change in the resource element of the DEL of -£218,000 arises from:

(i) a transfer of £1,850,000 administration to the Foreign and Commonwealth Office for the Papal visit; (ii) a transfer of £1,188,000 administration and £544,000 programme to DEFRA from the Food Standards Agency for the Machinery of Government Change reflecting a permanent transfer of function to DEFRA covering elements of food labelling and food composition policy; and (iii) a transfer of £100,000 programme to the Scottish Executive to fund Marine Protected Areas.

There has also been a transfer within the resource element of the DEL of £12,563,000 from non-voted to voted: (i) £9,447,000 relating to budget transfers from the core Department (voted) to the Department's Non-Departmental Public Bodies (non-voted), mainly the Environment Agency, the Joint Nature and Conservation Committee and Natural England; and (ii) £22,010,000 relates to increases in income and expenditure for the Rural Development Programme for England. This change is DEL neutral, but the expenditure is classed as voted, whereas the income is classed as non-voted consolidated fund extra receipts.

There is no change in the depreciation budget. There has however been a transfer of £325,000 from voted to non-voted relating to a transfer of budget to the Marine Management Organisation.

There is no change in the capital element of the DEL. There has however been a transfer within the capital element of the DEL of £17,763,000 from voted to non-voted relating to budget transfers from the core Department (voted) to the Department's Non Departmental Public Bodies (non-voted), mainly the Environment Agency.

William Hague (Conservative, Richmond (Yorks))

Subject to parliamentary approval of any necessary supplementary estimate, the Foreign and Commonwealth Office departmental expenditure limit (DEL) will be increased by £95,878,000 from £2,127,148,000 to £2,223,026,000. The administration budget will be increased by £64,250,000 from £420,448,000 to £484,698,000. Within the DEL change, the impact on resources and capital are as set out in the following table:

| Change £'000 | New DEL £'000 |

| Voted | Non-voted | Voted | Non-voted | Total

Resource | 138,143 | -17,000 | 2,124,381 | 29,000 | 2,153,381

Of which: | | | | |

Administration budget | 81,250 | -17,000 | 468,068 | 16,630 | 484,698

Capital(1) | -25,265 | - | 168,695 | - | 168,695

Depreciation(2) | - | - | -99,050 | - | -99,050

Total | 112,878 | -17,,000 | 2,194,026 | 29,000 | 2,223,026

(1)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The change in the resource element of the DEL arises from:

Request for Resources 1

Administration

I. Take up of £15,000,000 Administration EYF in respect of modernisation of the core FCO.

II. A claim on the Reserve of £15,000,000 Administration costs in respect of Corporate Services modernisation.

III. Transfer of £1,850,000 administration from the Department for Education in respect of the Papal visit.

IV. Transfer of £1,850,000 administration from the Department for International Development in respect of the Papal visit.

V. Transfer of £1,850,000 administration from the Department of Energy and Climate Change in respect of the Papal visit.

VI. Transfer of £1,850,000 administration from the Department for Environment, Food and Rural Affairs in respect of the Papal visit.

VII. Transfer of £1,850,000 administration from the Department for Communities and Local Government in respect of the Papal visit.

VIII. Transfer of £180,000 administration from the Department for International Development in respect of the gratis visa operation in Chernobyl.

IX. Capital to Administration switch of £25,000,000 in respect of exchange rate pressures.

Programme

I. Transfer of £100,000 programme from the Department for International Development in respect of the Strategic and Bilateral fund work in the Democratic Republic of Congo.

II. Transfer of £40,000,000 programme from the Department for International Development in respect of support for British Council Official Development Assistance (ODA).

III. Transfer of £200,000 programme from the Department of International Development in respect of Tanzania Police Training Project.

Capital

I. Capital to administration switch of £25,000,000 in respect of exchange rate pressures.

II. Capital transfer of £265,000 from FCO to DFID as a contribution towards building a new office in Juba, Sudan.

Request for Resources 2

Programme

I. Transfer of £16,467,000 grants from DFID in respect of conflict prevention and discretionary Peacekeeping funds.

II. Transfer of £54,000 grants to the Security Intelligence Agencies for expansion and capability.

Simon Burns (Conservative, Chelmsford)

Subject to the necessary supplementary estimates, the Department of Health's element of the departmental expenditure limit (DEL) will increase by £20,860,000 from £106,260,372,000 to £106,281,232,000 the Administration Cost Limit has increased by £4,201,000 from £211,079,000 to £215,280,000. The Food Standards Agency DEL decreases by £16,059,000 from £130,989,000 to £114,930,000. The Administration Cost Limit will reduce by £5,389,000 from £56,299,000 to £50,910,000. The overall DEL including the Food Standards Agency will increase by £4,801,000 from £106,391,361,000 to £106,396,162,000. The impact on resource and capital are set out in the following table:

| Change | New DEL

| Voted£m | Non-voted£m | Voted£m | Non-voted£m | Total£m

Department of Health | | | | |

Resource DEL, of which | 467.860 | -447.000 | 101,141.041 | 243.339 | 101,384.380

Administration Budget | 4.201 | - | 210.280 | 5.000 | 215.280

Capital DEL(1) | - | 0 | 2,150.189 | 2,746.663 | 4,896.852

Total Department of Health DEL | 467.860 | -447.000 | 103,291.230 | 2,990.002 | 106,281.232

Depreciation(2) | - | - | -1,119.419 | 0 | -1,119.419

Total Department of Health spending (after adjustment) | 467.860 | -447.000 | 102,171.811 | 2,990.002 | 105,161.813

Food Standards Agency | | | | |

Resource DEL, of which | -16.059 | - | 114.329 | - | 114.329

Administration Budget | -5.389 | - | 50.910 | - | 50.910

Capital DEL(1) | - | - | 0.601 | - | 0.601

Total Food Standards Agency DEL | -16.059 | | 114.930 | - | 114.930

Depreciation(2) | - | - | -1.861 | - | -1.861

Total Food Standards Agency spending (after adjustment) | -16.059 | - | 113.069 | - | 113.069

(1)Capital DEL includes items treated as Resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of resource DEL, is excluded from the total DEL since the capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The Department of Health DEL has increased by £20,860,000 made up of:

an increase of £14,327,000 (£4,201,000 administration costs) as a result of a Machinery of Government change with nutrition policy moving from the Food Standards Agency;

a transfer of £10,513,000 from the Ministry of Justice mainly for prison healthcare services;

a transfer of -£2,000,000 to the Cabinet Office as the Department's share of a contribution to information assurance strategy; and

a transfer of -£1,980,000 to the Department of Communities and Local Government towards the migrant impact fund.

The Department of Health's administration cost limit has increased as a result of the Machinery of Government change detailed above.

The change of £16,059,000 to the Food Standards Agency element of the DEL is due to:

a reduction in DEL of £14,327,000 (£4,201,000 administration costs) for the transfer of nutrition responsibilities to the Department of Health. It was announced on the 20 July the Department of Health would become responsible for nutrition policy in England; and

a reduction in DEL of £1,732,000 (£1,188,000 administration costs) for the transfer of labelling responsibilities. It was announced on the 20 July that the Department for Environment, Food and Rural Affairs will become responsible for country of origin labelling and various other types of labelling not related to food safety, and food composition policies in England.

Andrew Mitchell (Conservative, Sutton Coldfield)

Subject to parliamentary approval of the necessary supplementary estimate, the Department for International Development's departmental expenditure limit (DEL) will be reduced by £74,465,000 from £7,618,569,000 to £7,544,104,000.

Within the DEL change, the impact on resources and capital are as set out in the following table:

| Change | New DEL | £'000

| Voted | Non-voted | Voted | Non-voted | Total

Resource DEL | 6,642 | -81,372 | 5,023,211 | 985,628 | 6,008,839

Of which: | | | | |

Administration budget | - | - | 154,644 | 3,000 | 157,644

Capital DEL (1) | 203,001 | -202,736 | 1,737,001 | -180,736 | 1,556,265

Less Depreciation (2) | - | - | -21,000 | - | -21,000

Total DEL | 209,643 | -284,108 | 6,739,212 | 804,892 | 7,544,104

(1) Capital DEL includes items treated as resource in Estimates and Accounts but which are treated as Capital DEL in budgets. (2) Depreciation, which forms part of the resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of these assets would lead to double counting.

The change in the Resource element of DEL arises from:

Non-voted

Transfers out to other Government Departments-£74,730,000:

-£40,000,000 transferred to the Foreign and Commonwealth Office in respect of support for British Council Official Development Assistance (ODA).

-£16,467,000 transferred to the Foreign and Commonwealth Office in respect of the conflict prevention pool.

-£16,033,000 transferred to the Ministry of Defence in respect of the conflict prevention pool.

-£1,850,000 transferred to the Foreign and Commonwealth Office in respect of the papal visit.

-£200,000 transferred to the Foreign and Commonwealth Office in respect of police training in Tanzania.

-£180,000 transferred to the Foreign and Commonwealth Office in respect of visas for Chernobyl victims.

Use of Departmental Unallocated Provision | -£6,642,000

Subtotal non voted | -£81,372,000

Voted |

Use of Departmental Unallocated Provision | £6,642,000

Subtotal voted | £6,642,000

Total reductions in RDEL | -£74,730,000

The change in the Capital element of DEL arises from:

Non-voted

Transfers in from other Government Departments£265,000

£265,000 transferred from Foreign and Commonwealth Office in respect of the new Juba office build.

Income from Global Trade Liquidity loan to be paid into the Consolidated Fund (CFER) since it exceeds voted capital expenditure -£200,000,000

Use of Departmental Unallocated Provision | -£3,001,000

Subtotal non-voted | -£202,736,000

Voted |

IDA replenishment on resource side of the Estimate | £200,000,000

Use of Departmental Unallocated Provision | £3,001,000

Subtotal voted | £203,001,000

Total increases in CDEL | £265,000

Owen Paterson (Conservative, North Shropshire)

Subject to parliamentary approval the Northern Ireland Office (NIO) will be taking a 2010-11 winter supplementary estimate. The effect this will have is to decrease the NIO's Total DEL (excluding depreciation) by £1,169,047,000 from £1,203,205,000 to £34,158,000.

| Change | New DEL

£'000 | Voted | Non-Voted | Voted | Non-voted | Total

Resource | (293,444) | (869,832) | 34,174 | 1,702 | 35,876

Admin Budget | (51,813) | | 16,751 | - | 16,751

Capital | (35,387) | (36,076) | 440 | - | 440

Depreciation | 24,797 | 40,895 | (2,100) | (58) | (2,158)

Total (excl. depreciation) | (304,034) | (865,013) | 32,514 | 1,644 | 34,158

The change in total DEL of £1,169,047,000 relates to the devolution of policing and justice to the Northern Ireland Executive on 12 April 2010.

NI Consolidated Fund-Request for Resources (RfR) 2

The Northern Ireland Executive DEL is increased by £1,310,609,000 from

£9,515,937,000 to £10,826,546,000. Within the total DEL change, the impact on resources and capital is set out in the following table:

| Change £000 | New DEL £000

Resource DEL | 1,307,846 | 9,931,705

Capital DEL | 80,263 | 1,222,906

Resource DEL + Capital DEL | 1,388,109 | 11,154,611

Less Depreciation | 77,500 | 328,065

Total DEL net of depreciation | 1,310,609 | 10,826,546

This increase takes account of the Machinery of Government change that devolved policing and justice from the Northern Ireland Office and the Northern Ireland Courts Service to the Northern Ireland Executive on 12 April 2010.

Iain Duncan Smith (Conservative, Chingford and Woodford Green)

Subject to parliamentary approval of the necessary supplementary estimate, the Department for Work and Pensions Resource departmental expenditure limit will decrease by £35,781,000 to £8,730,218,000 and the Capital departmental expenditure limit will remain unchanged at £243,052,000. The Administration budget will decrease by £31,185,000 to £6,076,705,000.

| Change(£'000) | New DEL (£'000)

| Voted | Non-voted | Total | Voted | Non-voted | Total

Resource | -58,183 | 22,402 | -35,781 | 5,599,225 | 3,130,993 | 8,730,218

of which: | | | | | |

Administration | -31,185 | 0 | -31,185 | 4,543,556 | 1,533,149 | 6,076,705

Capital | 18,496 | -18,496 | 0 | 191,224 | 51,828 | 243,052

Depreciation(1) | 919 | -1,018 | -99 | -254,880 | -834 | -255,714

Total DEL | -40,606 | 4,924 | -35,682 | 5,535,569 | 3,181,987 | 8,717,556

(1)Depreciation, which forms part of the resource Departmental Expenditure Limit, is excluded from the total Departmental Expenditure Limit since the capital Departmental Expenditure Limit includes capital spending and to include depreciation of those assets would lead to double counting.

Resource Departmental Expenditure Limit

The change in the resource element of the departmental expenditure limit arises from:

Movements in Voted Expenditure

Request for Resources 2

i. A budget transfer of £4,183,000 to the Department for Education to meet the Department's agreed share of the costs associated with the Child Poverty Innovation fund for 2010-11.

ii. A budget transfer of £413,000 to the Department for Business, Innovation and Skills for Regional Development Agency payments in relation to the School Gates project.

Request for Resources 3

iii. A budget transfer of £1,200,000 to the Paydays and Periodicity for Pension benefits. Small up-front cost of £ 1.2 million required to be transferred to Non-voted AME.

iv. A transfer from Request for Resources 5 of £1,000,000 to cover the costs of Information Assurance for 2010-11.

v. A budget transfer of £1,000,000 to the Cabinet Office for the Department's contribution to Information Assurance for 2010-11.

Request for Resources 5

vi. A Machinery of Government change of £28,985,000 to the Cabinet Office. This is to bring together and consolidate in the Cabinet Office all the various strands of work on transparency, open data, Government websites and digital engagement.

vii. A transfer to Request for Resources 3 of £1,000,000 to cover the costs of Information Assurance for 2010-11.

Movements in Non-Voted Expenditure

viii. A decrease in non-voted expenditure of £16,000 offset by an increase in voted expenditure of £16,000 relating to decreased spend of the Independent Living Fund.

ix. A decrease in non-voted expenditure of £14,495,000 offset by an increase in voted expenditure of £14,495,000 relating to decreased spend of the Pensions Regulator.

x. A decrease in non-voted expenditure of £226,000 offset by an increase in voted expenditure of £226,000 relating to decreased spend of the Pensions Advisory Service.

xi. A decrease in non-voted expenditure of £75,000 offset by an increase in voted expenditure of £75,000 relating to decreased spend of the Office of the Pensions Ombudsman.

xii. An increase in non-voted expenditure of £37,214,000 offset by an increase in voted income of £37,214,000 relating to the increase of income for administering National Insurance Benefits.

Capital Departmental Expenditure Limit

The net nil movement in the capital element of the Departmental Expenditure Limit arises from:

Movements in Non-Voted Expenditure

xiii. A decrease in non-voted capital expenditure of £18,508,000 offset by an increase in voted capital expenditure of £18,508,000 relating to decreased spend of the Pensions Regulator.

xiv. An increase in non-voted capital expenditure of £12,000 offset by an decrease in voted capital expenditure of £12,000 relating to increased spend of the Pensions Advisory Service.

Administration Costs

The movement in the Administration Cost limit arises from the changes to the Resource Departmental Expenditure Limit as noted in items iii to vii.

Francis Maude (Conservative, Horsham)

Subject to parliamentary approval of the winter supplementary estimate 2010-11, the Cabinet Office total departmental expenditure limit (DEL) will be increased by £229,588,000 from £329,499,000 to £559,087,000.

The impact on resources and capital is set out in the following table:

£'000 | Main Estimate DEL | Changes | Winter Supplementary Estimate New DEL

| Voted | Non-voted | Total | Voted | Non-voted | Total | Voted | Non-Voted | Total

Resource DEL | 259,942 | 49,196 | 309,138 | +105,452 | +100,985 | +206,437 | 365,394 | 150,181 | 515,575

Of which: | | | | | | | | |

Administration Budget | 171,459 | 10,400 | 181,859 | +53,858 | - | +53,858 | 225,317 | 10,400 | 235,717

Capital DEL (2) | 45,887 | 2,000 | 47,887 | +23,250 | - | +23,250 | 69,137 | 2,000 | 71,137

Depreciation (1) | -27,526 | - | -27,526 | -99 | - | -99 | -27,625 | - | -27,625

Total DEL | 278,303 | 51,196 | 329,499 | +128,603 | +100,985 | +229,588 | 406,906 | 152,181 | 559,087

AME | | | | | | | | |

(1 )Depreciation, which forms part of resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting. (2) Capital DEL includes items treated as resource in estimates and accounts but which are treated as Capital DEL in budgets.

Summary of Changes in Departmental Expenditure Limit (DEL)

The change in the resource element of DEL is an increase of £206.437 million which comprises £163.636 million for x3 Machinery of Government transfers from other Government Departments, £47.303 million of agreed claims on the Reserve, £4.290 million budget covers transfers to other Government Departments and a reduction of £0.900 million for dividends receivable from Buying Solutions and an increase of £0.688 million for purchase of goods and services relating to the Office of Government Commerce, both excluded from the Machinery of Government transfer.

The change in the capital element of DEL is an increase of £23.250 million which comprises £21.750 million Capital DEL End Year Flexibility drawdown and a claim on the Reserve for £1.500 million.

Changes in Resource DEL (RDEL)

The changes which result in a net increase in Resource DEL (RDEL) of £206,437,000 are as follows:

Agreed Claims on the Reserve £47,303,000

A Claim on the Reserve for Grassroots Grants increases Resource DEL, Net Resource and Net Cash Requirement by £18,000,000.

A Claim on the Reserve for v Match Funding increases Resource DEL, Net Resource and Net Cash Requirement by £8,828,000.

A Claim on the Reserve from the Modernisation Fund to cover estate rationalisation and early departures increases Resource DEL, Net Resource and Net Cash Requirement by £10,475,000.

A Claim on the Reserve from the Transition Fund to support civil society organisations in adapting to a changing funding environment increases Resource DEL, Net Resource and Net Cash Requirement by £10,000,000.

Machinery of Government Transfers £163,636,000

The transfer of Directgov from the Department for Work and Pensions (DWP) to the Cabinet Office increases Resource DEL and Net Resource Requirement by £28,985,000 and Net Cash Requirement by £28,886,000.

The transfer of the Office of Government Commerce and its executive agency, Buying Solutions, from HM Treasury to the Cabinet Office increases Resource DEL and Net Cash Requirement by £20,657,000, increases Resource AME by £529,000 and increases Net Resource Requirement by £21,186,000.

The transfer of responsibility for political and constitutional reform from the Ministry of Justice to the Cabinet Office increases voted Resource DEL, Net Resource and Net Cash Requirement by £11,794,000. A transfer relating to the costs of the general election 2010 increases non-voted Resource DEL by £102,200,000.

Other changes outside Machinery of Government transfer £212,000

Dividends receivable from Buying Solutions of £900,000 and an increase of £688,000 for purchase of goods and services relating to the Office of Government Commerce. These adjustments are in addition to the Machinery of Government transfer. These changes decrease Resource DEL, Net Resource and Net Cash Requirement by £212,000.

Budget Cover Transfers to other Government Departments £4,290,000

A budgetary cover transfer from the Office for Civil Society to the Department for Communities and Local Government to cover the costs of the Government Office Network reduces Resource DEL, Net Resource and Net Cash Requirement by £290,000.

A budgetary cover transfer to the Security and Intelligence Agencies (SIA) for Information Assurance reduces Resource DEL, Net Resource and Net Cash Requirement by £4,000,000.

Transfer from non-voted to voted within Resource DEL

A switch within Resource DEL of £1,700,000 from non-voted to voted programme reflects savings made by executive NDPBs and reduces the Grant-in-Aid to eNDPBs and their non-voted expenditure and increases Office for Civil Society voted grants. The impact on Net Resource and Net Cash Requirement and Resource DEL is neutral.

Other neutral adjustments within Resource DEL

A switch within RDEL from administration to programme to cover costs of additional programme expenditure of £14,000,000.

A switch from Office for Civil Society resource grants to core Cabinet Office programme expenditure to re-profile the budget cuts reflected in the main estimate 2010-11 of £11,000,000.

Programme income has been reduced by £29,000,000 offset by a reduction in expenditure due to various programmes coming to an end.

An increase in administration income by £4,800,000 offset by administration expenditure on wages and salaries relating to the Office of Government Commerce; this adjustment is in addition to the Machinery of Government transfer.

A virement of £485,000 from independent offices-Civil Service Commissioners administration expenditure to the newly created executive non-departmental public body-Civil Service Commission-programme expenditure. The impact on Net Resource and Net Cash Requirement and Resource DEL is neutral. Non-Budget expenditure outside DEL has increased by £485,000.

A virement of £126,000 from independent offices-Civil Service Commissioners administration expenditure to core Cabinet Office. The impact on Net Resource Requirement, Net Cash Requirement and Resource DEL is neutral.

Changes in Capital DEL (COED

The changes which result in a net increase in Capital DEL (CDEL) of £23,250,000 are as follows:

End Year Flexibility / Claim on the Reserve

A drawdown to cover capital grants programmes run by the Office for Civil Society (OCS) increases Capital DEL and Net Cash Requirement by £21,750,000.

A drawdown on the Reserve from the Modernisation Fund to cover the costs of estate rationalisation increases Capital DEL and Net Cash Requirement by £1,500,000.

Neutral adjustment within Capital DEL

A switch within Capital DEL from Office for Civil Society capital grants to core Cabinet Office non-current assets to re-profile the budget cuts reflected in the main estimate 2010-11 has a neutral impact on Capital DEL and Net Cash Requirement, whereas Net Resource Requirement decreases by £2,500,000 and Net Voted Capital increases by the same amount.

Vincent Cable (Liberal Democrat, Twickenham)

Subject to parliamentary approval of the necessary supplementary estimate, the Department for Business, Innovation and Skills' DEL will be reduced by £3,796,000 from £20,805,607,000 to £20,801,811,000 and the Administration budget will be increased by £2,300,000 from £321,187,000 to £323,487,000.

Within the DEL change, the impact on Resources and Capital is as set out in the following table:

| Change | | New DEL |

Voted | Non-Voted | Voted | Non-Voted | Total

Resource (£000) | (220,865) | 217,069 | 7,772,927 | 11,263,059 | 19,035,986

of which:

Administration(1) budget | 2,300 | 0 | 319,843 | 3,644 | 323,487

Near cash in Resource DEL(2) | (220,965) | 217,169 | 6,210,394 | 11,094,742 | 17,305,136

Capital (£000) | (27,085) | 27,085 | 699,571 | 1,302,762 | 2,002,333

Less Depreciation(3) (£000) | (100) | 100 | (68,191) | (168,317) | (236,508)

Total (£000) | (248,050) | 244,254 | 8,404,307 | 12,397,504 | 20,801,811

(1)The total of the 'Administration Budget' and 'Near Cash in Resource DEL' figures may well be greater than total Resource DEL, due to the definitions overlapping. (2)Capital DEL includes items treated as Resource in Estimates and Accounts, but which are treated as Capital DEL in Budgets. 3Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes Capital spending and to include depreciation of those assets would lead to double counting.

The change in the resource element of the DEL arises from:

RfR1

i) An increase in voted receipts from the Department for Work and Pensions of £6,179,000 and an increase of non-voted expenditure by the Regional Development Agencies in respect of self-employment programmes;

ii) A budget transfer from the Department for Work and Pensions of £413,000 of non-voted expenditure for the Regional Development Agencies in respect of the School Gates initiative;

iii) An increase in voted receipts from the Department for Transport of £228,000 and an increase of non-voted expenditure by the Regional Development Agencies in respect of delivering a sustainable transport system;

iv) A virement of £535,000 from voted expenditure to non-voted expenditure by the Regional Development Agencies in relation to National Business Link marketing;

v) Virements from voted expenditure by the Strategic Investment Fund to non-voted expenditure by the Technology Strategy Board for the establishment of the UK Life Sciences Super Cluster initiative (£595,000), to advance new "prize" funds in emerging technologies (£5,000,000), the Composites Challenge Fund (£6,000,000), and the Industrial Biotechnical Demonstrator Fund (£2,555,000);

vi) A virement from the Strategic Investment Fund to the Skills Funding Agency (RfR3) of £3,700,000 for the automotive industry;

vii) A virement of £97,000 from the Skills Funding Agency (RfR3) to non-voted expenditure by the Regional Development Agencies for Train to Gain;

viii) A virement of £350,000 from Higher Education participation programmes (RfR3) for joint BIS funding of the National Council for Graduate Entrepreneurship;

ix) A virement of £20,000,000 from the non-voted Departmental Unallocated Provision to non-voted expenditure by the Higher Education Funding Council for England (RfR3);

x) A virement of £496,000 from Science and Society (RfR2) to corporate services;

xi) A virement of £2,533,000 from the non-voted Departmental Unallocated Provision for voted expenditure on research and analytical services (RfR3);

xii) A virement of £25,000 from the non-voted Departmental Unallocated Provision for voted expenditure on Government Skills (RfR3);

xiii) A virement of £3,102,000 consultancy savings (RfR3) to the non-voted Departmental Unallocated Provision;

xiv) A virement of £60,000 from Premature Retirement Compensation and Voluntary Colleges (RfR3) to the non-voted Departmental Unallocated Provision;

RfR2

i) A virement of £13,000 from voted Research-Based Initiatives to the non-voted Departmental Unallocated Provision for Science;

ii) A virement of £496,000 from Science and Society to corporate services (RfR1);

RfR3

i) A virement from voted expenditure to non-voted expenditure by the Higher Education Funding Council for England of Higher Education Shared Services (£20,000,000), the Higher Education Modernisation Fund (£133,000,000), Higher Education participation programmes (£10,500,000) and Annual Population Survey (£140,000);

ii) A virement of £14,000,000 from voted expenditure by the Skills Funding Agency to non-voted expenditure by the Higher Education Funding Council for England;

iii) A transfer of £1,990,000 from the Department for Education to non-voted expenditure by the UK Commission for Employment and Skills for the National Vocational Qualifications Levy;

iv) A transfer of £4,280,000 from the Department for Communities and Local Government for the Migration Impact Fund;

v) A transfer of £9,521,000 from the Ministry of Justice for Offender Learning;

vi) A transfer of £20,000,000 from the Skills Funding Agency to the Department for Education for Learners with Learning Difficulties and/or Disabilities;

vii) A virement of £2,533,000 from the non-voted Departmental Unallocated Provision (RfR1) for voted expenditure on research and analytical services;

viii) A virement of £25,000 from the non-voted Departmental Unallocated Provision (RfR1) for voted expenditure on Government Skills;

ix) A virement of £60,000 from Premature Retirement Compensation and Voluntary Colleges to the non-voted Departmental Unallocated Provision (RfRI);

x) A virement of £3,102,000 consultancy savings to the non-voted Departmental Unallocated Provision (RfR1);

xi) An increase of £4,176,000 in non-voted expenditure by the UK Commission for Employment and Skills, and increased voted contributions from other Departments;

xii) A virement from the Strategic Investment Fund (RfR1) to the Skills Funding Agency of £3,700,000 for the Automotive Industry;

xiii) A virement of £97,000 from the Skills Funding Agency to non-voted expenditure by the Regional Development Agencies (RfR1) for Train to Gain;

xiv) A virement of £350,000 from Higher Education participation programmes to RfR1 for joint BIS funding of the National Council for Graduate Entrepreneurship;

xv) An increase in voted receipts of £823,000 from the Department for Education for "Routes into Languages" funding to be distributed as non-voted expenditure by the Higher Education Funding Council for England;

xvi) An increase in voted receipts of £299,000 from the Department for Education for Repayment of Teacher Loan work to be undertaken by the non-voted Student Loans Company;

xvii) A virement of £930,000 to voted Higher Education Student Support from non-voted expenditure by the Higher Education Funding Council for England;

xviii) A virement of £6,048,000 from voted Higher Education Student Support to non-voted expenditure by the UK Commission for Employment and Skills;

xix) A virement of £4,904,000 from voted Higher Education Student Support to non-voted expenditure by the Student Loans Company;

xx) A virement of £100,000 from non-voted expenditure by the UK Commission for Employment and Skills to Adult Skills and Learner Support;

xxi) A virement of £20,000,000 from the non-voted Departmental Unallocated Provision (RfR1) to non-voted expenditure by the Higher Education Funding Council for England;

Also within the change to resource DEL, the changes to the Administration budget are (RfR1):

i) A virement of £2,300,000 from programme to administration using the Digital Switchover helpscheme underspend to fund broadband expansion;

The change in the Capital element of the DEL arises from:

RfR1

i) A virement of £10,000,000 from voted expenditure by the London Development Agency to the non-voted Departmental Unallocated Provision;

ii) A virement of £5,000,000 from voted expenditure of the Strategic Investment Fund to non-voted expenditure of the Technology Strategy Board for Competition IV - Low Carbon vehicle supply chains;

iii) An increase of £32,400,000 in voted receipts from the Department for Transport and an increase in non-voted expenditure by the Regional Development Agencies in respect of regional infrastructure funds;

iv) A virement of £5,000,000 from non-voted expenditure by the Higher Education Funding Council for England (RfR3) to voted expenditure by British Shipbuilders;

v) A virement of £1,860,000 from non-voted expenditure by the Higher Education Funding Council for England (RfR3) to the non-voted Departmental Unallocated Provision;

vi) A virement of £13,140,000 from non-voted expenditure by the Higher Education Funding Council for England (RfR3) to non-voted Launch Investment Receipts;

RfR2

i) A Virement of £1,300,000 from non-voted expenditure by the Research Councils to the Research Capital Investment Fund;

RfR3

i) A virement of £15,000 from non-voted to voted capital in relation to the UK Commission for Employment and Skills;

vii) A virement of £14,000,000 from non-voted expenditure by the Higher Education Funding Council for England to voted expenditure by the Skills Funding Agency;

viii) A virement of £5,000,000 from non-voted expenditure by the Higher Education Funding Council for England to voted expenditure by British Shipbuilders (RfRI);

ix) A virement of £1,860,000 from non-voted expenditure by the Higher Education Funding Council for England to the non-voted Departmental Unallocated Provision (RfR1);

x) A virement of £13,140,000 from non-voted expenditure by the Higher Education Funding Council for England to non-voted Launch Investment Receipts (RfRI).

Liam Fox (Conservative, North Somerset)

Subject to parliamentary approval of the necessary supplementary estimate, the Ministry of Defence departmental expenditure limits (DEL) will be increased by £102,744,000 (Voted and Non Voted) from £37,219,510,000 to £37,322,254,000. Within the DEL change, the impact on Resources and Capital are as set out in the following table:

| | £000s

| Change | New DEL

| Voted | Non-Voted | Voted | Non-voted | Total

Resource | 102,744 | - | 35,454,550 | 603,460 | 36,058,010

Ofwhich:AdministrationBudget | - | - | 2,182,586 | - | 2,182,586

Capital | - | - | 10,070,208 | 851 | 10,071,059

Depreciation(1) | - | - | -8,797,259 | -9,556 | -8,806,815

Total | 102,744 | - | 36,727,499 | 594,755 | 37,322,254

(1) Depreciation, which forms part of Resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.

The changes to the resource and capital elements of the DEL arise from:

Voted Resource DEL increase £102,744,000:

RfRl:

(1) An increase of £88,000,000 in Resource DEL to bring it into line with the audited outturn for 2009-10, updating the provisional adjustment made at main estimate, as agreed with the Treasury from the reserve.

(2) To increase the net non budget grant funding of £1,289,000 by reducing Resource DEL by £28,000 for the Council of Reserve Forces and Cadets Association, £600,000 for the National Army Museum, £871,000 for the Royal Hospital Chelsea, and £315,000 for the Cadets and Sea Scouts Association; and, increasing Resource DEL by reducing the Royal Navy National Museum non budget grant of £525,000.

RfR2:

(1) A transfer in of £16,033,000 from the Department for International Development being their contribution to the conflict pool.

The changes to Resource DEL and Capital DEL will lead to an increased net cash requirement of £104,033,000.

Michael Moore (Liberal Democrat, Berwickshire, Roxburgh and Selkirk)

Subject to parliamentary approval of the necessary supplementary estimates, the departmental expenditure limit (DEL) for Scottish Government will be increased by £302,413,000 from £28,401,374,000 to £28,703,787,000. Within the total DEL change, the impact on resources and capital is set out in the following table:

£'000 | Change | New DEL

Resource DEL | 158,993 | 25,857,454

Of which: | |

Non Ring-Fenced | 125,993 | 25,243,842

Capital DEL | 149,621 | 3,388,567

Resource DEL + Capital DEL | 308,614 | 29,246,021

Less Depreciation | 6,201 | 542,234

Total DEL | 302,413 | 28,703,787

DEL provision for the Scotland Office will remain unchanged.

The increase in the Scotland DEL takes account of the following adjustments to the Scottish Government provision:

the take-up of end-year flexibility (EYF) by the Scottish Government amounting

to £302,621,000 (including £6,201,000 for depreciation and impairments);

Clear Line Of Sight classification changes-student loans of £4,500,000.

The DEL increase also includes the following changes:

a transfer of £1,180,000 from the Home Office in respect of the migration impact fund;

a transfer of £100,000 from the Department for Environment Food and Rural Affairs (DEFRA) to Marine Scotland in respect of marine protected areas;

a transfer of £213,000 from the Department for Children, Schools and Families in

respect of the Child Trust Fund.

ANNEX A

changes to del

Scotland Office DEL

1. The Scotland Office DEL will remain unchanged.

Scotland DEL

1. Take-up of EYF by the Scottish Government of £302,621,000 (£153,000,000 near cash, £33,000,000 non-cash and £149,621,000 capital);

2. Clear Line Of Sight classification changes amounting to £4,500,000; and

3. Other transfers of £1,493,000 as follows:

a transfer of £1,180,000 from the Home Office in respect of the migration impact fund;

a transfer of £100,000 from the Department for Environment Food and Rural Affairs (DEFRA) to Marine Scotland in respect of marine protected areas;

a transfer of £213,000 from the Department for Children, Schools and Families in respect of the child trust fund.

4. In addition, provision for depreciation increases by £6,201,000.

5. Within the total DEL change, the impact on resources and capital is set out in the following table:

£'000 | Change | New DEL

Resource DEL | 158,993 | 25,857,454

Of which: | |

Non Ring-Fenced | 125,993 | 25,243,842

Capital DEL | 149,621 | 3,388,567

Resource DEL + Capital DEL | 308,614 | 29,246,021

Less Depreciation/Impairments | 6,201 | 542,234

Total DEL | 302,413 | 28,703,787

changes to ame

1. An increase in provision of £2,686,000 for NHS pensions (Scotland);

2. An increase in provision of £40,293,000 for teachers pensions (Scotland);

3. An increase in provision of £20,000,000 for NHS impairments;

4. A reduction in provision of £5,258,000 for student loans; and

5. A reduction in provision of £4,500,000 for Clear Line Of Sight classification changes-student loans.

changes to non budget

1. A reduction of £177,737,000 for changes in cash to accrual adjustments.

There is an increase in the grant payable to the Scottish Consolidated Fund of £539,572,000 from £26,609,096,000 to £27,148,668,000.