Departmental Expenditure Limits
House of Commons, 12 February 2009, TREASURY.
Ian Pearson (Labour, Dudley South)
Subject to Parliamentary approval of any necessary Supplementary Estimate, National Savings and Investments DEL will be increased by £18,900,000 to £183,547,000. Within DEL change, the impact on resources and capital are set out in the following table:
| Change | New Del |
| Voted | Non-voted | Voted | Non-Voted | Total
Resource Del: | 18,900 | — | 185,199 | — | 185,199
Of which: | | | | — |
Administration budget: | 18,900 | — | 185,199 | — | 185,199
Near cash in RDEL: | 18,900 | — | 180,592 | — | 180,592
Capital | — | — | 1,438 | — | 1,438
Depreciation* | — | — | -3,090 | — | -3,090
Total | 18,900 | | 183,547 | — | 183,547
* Depreciation which forms part of resource DEL is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of DEL arises from:
A drawdown of £ 6,900,000 from the Modernisation Fund for the upgrade of NS&l's core IT infrastructure.
The take up of DEL End Year Flexibility (EYF) of £12,000,000—near cash— to cover payments related to increased sales volumes.
The change in the administration budget arises from the Modernisation Fund draw down.
Liam Byrne (Labour, Birmingham, Hodge Hill)
Subject to parliamentary approval of the Spring Supplementary Estimate 2008-09, the Cabinet Office total Departmental Expenditure Limit (DEL) will be increased by £50,980,000 from £357,896,000 to £408,876,000.
The impact on resources and capital is set out in the following table:
£000
| Winter supplementary estimate DEL | Changes | Spring supplementary estimate new DEL
| Voted | Non voted | Total | Voted | Non voted | Total | Voted | Non voted | Total
Resource DEL | 304,681 | 37,476 | 342,157 | +48,725 | -50 | +48,675 | 353,406 | 37,426 | 390,832
Of which: | | | | | | | | |
Administration budget | 203,250 | — | 203,250 | -27,238 | — | -27,238 | 176,012 | — | 176,012
Near cash in RDEL | 260,874 | 38,591 | 299,465 | +46,725 | -35 | +46,690 | 307,599 | 38,556 | 346,155
Capital DEL(1) | 48,541 | 1,050 | 49,591 | +4,255 | +50 | +4,305 | 52,796 | 1,100 | 53,896
Depreciation(2) | -33,852 | — | -33,852 | -2,000 | — | -2,000 | -35,852 | — | -35,852
Total DEL | 319,370 | 38,526 | 357,896 | +50,980 | — | +50,980 | 370,350 | 38,526 | 408,876
(1) Capital DEL includes items treated as resource in Estimates and accounts but which are treated as capital DEL in budgets. (2) Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
Summary of Changes in DEL
The change in the resource element of DEL, an increase of £48.675 million, comprises £37.195 million agreed claims on the Reserve, a £0.165 million take up of End Year Flexibility, £12.312 million transfers of budgetary cover from/to other Government Departments and £0.997 million transfers to Capital DEL.
The change in the capital element of DEL, an increase of £4.305 million, comprises a £3.308 million take up of End year Flexibility and £0.997 million transfers from Resource DEL.
Changes in Resource DEL (RDEL)
The changes which result in a net increase in Resource DEL (RDEL) of £48,675,000 are as follows:
Agreed Claims on the Reserve
A drawdown from the Reserve for v Matched Funding for the Office of the Third Sector to cover grant expenditure increases Resource DEL and Net Cash Requirement by £13,000,000.
A drawdown from the Reserve for the Invest to Save Budget (ISB) for the Office of the Third Sector to cover grant expenditure increases Resource DEL and Net Cash Requirement by £916,000.
A drawdown on the reserve for the Grassroots Grant programme increases Resource DEL and Net Cash Requirement by £23,279,000.
End year Flexibility
A take up of End Year Flexibility (EYF) for the Invest to Save Budget (ISB) for the Office of the Third Sector increases Resource DEL and Net Cash Requirement by £165,000.
Budget cover transfers outwards
Transfers to other Government Departments to cover the costs of the Office of the Parliamentary Counsel reduces Resource DEL and net Cash Requirement by £1,728,000.
Budget cover transfers inwards
A transfer from the Department for Communities and Local Government (DCLG) to cover the costs of i Monitoring Security Co-ordination Centre (iMSCC) increases Resource DEL and Net Cash Requirement by £40,000.
A transfer from the Security and Intelligence Agencies to cover the costs of the SCOPE programme increases Non Cash Resource DEL by £14,000,000.
Transfers from Voted Resource to Capital DEL
A transfer from Voted Resource DEL to Capital DEL increases the Capital Budget by £947,000 and consists of the following: a £60,000 transfer from the House of Lords Appointments Commission Resource DEL to cover the costs of redeveloping the appointments database, a £750,000 transfer from the core Cabinet Office Resource DEL to enhance the computer system that supports the Civil Service Pensions and a £137,000 transfer from the core Cabinet Office Resource DEL to cover expenditure on projects implementing security measures.
Transfer from Non-Voted Resource to Capital DEL
The Commission for the Compact Limited, an executive NDPB, has arranged to transfer £50,000 of its Non-Voted Resource DEL to Capital DEL to cover expenditure on office equipment.
Changes in Capital DEL (CDEL)
The changes which result in a net increase in capital DEL (CDEL) of £4,305,000 are as follows:
End Year Flexibility
A take up of End Year Flexibility for the Government Security Zone to cover accounting adjustments on capital grants increases Capital DEL by £3,308,000; there is no corresponding increase in net Cash Requirement.
Transfers from Voted and Non-Voted Resource to Capital DEL
A transfer from Voted and Non-Voted Resource DEL to Capital DEL increases the Capital Budget by £997,000 as previously described in the section Changes in Resource DEL.
Spring Supplementary Estimate 2008-09: Charity Commission
Kevin Brennan (Labour, Cardiff West)
Plans to change the Charity Commission's Departmental Expenditure Limit (DEL) and administration budget for 2008-09.
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Charity Commission total DEL will be increased by £1,850,000 from £30,852,000 to £32,702,000. Within the total DEL change, the impact on resources and capital is as set out in the following table:
Departmental expenditure limits and administration budget
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL | 1,450 | __ | 32,422 | __ | 32,422
Of which(1): | | | | |
Administration budget | 1,450 | — | 32,422 | — | 32,422
Near cash in RDEL | 1,450 | __ | 31,272 | __ | 31,272
Capital DEL(2) | 400 | __ | 1,100 | __ | 1,100
Depreciation(3) | __ | __ | -820 | __ | -820
Total | 1,850 | __ | 32,702 | __ | 32,702
(1 )The total of 'Administration budget' and 'Near cash in Resource DEL' may be greater than total resource of DEL due to the definitions overlapping. (2 )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3 )Depreciation, which forms part of resource DEL, is excluded from total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of DEL and in the administration budget arises from the take up of the remaining £400,000 from the Modernisation Fund (out of a total £3 million agreed in the CSR 07 settlement) and the utilisation of £1,050,000 of the Commission's Resource EYF.
The change in the capital element of the DEL reflects the utilisation of £400,000 of the Commission's capital EYF.
All of these funds will be used to pay for the costs of making ready the Commission's new accommodation at Fox Court in London. The Commission is due to leave its current London accommodation in June 2009.
Leader of the House
Stephen Timms (Labour, East Ham)
Subject to parliamentary approval of the Supplementary Estimate, the HM Revenue & Customs total DEL will be increased by £75,248,000 from £4,539,797,000 to £4,615,045,000. Within the total DEL change, the impact on resources and capital are as set out in the following table:
| | | | £'000
| Change | New DEL
| Voted | Non-Voted | Voted | Non-voted | Total
Resource DEL | 62,248 | — | 4,144,792 | 347,739 | 4,492,531
Of which: | | | | |
Administration Budget (1) | 62,248 | — | 4,392,050 | — | 4,392,050
Near-cash in RDEL(1) | 62,248 | — | 3,804,910 | 381,887 | 4,186,797
Capital(2) | 16,648 | -3,648 | 301,514 | — | 301,514
Less Depreciation (3) | — | — | -179,000 | 0 | -179,000
Total DEL | 78,896 | -3,648 | 4,267,306 | 347,739 | 4,615,045
1The total of 'Administration Budget' and 'Near-cash in Resource DEL' figures may well be greater than total resource DEL, due to the definitions overlapping. 2Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. 3 Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of DEL arises from:
Modernisation Fund drawdown of £62,500,000 administration near cash costs to modernise and transform HMRC;
Near cash administration costs transfer of £252,000, to the Department for Innovation, Universities and Skills to fund the Skills Strategy for Government.
The change in the administration budget arises from the changes detailed in the resource element above.
The change in the capital element of DEL arises from:
Capital take up from the Modernisation Fund of £13,000,000 for various programmes supporting the modernisation of the Department.
Take up of Departmental Unallocated Provision of £3,648,000 to facilitate improvements to key operational activities—this is DEL neutral.
Andy Burnham (Labour/Co-operative, Leigh)
Subject to Parliamentary approval, the Department for Culture Media and Sport's Departmental Expenditure Limit (DEL) will be increased by £52,635,000 from £2,552,209,000 to £2,604,844,000 and the administration cost limit will increase by £6,281,000 from £49,258,000 to £55,539,000. Within the DEL change, the impact on resource and capital are set out in the following table:
| Change | New | DEL | £'000
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL | 8,285 | 5,750 | 115,364 | 1,519,127 | 1,634,491
Of which: | | | | |
Administration budget(1) | 6,281 | — | 55,539 | — | 55,539
Near-cash in RDEL | 8,285 | 25,750 | 106,203 | 1,334,288 | 1,440,491
Capital(2) | — | 38,600 | -430,742 | 1,514,095 | 1,083,353
Less Depreciation(3) | — | 10,000 | -6,456 | -96,544 | -103,000
Total | 8,285 | 54,350 | -321,834 | 2,936,678 | 2,614,844
(1)The total of Administration budget'and 'Near-cash in Resource DEL'figures may well be greater than total resource DEL, due to the definitions overlapping. (2)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3)Depreciation, which forms part of resource DEL, is excluded from total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of the DEL arises from:
Take up of £30,100,000 End Year flexibility comprising: (£20,000,000) UK Sports; (£3,000,000) Central Sports Support; (£2,000,000) Visit Britain; (£1,200,000) Museums, Libraries and Archives Commission; (£900,000) for the Regional Cultural Consortiums; and (£3,000,000) Administration budget.
Transfers from other Government Departments of: £2,000,000 from Department for Work and Pensions for Free Swimming; £1,650,000 from Department for International Development to UK Sport for International Inspirations; and £332,000 from Cabinet Office to cover baseline costs of the Parliamentary Counsel.
Transfers to other Government Departments of: £45,000 to the Office of Government Commerce (OGC) for the Centre for Expertise in Sustainable Procurement and £2,000 to the Department for Innovation, Universities and Skills (DIUS) for the Government Skills Strategy programme.
Partially offset by a transfer from non-cash Resource DEL to Capital DEL of £20,000,000.
The administration cost limit has increased by £6,281,000 from £49,258,000 to £55,539,000. This is as a result of a transfer from Cabinet Office of £332,000, a transfer to the OGC of £45,000 and a transfer to DIUS of £2,000 all detailed above; take up of £3,000,000 Administration End Year Flexibility and agreed net transfers of £2,996,000 from programme to administration costs, the latter to assist with the costs of the Government Olympic Executive.
The changes in the Capital element of the DEL arise from: Take-up of £18,600,000 End Year Flexibility for the Museums and Galleries; a transfer from non-cash Resource DEL to Capital DEL of £20,000,000.
Huw Irranca-Davies (Labour, Ogmore)
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Department for Environment, Food and Rural Affairs DEL will be reduced by £656,314,000 from £3,746,278,000 to £3,089,964,000 and the Administration Budget will be reduced by £45,880,000 from £356,463,000 to £310,583,000. These movements in the DEL Budget are mainly due to the machinery of government transfer to the Department of Energy and Climate Change. That apart, the overall effect on DEFRA's DEL Budget is minimal with the forecast outturn anticipated to run close to allocated budget. Within the DEL change, the impact on resources and capital are as set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource | -24,629 | -207,707 | 4,050,855 | -1,362,984 | 2,687,871
Of which: | | | | |
Administration Budget | -45,880 | — | 310,583 | — | 310,583
Near-cash in RDEL | -40,518 | -188,457 | 3,829,710 | -1,446,278 | 2,383,432
Capital | 405,780 | -12,250 | 259,902 | 338,939 | 598,841
Depreciation(1) | -8,748 | 2,800 | -96,949 | -99,799 | -196,748
Total | 439,157 | -217,157 | 4,213,808 | -1,123,844 | 3,089,964
(1) Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of the DEL arises from:
(i) a transfer of £45,846,000 administration spend from the climate change group located in the Department for Environment, Food and Rural Affairs (DEFRA) to the Department of Energy and Climate Change (DECC);
(ii) a transfer of £34,000 administration spend to Department for Innovation, Universities and Skills (DIUS) for skills strategy;
(iii) a transfer of £152,512,000 programme spend from the Climate Change Group located in DEFRA to DECC
(iv) a transfer of £34,000,000 Non-voted Departmental Unallocated Provision (DUP) to the DECC;
(v) take up of End Year Flexibility for Investing in Communities Invest to Save Budget (ISB) of £56,000.
The change in the capital element of the DEL arises from:
(i) a transfer of £402,030,000 from the Climate Change Group located in DEFRA to DECC; (ii) a transfer of £16,000,000 Non-voted Departmental Unallocated Provision (DUP) to DECC.
The change in the depreciation budget is due to:
(i) £3,102,000 transferring to DECC for the machinery of government transfer;
(ii) a transfer of £12,050,000 non cash costs from Natural England to DEFRA across non-cash categories;
(iii) re-profiling of Forestry Commissions (FC) Budget of £3,000,000 across non-cash categories.
Jack Straw (Labour, Blackburn)
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Ministry of Justice (MoJ), Northern Ireland Court Service (NICS) and The National Archives (TNA) Total Departmental Expenditure Limit (DEL) will be increased as follows:
Total DEL for MoJ (RfR1, 2 and 3) is increased by £126,542,000 from £9,743,845,200 to £9,870,387,200 and the administration budget has increased by £195,000 from £461,841,000 to £462,036,000.
Total AME for MoJ (RfR1, 2 and 3) is increased by £455,000,000.
Total DEL for NICS is increased by £20,000,000 from £132,569,000 to £152,569,000 and the administration budget has decreased by £(1,000,000) from £(507,000) to £(1,507,000). This is due to an increase in administration income.
Total DEL for the TNA increased by £1,104,000 from £43,420,000 to £44,524,000 and the administration budget remains unchanged.
Within the Total DEL change for MoJ (RfR1, 2 and 3) the impact on resources and capital are as set out in the following table.
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL: | 260,745 | (196,995) | 5,880,642 | 3,433,926 | 9,314,568
Of which: | | | | |
Administration(1) | 195 | 0 | 462,036 | 0 | 462,036
Near cash in Resource DEL | 49,959 | 3,767 | 4,682,905 | 3,958,031 | 8,640,936
Capital(2) | 68,778 | 912 | 921,818 | 40,512 | 962,330
Depreciation(3) | (1,980) | (4,918) | (398,308) | (8,203) | (406,511)
Total | 327,543 | (201,001) | 6,404,152 | 3,466,235 | 9,870,387
Total AME | 455,000 | 0 | 595,000 | 0 | 595,000
(1) The total of "administration budget" and "near-cash in Resource DEL" figures may well be greater than total Resource DEL due to the definitions overlapping. (2 )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
(1) The change in the Resource and Capital DEL for MoJ arises from:
RfR1: To promote the development of a modern, fair, cost-effective and efficient system of justice for all.
Resource Change: Admin (total decrease of (£685,000))
Take up of End-Year Flexibility (EYF):
An increase of £95,000 in Resource DEL in respect of EYF draw down for the Diana Princess of Wales Inquest.
Other Increases:
An increase of £546,000 in Resource DEL in relation to the transfer of Corporate Costs from the Home Office.
Decreases:
A decrease in admin budget of £(1,104,000) in relation to a machinery of government change of the Statutory Publications Office to The National Archives (TNA).
A decrease in admin budget of £(222,000) transferred to the Department for Innovation Skills and Universities (DIUS) in relation to Government Skills Funding.
Resource Change: Programme (total increase of £97,957,000)
Take up of End-Year Flexibility (EYF):
An increase of £5,000,000 in Resource DEL in respect of EYF draw down for The Reform and Modernisation Programme (RAMP).
Reserve Claims:
An increase of £35,000,000 in Resource DEL in relation to the Modernisation Fund.
An increase of £15,000,000 in Resource DEL in relation to the Prison Capacity Programme.
Other Increases:
An increase in Resource DEL of £22,739,000 in relation to the Young Offender Education Funding from the Department for Children, Schools and Families (DCSF).
An increase in Resource DEL of £10,000,000 in relation to an increase in Pension Provisions within the National Probation Service Local Area Boards.
An increase in Resource DEL of £4,100,000 in relation to Intensive Fostering from the DCSF.
An increase in Resource DEL of £1,778,000 from the Department of Health (DoH) in relation to the Mental Health Review Tribunal Funding.
An increase in Resource DEL of £1,455,000 from the Department of Work and Pensions (DWP) in relation to Employment and Support Allowance (ESA) Funding.
An increase in Resource DEL of £1,055,000 in relation to the Parliamentary Counsel Office from the Cabinet Office.
An increase in Resource DEL of £800,000 in relation to Social Workers in Young Offender Institutes from the DCSF.
An increase in Resource DEL of £680,000 in relation to the implementation of the Youth Rehabilitation Order from the DCSF.
An increase in Resource DEL of £220,000 in relation to Child Support Reform Funding from the DWP.
An increase in Resource DEL of £130,000 in relation to the Virtual Courts Pilot Scheme from the Crown Prosecution Service (CPS).
Resource Change: Programme (total decrease of (£34,822,000))
Decreases:
A decrease of £(19,960,000) Resource DEL transferred to the DoH in respect of the Escorts and Bed watches.
A decrease of £(9,936,000) Resource DEL transferred to the DoH to cover prisoner health care costs of new prison places as part of the Prison Capacity Programme.
A decrease of £(2,600,000) Resource DEL transferred to the CPS in relation to the Victims Surcharge.
A decrease of £(1,957,000) Resource DEL transferred to the DIUS to cover prisoner education costs of new prison places as part of the Prison Capacity Programme.
A decrease of £(200,000) Resource DEL transferred to the DoH in respect of IDTS Clinical funding.
A decrease of £(169,000) Resource DEL transferred to the CPS in relation to Liverpool Criminal Justice Centre.
Capital Change (total increase of £69,690,000)
Take up of End-Year Flexibility (EYF):
An increase of £131,000,000 in Capital DEL in respect of EYF draw down for 102 Petty France.
An increase of £3,200,000 in Capital DEL in respect of EYF drawn down for CORE Capital Grants.
Other Increases:
An increase of £1,500,000 in Capital DEL in relation to the provision of CCTV in Prisoner Communal Areas from the Home Office.
An increase of £990,000 in Capital DEL in relation to the Accelerated Contest Funding from the Home Office.
Decreases:
A decrease of £(67,000,000) in Capital DEL in relation to the Carter Programme funding drawn down in the Winter Supplementary Estimate, but now re-profiled into 2009-10.
AME Changes (total increase of £455,000,000)
Other Increases:
An increase of £430,000,000 provision for the National Offender Management Service relating to the impairment of assets.
An increase of £25,000,000 provision for Her Majesty's Court Service relating to the impairment of assets.
RfR2: Overseeing the effective operation of the devolution settlement in Scotland and representing the interests of Scotland in the UK Government.
Resource Change: Admin (total increase of £880,000)
Take up of End-Year Flexibility (EYF):
An increase of £771,000 in Resource DEL in respect of an EYF draw down relating to the Secretary of State for Scotland.
An increase of £109,000 in Resource DEL in respect of an EYF draw down relating to the Office of the Advocate General.
Resource Change: Programme (total increase of £420,000)
Other Increases:
An increase of £420,000 Resource DEL in respect of EYF draw down relating to the Parliamentary Boundary Commission for Scotland.
RfR3: To support the Secretary of State in discharging his role of representing Wales in the UK Government, representing the UK Government in Wales and ensuring the smooth running of the devolution settlement in Wales.
Total DEL for Wales has remained unchanged.
There is no change in the Capital DEL for RfR2 and RfR3
(2) The change in the Resource DEL for the Northern Ireland Court Service (NICS) arises from:
Within the Total DEL change for Northern Ireland Court Service, the impact on resources and capital are as set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL: | (2,000) | 22,000 | 56,974 | 96,494 | 153,468
Of which: | | | | |
Administration(1) | (1,000) | — | (1,507) | — | (1,507)
Near cash in Resource DEL | (2,000) | 22,000 | 42,023 | 93,706 | 135,729
Capital(2) | — | — | 8,200 | — | 8,200
Depreciation(3) | — | — | (8,658) | (441) | (9,099)
Total | (2,000) | 22,000 | 56,516 | 96,053 | 152,569
(1) The total of "administration budget" and "near-cash in Resource DEL" figures may well be greater than total Resource DEL due to the definitions overlapping. (2 )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
Resource Change: Admin (total decrease of £(1,000,000))
Other Decreases:
The change in the administration budget arises from a £1,000,000 increase in civil court fee income. This will be offset against additional related costs to dispose of civil court business. The appropriations in aid are classified as administrative income and so the additional fee income will reduce the administration cost limit by £1,000,000.
Resource Change: Programme (total increase of £21,000,000)
Take up of End-Year Flexibility (EYF):
Take up of EYF of £20,000,000 to cover an increased requirement in near-cash admin costs due to a projected shortfall by Northern Ireland Legal Services commission (NILSC) on legal aid expenditure. This is comprised of £9,316,000 near-cash, plus an agreed switch to near-cash of £847,000 non-cash and £9,837,000 capital.
Other Increases:
An increase in admin income as stated above has a subsequent impact of an increase of £1,000,000 in programme costs.
Transfer of £2,000,000 resources to finance increase in grant to the NILSC. In budgetary terms, the utilisation of savings on resource DEL (voted) are being used to cover an increase in resource DEL spending (non-voted) by the NILSC.
(3) The change in the Resource DEL for The National Archives arises from:
Within the Total DEL change for The National Archives (TNA), the impact on resources and capital are as set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL: | 1,104 | — | 47,704 | — | 47,704
Of which: | | | | |
Administration(1) | — | — | — | — | —
Near cash in Resource DEL | 1,104 | — | 36,953 | — | 36,953
Capital(2) | — | — | 2,500 | — | 2,500
Depreciation(3) | — | — | (5,680) | — | (5,680)
Total | 1,104 | — | 44,524 | — | 44,524
(1) The total of "administration budget" and "near-cash in Resource DEL" figures may well be greater than total Resource DEL due to the definitions overlapping. (2 )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
Resource Change: Programme (total increase of £1,104,000)
Other Increases:
An increase in Resource DEL of £1,104,000 in relation to a machinery of government change with a transfer of the Statutory Publications Office from the MoJ to TNA.
DUCHY OF LANCASTER
Kevin Brennan (Labour, Cardiff West)
Subject to parliamentary approval of any necessary Supplementary Estimate, the UK Statistics Authority's total departmental expenditure limit (DEL) will be increased by £200,000 from £216,865,000 to £217,065,000, and the programme budget will be increased by £200,000.
Within the DEL change, the impact on resources and capital is as set out in the following table.
£000
| Change | New DEL
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL | 6,200 | -6,000 | 217,065 | — | 217,065
Of which: | | | | |
Administration Budget(1) | — | — | — | — | —
Near-cash in RDEL | 6,800 | -7,000 | 181,565 | 15,000 | 196,565
Capital(2) | — | — | 21,000 | — | 21,000
Less depreciation(3) | -1,885 | — | -18,385 | — | -18,385
Total | 4,315 | -6,000 | 219,680 | — | 219,680
(1) The total of 'Administration Budget' and 'Near-cash in Resource DEL' figures may well be greater than total resource DEL, due to the definitions overlapping. (2) Capital DEL includes items treated as resource in estimates and accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of DEL arises from:
Public Expenditure Survey transfers from other Government Department in support of migration statistics.
The take up of departmental unallocated provision (DUP) of £6,000,000 in order to finance in-year pressures and to meet new priorities.
The change in the programme budget arises from transfer from other Government Department of £200,000 and the draw down of £6,000,000 of DUP.
Jim Murphy (Labour, East Renfrewshire)
Subject to parliamentary approval of the necessary Supplementary Estimates, the departmental expenditure limit (DEL) provision for the administration of the Scotland Office will be increased by £1,300,000 and takes account of the following routine adjustment:
A take-up of near cash end year flexibility of £1,300,000.
The increase will be added to the planned total of public expenditure spending commitments in the current financial year.
The Scotland DEL will increase by £75,866,000 from £27,459,943,000 to £27,535,809,000.
The Scotland DEL increase takes account of the following routine adjustments to the Scottish Executive provision:
a transfer of £114,000 from the Department for Work and Pensions in respect of child poverty pilots;
a transfer of £157,000 from the Department for Children, Schools and Families in respect of Child Trust Fund—Top ups for Looked after Children;
the take up of 2008 Budget consequentials by the Scottish Executive amounting to £5,435,000;
the take up of 2008 Budget consequentials in respect of Capital Fiscal Stimulus amounting to £32,960,000;
the take up of additional Capital Fiscal Stimulus funding amounting to £20,200,000; and
an increase in respect of classification change for Scottish water cost of capital amounting to £17,000,000.
Solicitor-General
Pat McFadden (Labour, Wolverhampton South East)
Subject to Parliamentary approval of the necessary Supplementary Estimate, the Postal Services Commission DEL will be increased by £1,000 from £152,000 to £153,000 and the administration budget will be increased by £1,000 from £2,000 to £3,000. The impact on resource DEL is set out in the following table. There is no impact on capital DEL.
| | New DEL
£'000
| Change | Voted | Non-voted | Total
Resource DEL Of which: * Administration budget Near-cash in RDEL | 1 1 1 | 3 3 -537 | 0 0 0 | 3 3 -537
Capital DEL** | 0 | 150 | 0 | 150
Depreciation | 0 | -530 | 0 | -530
Total | 1 | -377 | 0 | -377
*The total of the 'Administration Budget' and 'Near-cash in Resource DEL' figures may well be greater than total resource DEL, due to the definitions overlapping **Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets.
Depreciation, which forms part of resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in resource DEL is as a result of additional administration expenditure relating to research into the social value of the Post Office (£100,000) offset by increased appropriations-in-aid income from the Department for Business, Enterprise and Regulatory Reform (BERR).
There is a token £1,000 increase in the resource DEL and the administration budget.
Hazel Blears (Labour, Salford)
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Department for Communities and Local Government's Departmental Expenditure Limits for 2008-09 will change as follows:
The Department for Communities and Local Government's Main Programmes DEL will be increased by £162,288,000 from £11,499,316,000 to £11,661,604,000 and the administration budget will also be increased by £1,240,000 from £289,689,000 to £290,929,000. Within the DEL change, the impact on resources and capital are as set out in the following table:
£'000
| Change | NEW DEL
| Voted | Non-voted | Voted | Non-voted | Total
Resource | -21,710 | 21,879 | 4,004,919 | 370,749 | 4,375,668
Of which | | | | |
Administration budget (*) | -260 | 1,500 | 289,429 | 1,500 | 290,929
Near-cash in RDEL | -94,739 | 94,908 | 3,897,409 | 324,846 | 4,222,255
Capital (**) | -378,959 | 531,159 | 2,102,515 | 5,224,685 | 7,327,200
Depreciation(***) | 1,071 | 8,848 | -36,206 | -5,058 | -41,264
Total | -399,598 | 561,886 | 6,071,228 | 5,590,376 | 11,661,604
(*)The total of 'Administration budget' and 'Near cash in Resource DEL' figures may well be greater than total Resource DEL, due to the definitions overlapping. (** )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (*** )Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of the DEL arises from:
(i) a transfer of £1,031,000 to Request for Resources 2 (Local Government DEL) (see 2(iv) below).
(ii) a net transfer of £1,200,000 from other government departments, comprising:
To other Government Departments
Programme Expenditure
(a) £40,000 to the Cabinet Office for the Government Secure Zone Security Monitoring and Control Centre.
From Other government Departments
Administration Costs (Government Offices)
(b) £1,240,000 from the Department for Business, Enterprise and Regulatory Reform for early exit costs of BERR staff in the Government Offices.
(iii) a net increase in receipts of £20,467,000 offsetting increases in provision of £100,000 for Homelessness and Housing Reform for the pilot scheme on overcrowding and worklessness; £1,000,000 for the Community Builders Fund; £500,000 for the cross Government project on adults facing chronic exclusion; £2,069,000 for Fire control rooms; £11,400,000 for Firelink payments made by the Department on behalf of the devolved Administrations; £28,000 for choice based lettings; £4,200,000 for central administration comprising £700,000 for additional work on behalf of other Government Departments and £3,500,000 for outward secondees to other organisations; and £1,170,000 for Government Offices to reflect additional work being undertaken on behalf of the Department of Health.
(iv) a net transfer of £21,879,000 from voted to non- voted provision comprising:
From voted to non-voted provision
(a) £2,500,000 to FireBuy for costs arising from litigation in connection with the Integrated Clothing Project;
(b) £40,953,000 to the Homes and Communities Agency (HCA) to reflect the accounting implications of the application of merger accounting to the establishment of the HCA;
(c) £45,000,000 to non-voted European Regional Development Fund (ERDF) to cover the near cash utilisation cost associated with the balance sheet provision raised in 2007-08 in respect of 1997-99 programmes;
(d) £5,481,000 to the Homes and Communities Agency comprising £1,930,000 for set up costs, £3,100,000 for the ATLAS programme and £451,000 to cover costs of staff seconded to the HCA;
(e) £722,000 to the Tenant Services Authority as part of the Authority's first year budget; and
Administration costs
(f) £1,500,000 to non-voted Government Offices from central administration to adjust budgets for utilisation of provisions in respect of early exit costs.
From non- voted to voted provision
(g) £1,100,000 to Implementing Planning Reforms for the Mine Waste Directive and the Renewable Energy Strategy;
(h) £10,748,000 to Government Offices for a new balance sheet provision for staff early exits;
(i) £8,000,000 for bad debts on old ERDF programmes;
(j) £800,000 for the cost of capital charge on lending to the Fire Service College;
(k) £429,000 to New Dimension for depreciation charges on Mass Decontamination vehicles;
(i) £50,200,000 non-cash for the creation of new provisions for future liabilities in respect of financial corrections to old ERDF programmes, including £18,807,000 from Departmental Unallocated Provision; and
(m) £3,000,000 non-cash for the creation of provisions for future liabilities under the Homeowners Mortgage Support scheme.
The change in the administration budget arises from a transfer of £1,240,000 from the Department for Business, Enterprise and Regulatory Reform (see l(ii) above)
The change in the capital element of the DEL arises from
(v) An increase of £149,700,000 for the changes announced in the Pre Budget report in November 2008 as part of the fiscal stimulus aimed at supporting the economy through the current economic downturn. The increase comprises £87,000,000 for Arms Length Management Organisations; £43,000,000 for Gap funding for large scale voluntary transfers and £19,700,000 for the Community Infrastructure Fund;
(vi) a transfer of £2,500,000 from Request for Resources 2 ( Local Government DEL) for the Regeneration Monitoring and Digital Inclusion programme;
(vii) A decrease in voted receipts of £105,100,000 offset by decreases in non-voted provision of
(a) £50,000,000 for Thames Gateway comprising £44,000,000 through the Homes and Communities Agency (HCA), £3,000,000 through the London Urban Development Corporation and £3,000,000 through the Thurrock Urban Development Corporation; and
(b) £55,100,000 for the HCA's Affordable Housing Programme.
(viii) A net decrease in voted receipts of £10,099,000 offset by a net decrease in voted expenditure comprising:
(a) a decrease of £10,300,000 for the New Deal for Communities;
(b) an increase of £150,000 for central administration in respect of the Department's interest in the sale of land transferred to the Building and Research Establishment; and
(c) an increase of £51,000 for choice based lettings.
(ix) A net transfer of £486,559,000 from voted to non- voted provision comprising
From voted to non-voted provision
(a) £541,408,000 to the Homes and Communities Agency (HCA) to reflect the accounting implications of the application of merger accounting to the establishment of the HCA.
From non- voted to voted provision
(b) £20,253,000 from the Olympic programme contingency for payments to the Department for Culture, Media and Sport towards the 2012 Olympics;
(c) £34,596,000 to Fire control rooms for the temporary acquisition of two Regional Control Centre leases.
(2) The Department for Communities and Local Government's Local Government DEL will be increased by £18,941,000 from £24,873,688,000 to £24,892,629,000. Within the DEL change, the impact on resources and capital are as set out in the following table:
| | £'000
| Change | NEW DEL
| Voted | Non-voted | Voted | Non-voted | Total
Resource | 11,441 | 0 | 24,614,751 | 103,109 | 24,717,860
Of which | | | | |
Administration budget (*) | | | | |
Near-cash in RDEL | 11,441 | 0 | 24,614,751 | 102,223 | 24,716,974
Capital (**) | 7,500 | 0 | 174,582 | 1,018 | 175,600
Depreciation(***) | 0 | 0 | 0 | -831 | -831
Total | 18,941 | 0 | 24,789,333 | 103,296 | 24,892,629
(**)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (***)Depreciation, which forms part of resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of the DEL arises from:
(i) take up of End Year Flexibility of £10,000,000 for Local Government Public Services Agreement to cover planned spending over the amount provided in the Comprehensive Spending Review 2007;
(ii) take up of End Year Flexibility of £410,000 for Invest to Save Budget Special Grant to provide funding for projects relating to this financial year;
(iii) an increase in receipts of £1,500,000 offsetting an increase in expenditure for Private Finance Initiative (PFD Special Grant to meet the higher costs of PFI projects for this financial year;
(iv) a net transfer of £1,031,000 from Request for Resources 1 (Main DEL) comprising:
a) £831,000 for Best Value Inspection to support Audit Commission Comprehensive Performance Assessment work on Fire and Rescue Authorities;
b) £200,000 for London Governance for the Mayor's new planning powers under the Greater London Authority Act 2007
The change in the capital element of the DEL arises from
(v) a take up of End Year Flexibility of £10,000,000 for Local Government Public Services Agreement to cover planned spending over the amount provided in the Comprehensive Spending Review 2007;
(vi) A transfer of £2,500,000 to Request for Resources 1 (Main DELI (see l(iv) above).
John Hutton (Labour, Barrow and Furness)
Subject to Parliamentary approval of the necessary Supplementary Estimate, the Ministry of Defence Departmental Expenditure Limits (DEL) will be increased by £626,555,000 (Voted and Non Voted) from £37,510,083,000 to £38,136,638,000. Within the DEL change, the impact on Resources and Capital are as set out in the following table:
| | £'000
| Change | New DEL
| Voted | Non-Voted | Voted | Non-voted | Total
Resource | 764,301 | 33,254 | 37,891,603 | 179,450 | 38,071,053
Of which: Administration Budget | - | -64,153 | 2,294,096 | - | 2,294,096
Near-cash in RDEL | 271,362 | 33,254 | 26,101,150 | 409,964 | 26,511,114
Capital | 329,000 | - | 8,312,045 | 851 | 8,312,896
Depreciation(*) | -500,000 | - | -8,237,825 | -9,486 | -8,247,311
Total | 593,301 | 33,254 | 37,965,823 | 170,815 | 38,136,638
(*)Depreciation, which forms part of Resource DEL, is excluded from the total DEL since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The changes to the resource and capital elements of the DEL arise from:
a net increase in the RfR2 of near Cash Resource of £237,000,000 and near Cash Capital DEL of £65,000,000 ; and a further Indirect (non Cash) Resource DEL request of £500,000,000 to reflect the forecast costs of peace keeping operations in Iraq, Afghanistan and Balkans;
the take up of Resource End Year Flexibility (EYF) of £45,000,000 and Capital End Year Flexibility of £214,000,000;
transfers in from the Foreign & Commonwealth Office of £1,800,000 for helicopter pilot training for counter narcotics operations (RfRl); transfers in from the Department for International Development of £300,000 being reimbursement for locally employed contractors in Iraq (RfR2), £18,899,000 as a contribution to the Global Conflict Prevention Costs Pool (RfR2), and £917,000 as a contribution to the Iraq Stabilisation Aid Fund (RfR2);
transfers out to the Department for Innovation, Universities and Skills being the MOD's contribution to the new Government Skills Strategy initiative of £235,000 (RfRl); and a transfer out to the FCO of £15,350,000 being the MOD's contribution to the Stabilisation Aid Fund (RfR2);
additional fiscal Capital DEL provision of £50,000,000 relating to the MOD's planned sale of its Spectrum holding;
to re-allocate Royal Hospital Chelsea (RHC) costs of £9,224,000 from Non-Voted expenditure to other current Voted expenditure to correct a misalignment in the Winter Supplementary Estimates;
to re-allocate DEL Grants in Aid from DEL to Non Budget Grants in Aid (Non Voted) to reflect a further classification changes for the Council of Reserve Forces & Cadets Association of £29,081,000;
to increase Grants in Aid funding for the Royal Naval Museum of £773,000; the Council of Reserve Forces and Cadet Association (CRFCA) of £3,000,000; and the RAF Museum of £400,000; by reducing Resource DEL current costs and increasing Non Budget Grants in Aid with no overall impact on resource;
to increase operating Appropriations in Aid by £180,700,000 and Non Operating Appropriations in Aid by £25,879,000 to reflect current forecasts of outturn offset by corresponding changes to Resource and Capital spending with no overall effect on Resource or Capital DEL;
to revise sub-head provisions to reflect Resource and Capital revisions in allocations between Top Level Budget Holders to match required defence outputs, with no overall impact on DEL;
The changes to Resource DEL and Capital DEL will lead to an increased net cash requirement of £626,555,000.
David Miliband (Labour, South Shields)
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Foreign and Commonwealth Office Departmental Expenditure Limit (DEL) will be increased by £128,154,000 from £2,080,557,000 to £2,208,711,000. The administration budget will be decreased by £18,000 from £430,535,000 to £430,517,000. Within the DEL change, the impact on resources and capital are as set out in the following table:
| Change | New DEL
| Voted | Non-Voted | Voted | Non-Voted | Total
Resource | 98,154 | — | 2,074,701 | 3,000 | 2,077,701
Of which: | | | | |
Administration budget(1) | -18 | — | 430,517 | — | 430,517
Near-cash in Resource DEL | 118,154 | — | 1,923,647 | 17,000 | 1,940,647
Capital(2) | 10,000 | — | 216,060 | — | 216,060
Depreciation(3) | 20,000 | — | -85,050 | — | -85,050
Total | 128,154 | — | 2,205,711 | 3,000 | 2,208,711
(1 )The total of 'Administration budget' and 'Near cash in Resource DEL' figures may well be greater than total Resource DEL, due to definitions overlapping. (2 )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3 )Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The change in the resource element of the DEL arises from:
Request for Resources 1
Administration
I. £18,000 transfer of administration budget to DIUS for Government Skills.
Programme
I. Take up of £10,800,000 other current EYF in respect of restructuring.
II. Take up of £6,500,000 other current EYF in respect of adverse currency fluctuations.
III. Claim on the Reserve of £24,500,000 other current in respect of Consular Premiums.
IV. Claim on the Reserve of £24,000,000 current grants in respect of the International Subscriptions cost sharing agreement.
V. Transfer of £4,700,000 from the Home Office for work on migration.
VI. Transfer of £1,000,000 other current from DfID in respect of the Returns and Reintegration Fund.
VII. Transfer of £200,000 other current from DfID in respect of bilateral project work in Africa.
VIII. Transfer of £11,120,000 other current to the Security and Intelligence Agencies for expansion and capability.
IX. Transfer of £1,800,000 other current to MoD for counter-narcotics work in Afghanistan.
X. Transfer of £270,000 other current to the Security and Intelligence Agencies for expansion and capability.
XI. Transfer of £104,000 other current to the Home Office in respect of gratis visas for Zenit St Petersburg fans.
XII. Transfer of £10,000,000 other current to capital in respect of capital pressures, in particular FCO Services capitalisation.
Neutral Changes
I. To reflect the estimated indirect resource impact of the introduction of the IFRS Financial Instruments trigger point 1 on unrealised gains for forward purchase of Stirling contracts of £80,000,000, with an offsetting debit in impairments.
II. Transfer of £39,400,000 other current from RfRl to RfR2 in respect of Peacekeeping pool funds in Africa.
III. Transfer from depreciation to near cash other current of £20,000,000.
IV. Transfer of £6,900,000 other current to British Council in respect of exchange rate fluctuations and the cost of the Turner exhibition in China.
V. Budget neutral increase in A-in-A and administration costs of £20,000,000 for services provided to partners across government, including FTN telecom charges.
VI. Budget neutral increase in A-in-A and other current of £22,000,000 for Consular fees.
VII. Budget neutral increase in A-in-A and other current of £309,700,000 for UKBA charges following the MoG change.
VIII. Budget neutral increase in A-in-A and other current of £600,000 in respect of FCOS interest payments.
Request for Resources 2
Programme
I. A claim on the Reserve of £27,600,000 current grants in respect of the take up of the balance of Peacekeeping pool funds of which £13,925,000 for Africa and £13,675,000 for Rest of World.
II. Transfer of £15,350,000 current grants from MoD in respect of the Stabilisation Aid Fund of which £13,600,000 is for work in Afghanistan and £1,750,000 for work in Iraq.
III. Transfer of £1,000,000 current grants from DfID in respect of global conflict prevention work.
IV. Transfer of £6,516,000 current grants from DfID in respect of conflict prevention work in Africa.
V. Transfer of £216,000 current grants from DflD in respect of work in Ghana by the Carter Centre.
VI. Transfer of £916,000 to DflD in respect of management of Stabilisation Aid Fund projects in Afghanistan.
Neutral Changes
I. Transfer of £39,400,000 other current from RfRl to RfR2 in respect of Peacekeeping pool funds in Africa.
The change in the capital element of the DEL arises from:
Request for Resources 1
Capital
I. Transfer of £10,000,000 other current to capital in respect of capital pressures, in particular FCO Services capitalisation.
John Denham (Labour, Southampton, Itchen)
Subject to Parliamentary approval of any necessary Supplementary Estimate, the Department for Innovation, Universities and Skills Departmental Expenditure Limit (DEL) will be increased by £309,113,000 from £18,241,368,000 to £18,550,481,000 and the Administration Budget will be increased by £5,917,000 from £71,733,000 to £77,650,000.
Within the DEL change, the impact on resources and capital are as set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL | 35,434 | 237,857 | -4,015,406 | 20,686,468 | 16,671,062
Of which: | | | | |
Administration budget(1) | 5,917 | — | 77,650 | — | 77,650
Near Cash in Resource DEL(1) | 31,082 | 156,494 | -5,223,629 | 20,449,371 | 15,225,742
Capital DEL(2) | 1,524 | 130,476 | -159,654 | 2,281,613 | 2,121,968
Less Depreciation(3) | -65,178 | -31,000 | -69,796 | -172,753 | -242,549
Total DEL | -28,220 | 337,33 | -4,244,847 | 22,795,328 | 18,550,481
(1 )The total of 'Administration Budget' and 'Near Cash in Resource DEL' figures may well be greater than total Resource DEL, due to the definitions overlapping. (2) Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of Resource DEL, is excluded from the total DEL in the table, since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
Resource DEL
The increase in the Resource element of the DEL of £273,291,000 arises from an increase in the voted element of Resource DEL of £35,434,000 and an increase of £237,857,000 in the non-voted element of Resource DEL.
Voted Resource DEL
The £35,434,000 increase in the voted element of Resource DEL arises from:
RfR1
The take-up of £84,000,000 of near-cash End year Flexibility for Higher Education Support for Students (£74,000,000) and Further Education, Skills and International Programmes (£10,000,000).
The take-up of £54,715,000 of non-cash End Year Flexibility (EYF) for Higher Education (£48,752,000), Science, Innovation and Knowledge Transfer (£5,732,000) and Further Education, Skills and International Programmes (£231,000).
The take-up of £5,917,000 of near-cash Administration costs End Year Flexibility (EYF) for Activities to Support all Functions.
The take-up from the Departmental Unallocated Provision (DUP) of £12,472,000 for Higher Education Support for Students (£8,008,000), Higher Education (£2,689,000) and Further Education, Skills and International Programmes (£1,775,000).
A transfer from the Ministry of Justice of £1,957,000 for Offender Learning.
Transfers from other Government Departments of £959,000 Administration costs for Government Skills.
A transfer from the Department for Children, Schools and Families of £450,000 for the Further Education Procurement Consortium.
Transfers from other Government Departments of £375,000 other resource for Government Skills.
A net movement to non-voted Resource DEL of £53,936,000 consisting of increased to voted Resource DEL for Further Education, Skills and International Programmes (Grants) (£20,553,000), Science, Innovation and Knowledge Transfer (£252,000), and Higher Education (non-cash) (£32,000); and decreases to Higher Education Support for Students (non-cash) (£50,395,000), Higher Education (near-cash) (£12,972,000), Further Education, Skills and International Programmes (other current) (£10,291,000), Activities to Support all Functions (£895,000), and Higher Education Support for Students (near-cash) (£220,000).
A net increase in voted receipts for the Learning and Skills Council of £56,405,000, offset by a net increase in the Learning and Skills Council non-voted Resource DEL.
An increase in voted receipts for the UK Commission for Employment and Skills of £11,819,000, offset by an increase in the UK Commission for Employment and Skills non-voted Resource DEL.
An increase in voted receipts for the Higher Education Funding Council for England of £596,000, offset by an increase in the Higher Education Funding Council for England non-voted Resource DEL.
An increase in voted receipts of £1,955,000 reflecting the movement of the UK Intellectual Property Office Dividend from non-voted to voted Resource DEL receipts.
A transfer from Administration to Programme in respect of the £959,000 transfers received from other Government Departments for Government Skills.
RfR2
A movement to non-voted Resource DEL of £700,000 from Knowledge Transfer.
Non-voted Resource DEL
The £237,857,000 increase in non-voted Resource DEL arises from:
The take-up of £87,388,000 of near-cash End Year Flexibility (EYF) for the Higher Education Funding Council for England (£30,000,000), the Natural Environment Research Council (£26,706,000), the Science and Technology Facilities Council (£17,651,000), the Engineering and Physical Sciences Research Council (£72,255,000), the Arts and Humanities Research Council (£2,595,000), the Biotechnology and Biological Sciences Research Council (£2,353,000), the Medical Research Council (£425,000) and the Economic and Social Research Council (£403,000).
The take-up from the Departmental Unallocated Provision (DUP) of £12,472,000 to voted Resource DEL for Higher Education Support for Students (£8,008,000), Higher Education (£2,689,000) and Further Education, Skills and International Programmes (£1,775,000).
A transfer from the Department for Children, Schools and Families of £6,530,000 for the UK Commission for Employment and Skills.
An increase in the Medical Research Council (MRC) non-voted non-cash Resource DEL of £31,000,000 arising from a claim on the DEL Reserve for the costs of bringing the MRC Commercial Fund into the Budgetary regime.
A net movement to non-voted Resource DEL of £53,936,000 from RfR1 voted Resource DEL consisting of increases for the Higher Education Funding Council for England (£65,019,000), the UK Commission for Employment and Skills (£6,138,000), the Student Loans Company (£1,205,000), Investors in People UK (£100,000) and the Office for Fair Access (£60,000); and decreases for the Technology Strategy Board (£12,700,000), the Learning and Skills Council (£4,834,000), the Quality Improvement Agency (£800,000) and the Design Council (£252,000).
A movement to non-voted Resource DEL of £700,000 from RfR2 voted Resource DEL for the Natural Environment Research Council
A net increase in the Learning and Skills Council non-voted Resource DEL of £56,405,000, offset by a net increase in voted receipts for the Learning and Skills Council.
An increase in the UK Commission for Employment and Skills non-voted Resource DEL of £11,819,000, offset by an increase in voted receipts for the UK Commission for Employment and Skills.
An increase in the Higher Education Funding Council for England non-voted Resource DEL of £596,000, offset by an increase in voted receipts for the Higher Education Funding Council for England.
An increase in non-voted Resource DEL of £1,955,000 reflecting the movement of the UK Intellectual Property Office Dividend to voted Resource DEL receipts.
Capital DEL
The increase in the Capital element of the DEL of £132,000,000 arises from an increase in the voted element of Capital DEL of £1,524,000 and an increase of £130,476,000 in the non-voted element of Capital DEL.
Voted Capital DEL
The £1,524,000 increase in the voted element of Capital DEL arises from:
RfR1
A movement to non-voted Capital DEL of £100,000 from Further Education, Skills and International Programmes to the UK Commission for Employment and Skills.
An increase in voted Capital DEL of £374,000 brought forward from 2010-11 as announced in the 2008 pre-Budget report for High Education support for Students.
RfR2
A movement to voted Capital DEL of £1,250,000 from non-voted Capital DEL for the Medical Research Council to the Science and Research Investment Fund.
Non-voted Capital DEL
The £130,476,000 increase in the non-voted element of Capital DEL arises from:
The take-up of £166,626,000 of Capital DEL brought forward from 2010-11 as announced in the 2008 pre-Budget report for the Learning and Skills Council (£110,000,000), the Higher Education Funding Council for England (£50,408,000), the Natural Environment Research Council (£5,000,000) and the Student Loans Company (£1,218,000).
A transfer to the Department for Business, Enterprise and Regulatory Reform of £35,000,000 as agreed in the 2007 Comprehensive Spending Review settlement.
A movement from RfR1 voted Capital DEL of £100,000 to non-voted Capital DEL for the UK Commission for Employment and Skills.
A movement to RfR2 voted Capital DEL of £1,250,000 from non-voted Capital DEL for the Medical Research Council to the Science and Research Investment Fund.
Administration Budget
RfR1
The £5,917,000 increase within the Administration Budget arises from:
The take-up of £5,917,000 of near-cash End Year Flexibility (EYF).
Transfers from other Government Departments totalling £959,000 for Government Skills.
A transfer from Administration to Programme in respect of the £959,000 transfers received from other Government Departments for Government Skills".
Douglas Alexander (Labour, Paisley and Renfrewshire South)
Subject to parliamentary approval of the necessary Supplementary Estimate, the Department for International Development's departmental expenditure limit (DEL) will be reduced by £29,787,000 from £5,736,451,000 to £5,706,664,000.
With the DEL change, the impact on resources and capital are as set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource DEL | -12,494 | -17,293 | 3,997,815 | 839,849 | 4,837,664
Of which: | | | | |
Administration budget(1) | 848 | -853 | 162,950 | — | 162,950
Near-cash in RDEL | -22,494 | -7,293 | 3,898,815 | 849,849 | 4,748,664
Capital DEL(2) | 10,000 | -10,000 | 891,000 | — | 891,000
Less Depreciation(3) | — | — | -22,000 | — | -22,000
Total | -2,494 | -27,293 | 4,866,815 | 839,849 | 5,706,664
(1) The total of 'Administration budget' and 'Near-cash in Resource DEL' figures may well be greater than total resource DEL, due to the definitions overlapping. (2) Capital DEL includes items treated as resource in Estimate and Accounts but which are treated as Capital DEL in budgets. (3) Depreciation, which forms part of the resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of these assets would lead to double counting.
The net change in the 'Resource' element of DEL arises from:
Additions:
£916,000 transferred from the Foreign and Commonwealth Office in respect of Stabilisation Aid Fund projects in Afghanistan.
Reductions
£1,650,000 transferred to the Department for Culture, Media and Sport in respect of projects connected to the London 2012 Olympics.
£300,000 transferred to the Ministry of Defence in respect of payments to locally engaged staff in Iraq.
£1,000,000 transferred to the Foreign and Commonwealth Office in respect of the Returns and Reintegration Fund.
£5,000 transferred to the Department for Innovation, Universities and Skills in respect of the Skills Strategy for Government project.
£6,716,000 transferred to the Foreign and Commonwealth Office in respect of the Conflict Prevention Pool.
£18,899,000 transferred to the Ministry of Defence in respect of the Conflict Prevention Pool.
£216,000 transferred to the Foreign and Commonwealth Office in respect of a Conflict Pool project in Ghana.
£917,000 transferred to the Ministry of Defence in respect of Stabilisation Aid Fund projects in Iraq.
£1,000,000 transferred to the Foreign and Commonwealth Office in respect of a Police Reform project in Pakistan.
There is no net change in the 'Capital' element of DEL.
James Purnell (Labour, Stalybridge and Hyde)
Subject to Parliamentary approval of the necessary Supplementary Estimate, the Department for Work and Pensions Total Departmental Expenditure Limit will increase by £175,531,000 from £7,837,785,000 to £8,013,316,000 and the administration budget will increase by £139,878,000 from £5,693,829,000 to £5,833,707,000.
Within the Departmental Expenditure Limit change, the impact on resource and capital is as set out in the following table:
£000
| Change | New Departmental Expenditure Limit
| Voted | Non-voted | Total | Voted | Non-voted | Total
Resource | 207,846 | -51,120 | 156,726 | 6,589,338 | 1,457,027 | 8,046,365
Of which: | | | | | |
Administration | 189,878 | -50,000 | 139,878 | 5,833,707 | — | 5,833,707
Near-cash | 207,527 | -50,801 | 156,726 | 6,396,664 | 1,487,824 | 7,844,488
Capital | 2,546 | 1,319 | 3,865 | 80,659 | 1,745 | 82,404
Depreciation(1) | 14,621 | 319 | 14,940 | -114,177 | -1,276 | -115,453
Total | 225,013 | -49,482 | 175,531 | 6,555,820 | 1,457,496 | 8,013,316
(1) Depreciation, which forms part of resource Departmental Expenditure Limit, is excluded from the total Departmental Expenditure Limit since the capital Departmental Expenditure Limit includes capital spending to include depreciation of those assets would lead to double counting.
Resource Departmental Expenditure Limit
The change in the resource element of the Departmental Expenditure Limit arises from:
Request for Resources 1
i. A draw down of £46,000,000 of the Department's Resource End of Year Flexibility stock to fund expenditure of the Child Maintenance Enforcement Commission.
Request for Resources 2
ii. An increase of £20,000,000 as a result of benefit savings realised by the rollout of Provider Led Pathways. An agreement with HM Treasury allows the Department to convert 50p of every £1 saved into Departmental Expenditure Limit funding.
iii. A budget transfer of £1,455,000 to the Ministry of Justice to fund increased operating costs relating to the introduction of Employment Support Allowance.
iv. A budget transfer of £220,000 to the Ministry of Justice to fund expected increases in consent orders through the courts for Child Maintenance, following repeal of section 6 of the Chid Support Act 1991.
v. A budget transfer of £330,000 to the Department for Business Enterprise and Regulatory Reform in relation to Mesothelioma compensation payments.
vi. A budget transfer of £132,000 to the Department for Children, Schools and Families relating to Joint Birth registrations.
vii. Budget transfers to the Scottish Government £114,000, the Welsh Assembly £66,000 and the Department for Children, Schools and Families £1,142,000 in relation to Child Poverty Pilots.
viii. A transfer of £4,000,000 Administration funding was made to the Government Equalities Office, in return for £4,000,000 of Programme funding, resulting in a net nil overall impact on the Departmental Expenditure Limit.
ix. A £3,500,000 reduction in Departmental Expenditure Limit to contribute to increased Annually Managed Expenditure resulting from enhancements to the Support for the Mortgage Interest scheme, announced as part of the Government's package of help for home-owners.
Request for Resources 3
x. A draw down of £55,000,000 from the Department's Modernisation Fund. As part of the Comprehensive Spending Review 2007 (CSR07), the Department was given access to a Modernisation Fund of £550,000,000 across all CSR07 years, in addition to its settlement funding.
xi. A budget transfer of £2,000,000 to the Department for Culture, Media and Sport to support the Government's free swimming initiative.
Request for Resources 5
xii. A draw down of £45,000,000 from the Department's Modernisation Fund. Refer paragraph 12. above.
xiii. A budget transfer of £315,000 to the Department for Innovation, Universities and Skills in relation to the Government Skills Programme.
Capital Departmental Expenditure Limit
The change in the capital element of the Departmental Expenditure Limit arises from:
Request for Resources 3
xiv. A budget transfer of £2,402,000 from the Northern Ireland Executive relating to the Pension Transformation Programme.
xv. A budget transfer of £1,463,000 from the Department for Children, Schools and Families in relation to the Employee Authentication Service project.
Administration costs
The movement in the Administration Cost limit arises from the changes to the Resource Departmental Expenditure Limit as noted in terms i, iii, iv, vi, viii, x, xii and xiii above, and item xvii below.
Movements in Non-Voted Resource Expenditure
The changes in non-voted resource expenditure arise from:
Request for Resources 1
xvii. A £50,000,000 reduction in non-voted resource fully offset by a £50,000,000 increase in voted resource to reflect the allocation of the Departmental Unallocated Provision to support expenditure on the Child Maintenance and Enforcement Commission.
Request for Resources 2
xviii. An increase in non-voted expenditure of £1,313,000 offset by a decrease in voted expenditure of £1,313,000 in respect of increased spend of Working Ventures (UK) Limited.
Request for Resources 3
xix. An increase in non-voted expenditure of £8,000,000 offset by a decrease in voted expenditure of £8,000,000 on respect of an increased utilisation of the Financial Assistance Scheme provision.
xx. A reduction in non-voted expenditure of £141,000 offset by an increase in voted expenditure of £141,000 in respect of decreased spend of The Pensions Advisory Service.
xxi. An increase in non-voted expenditure of £82,000 offset by a decrease in voted expenditure of £82,000 in respect of decreased spend of The Pensions Ombudsman.
xxii. A reduction in non-voted expenditure of £3,801,000 offset by an increase in voted expenditure of £3,801,000 in respect of decreased spend of The Pensions Regulator.
xxiii. A reduction in non-voted expenditure of £6,573,000 offset by an increase in voted expenditure of £6,573,000 in respect of decreased spend of the Personal Accounts Delivery Authority.
Movements in Non-Voted Capital Expenditure
The changes in non-voted capital relate to the following adjustments:
Request for Resources 3
xxiv. An increase in non-voted expenditure of £448,000 offset by a decrease in voted expenditure of £448,000 in respect of increased spend of The Pensions Regulator.
xxv. An increase in non-voted expenditure of £871,000 offset by a decrease in voted expenditure of £871,000 in respect of increased spend of the Personal Accounts Delivery Authority.
Gareth Thomas (Labour, Harrow West)
My nobel Friend Lord Davies of Abersoch, the Minister of State for Trade and Investment has made the following statement:
Subject to parliamentary approval of any necessary supplementary estimate, UKTI's total DEL will be decreased by £199,000 from £91,506,000 to £91,307,000. This reflects the net transfer of £200,000 in Voted capital from UKTI's Vote to BERR's Vote. Within the total DEL change, the impact on resources and capital is set out in the following table:
| Change | New DEL | £'000
| Voted | Non-voted | Voted | Non-voted | Total
Resources DEL | 1 | - | 91,506 | - | 91,506
Of which: | | | | |
Near-cash in RDEL | 1 | - | 91,419 | - | 91,419
Capital DEL(1) | -200 | - | 48 | - | 48
Less Depreciation(2) | - | - | -166 | - | -166
Total DEL | -199 | - | 91,388 | ™ | 91,388
(1)Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (2)Depreciation, which forms part of resource DEL, is excluded from total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
UKTI's vote does not include Administration provision, which is included in the Estimates of our parent departments, BERR and FCO.
The change in the resource element of DEL arises from:
A token increase of £1,000 to allow an increase in appropriations-in-aid to be included in the estimate.
The change in the capital element of DEL arises from:
A transfer of capital underspend of £200,000 to BERR to fund capital works to UKTI accommodation.
Angela Eagle (Labour, Wallasey)
Subject to Parliamentary approval of the spring supplementary estimate, HM Treasury's resource DEL will be increased by £73,000 from £221,551,000 to £221,624,000 and the Administration budget will be increased by £118,000 from £169,425,000 to £169,543,000 with no net change in the capital DEL. The impact on resources and the administration budget is set out in the following table:
| Change | New DEL
| Voted | Non- voted | Voted | Non-voted | Total
Resource | 6,386,000 | -6,313,000 | 201,032,000 | 20,592,000 | 221,624,000
of which: | | | | |
Administration budget* | 4,431,000 | -4,313,000 | 169,543,000 | - | 169,543,000
Near cash in RDEL* | 6,373,000 | -6,313,000 | 189,197,000 | 31,492,000 | 220,689,000
Capital** | 700 | -700 | 5,500,000 | 1,521,000 | 7,021,000
Less: Depreciation*** | - | - | -9,190,000 | - | -9,190,000
Total | 7,086,000 | -7,013,000 | 197,342,000 | 22,113,000 | 219,455,000
*The total of 'Administration budget' and 'Near cash in Resource DEL' figures may well be greater than total Resource DEL, due to definitions overlapping. ** Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. *** Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The net increase in resource DEL of £73,000 is the net effect of the following:
A transfer to the Department for Innovation, Universities and Skills of £17,000 administration costs as a contribution towards the costs of the Skills Strategy.
Transfers from the Departments of Health and Culture, Media and Sport of £45,000 near cash administration costs each to the Office of Government Commerce towards the costs of the Centre of Expertise in Sustainable Procurement.
The net increase in the administration costs budget is £118,000 comprising the administration costs changes mentioned in the preceding paragraphs, plus the reclassification of a programme costs transfer from the UK Statistics Authority received in the winter Supplementary Estimates round to administration costs of £45,000.
There is a reduction in non-voted Resource DEL due to the draw down of Departmental Unallocated Provision (DUP) comprising £4,313,000 administration costs and £2,000,000 programme costs to offset increased voted spending. There is also a reduction in non-voted capital DEL due to the draw down of DUP of £700,000.
Ed Miliband (Labour, Doncaster North)
Subject to Parliamentary approval of the New Estimate, the total Departmental Expenditure Limit (DEL) budget for the Department of Energy and Climate Change will be £2,790,657,000 and the Administration budget will be £98,320,000.
| | | £'000
| Voted | Non-voted | Total
Resource DEL | -844,531 | 1,933,534 | 1,089,003
of which: | | |
Administration budget(*) | 98,320 | 0 | 98,320
Near-cash in RDEL (*) | -949,315 | 1,981,286 | 1,031,971
Capital DEL(**) | 513,230 | 1,195,401 | 1,708,631
Less Depreciation (***) | -3,105 | -3,872 | -6,977
Total DEL | -334,406 | 3,125,063 | 2,790,657
(*)The total of 'Administration budget' and 'Near cash in Resource DEL' figures may well be greater than total Resource DEL, due to definitions overlapping. (** )Capital DEL includes items treated as resource in Estimates and accounts but which are treated as Capital DEL in budgets. (*** )Depreciation, which forms part of Resource DEL, is excluded from the total DEL since Capital DEL includes capital spending and to include depreciation of those assets would lead to double counting.
The resource element of the DEL arises from:
i) A Machinery of Government transfer from the Department for Business, Enterprise and Regulatory Reform of a net negative £963,013,000 voted near-cash, £1,711,504,000 of non-voted near-cash, a net negative £2,980,000 voted non-cash and a net negative £47,752,000 of non-voted non-cash in respect of Supporting affordable, secure and sustainable energy and managing historic energy liabilities effectively and responsibly;
ii) A Machinery of Government transfer from the Department for Environment, Food and Rural Affairs of £152,512,000 voted near-cash and £34,000,000 of non-voted near-cash in respect of bringing about a low-carbon Britain, Developing an international agreement on climate change and Promoting low carbon technologies in developing countries;
iii) a reduction in non-voted expenditure of £27,000,000 and a reduction in voted income of £28,932,000 relating to reclassification of entities within the Nuclear Decommissioning Authority;
iv) an increase in non-voted expenditure of £296,782,000 and an increase in voted income of £296,782,000 due to updated income and expenditure forecasts for the Nuclear Decommissioning Authority;
v) a Reserve claim of £54,100,000 non-cash in respect of an increase in provision for the Concessionary Fuel Scheme;
vi) utilisation of End Year Flexibility of £50,300,000 non-cash in respect of an increase in provision for the Concessionary Fuel Scheme;
vii) a transfer of £80,000 from the Department for Business, Enterprise and Regulatory Reform in respect of compensation for mesothelioma sufferers; and
viii) an increase in voted near-cash expenditure and a decrease in non-voted near-cash expenditure of £34,000,000 with respect to take up of Departmental Unallocated Provision for the Warm Front programme.
Also within the resource DEL, the Administration budget arises from:
ix) A Machinery of Government transfer from the Department for Business, Enterprise and Regulatory Reform of £52,471,000 near-cash and £3,000 of non-cash in respect of Professional support and infrastructure; and
i) a Machinery of Government transfer from the Department for Environment Food and Rural Affairs of £42,485,000 near-cash and £3,361,000 of non-cash in respect of Professional support and infrastructure.
The change in the Capital element of the DEL arises from:
i) A Machinery of Government transfer from the Department for Business, Enterprise and Regulatory Reform of a net negative £7,582,000 voted and £1,248,183,000 non-voted in respect of Supporting affordable, secure and sustainable energy and managing historic energy liabilities effectively and responsibly;
ii) A Machinery of Government transfer from the Department for Environment Food and Rural Affairs of £402,030,000 voted and £16,000,000 non-voted in respect of bringing about a low-carbon Britain, Developing an international agreement on climate change and Promoting low carbon technologies in developing countries;
iii) A 2008 Pre Budget Report award of £50,000,000 in respect of bringing about a low-carbon Britain;
iv) a reduction in voted income of £52,782,000 and a reduction in non-voted expenditure of £52,782,000 due to updated income and expenditure forecasts for the Nuclear Decommissioning Authority; and
v) an increase in voted expenditure and a decrease in non-voted expenditure of £16,000,000 with respect to take up of Departmental Unallocated Provision for the Warm Front programme.
Geoff Hoon (Labour, Ashfield)
Subject to Parliamentary approval of any necessary supplementary estimate, the Department for Transport departmental expenditure limit (DEL) for 2008-09 will be decreased by £11,270,000 from £13,239,009 to £13,227,739,000 and the administration budget will be increased by £11,200,000 from £281,926,000 to £293,126,000.
Within the DEL change, the impact on resources and capital, are set out in the following table:
£000
| Change | New DEL |
| Voted | Non-voted | Voted | Non-voted | Total
Resource | 113,222 | 360,641 | 6,043,726 | 786,274 | 6,830,000
of which: | | | | |
Administration budget | 11,250 | -50 | 293,126 | — | 293,126
Near-cash in RDEL | -343,196 | 358,141 | 5,105,243 | 979,839 | 6,085,082
Capital | 227,060 | -227,060 | 6,360,478 | 922,751 | 7,283,229
Depreciation(1) | -485,133 | - | -852,898 | -32,592 | -885,490
Total | -144,851 | 133,581 | 11,551,306 | 1,676,433 | 13,227,739
(1 )Depreciation, which forms part of resource DEL, is excluded from the total DEL, since capital DEL includes capital spending and to include depreciation of those assets would lead to double counting
Resource change: Administration (total increase of £11,200,000)
Voted: total increase of £11,250,000
RfR1
(i) Take up of £11,200,000 near cash end year flexibility for administration pressures (£8,045,000)
(ii) £50,000 near cash transfer from non voted for administration pressures
(iii) Within the Administration Budget £3,800,000 of non-cash headroom has been converted to near cash, permitted under Treasury guidelines, to meet pressures in estates and aviation
Non Voted: total decrease of £50,000
Transfer of £50,000 to administration near cash voted provision.
Resource change: Programme (total increase of £462,663,000)
Voted: total increase of £101,972,000
RfR1
(i) Treasury agreed increase of £462,718,000(*)( )non cash to reflect the accounting treatment of changes in fair values arising from the implementation of accounting standards FRS 25 and FRS 26 for: London and Continental railways (£300,000,000); Network Rail's Debt Issuance Programme (£164,886,000); and the Air Travel Trust Fund (£-2,168,000); partially offset by the £462,718,000 is included in the £485,133,000 depreciation increase for the Spring Supplementary Estimate which also includes an increase of £26,215,000 for the Highways Agency partially offset by a decrease of £3,800,000 for central administration.
(ii) A net transfer of £360,691,000 to non voted provision as follows:
a. £369,383,000 near cash headroom from rail: for the net operating losses of London and Continental railways (£252,000,000); to the departmental unallocated provision in respect of programme slippage into 2009-10 (£104,928,000); and to cover a shortfall in Driver and Vehicle Licensing Agency receipts (£12,455,000);
b. £4,045,000 near cash headroom from cleaner fuels and vehicles to cover a shortfall in driver and vehicle Licensing Agency receipts:
c.£500,000 near cash from other transport grants transferred to railways to allow payments to both the Rail Passenger Council and the Bus Passenger council to be administered more efficiently;
d. £2,500,000 non cash to reflect the write back of Voluntary Early retirement provision; partially offset by
e. £15,737,000 near cash use of Consolidated Fund Extra Receipts within the Departmental Expenditure Limit by the Highways Agency.
(iii) A transfer of £55,000 near cash to the Department for Innovation Universities and Skills for Government skills
Non-Voted: total net increases of £360,691,000
(i) £360,691,000 transferred from voted provision of which £358,191,000 is near cash and £2,500,000 non cash.
Capital Change: (no net change)
Voted: total increase of £227,060,000 RfR1
(i) A net transfer of £227,060,000 from non voted provision as follows:
a. a transfer from departmental unallocated provision to Network Rail capital grants (£258,060,000); partially offset by
b. a transfer of £5,100,000 from headroom on other transport grants (£3,100,000) and aviation services, transport security and royal travel (£2,000,000) to the shared services transformation project; and
c. a transfer of £25,900,000 2012 Olympics underspend to the departmental unallocated provision for use on this programme in future years.
Non-voted: total decrease of £227,060,000
(i) A net transfer of £227,060,000 to voted provision.