Armed Forces: RAF Nimrod XV230
House of Lords, 4 December 2007.
Baroness Taylor of Bolton (Labour)
My right honourable friend the Secretary of State for Defence (Des Browne) has made the following Written Ministerial Statement.
In addition to my oral Statement to the House today, I am taking this opportunity to provide the House with further details of the findings of the Royal Air Force board of inquiry into the tragic crash of the RAF Nimrod XV230.
On 2 September 2006, Nimrod XV230 took off from its deployed operating base at 0913 GMT, en route to southern Afghanistan. It was on an essential operational flight in support of coalition forces. At 1111:33, approximately 90 seconds after receiving 22,000 lbs of fuel from a Tristar tanker, the crew experienced almost simultaneous bomb bay fire and elevator bay smoke warnings. Smoke was observed in the cabin coming from both the elevator and aileron bays. Shortly afterwards, the aircraft depressurised. The crew commenced emergency drills immediately and at 1114:10 transmitted a MAYDAY alert and turned to head for Kandahar airfield. At 1116:54, the aircraft was observed by a Harrier GR7 pilot, apparently in a controlled descent, with flames emitting from the starboard wing root and starboard aft fuselage. Members of a Canadian army unit also observed the aircraft as it passed to the south of their position. At 1117:39, the Harrier GR7 pilot reported that the aircraft had exploded and he observed wreckage striking the ground. The crash site was approximately 14 nautical miles west of Kandahar airfield, some 400 metres north-west of the village of Farhellah.
A combat search and rescue team deployed to the crash site at 1207 and confirmed that there were no survivors. At 1257, the Canadian unit which had observed the aircraft's final descent arrived and secured the crash site. At 1430, they were reinforced by a 22-man patrol from 34 Squadron RAF Regiment. The crash site lay in a depression, surrounded by higher ground containing housing and, as such, was not easy to defend. The crew's bodies, personal effects and classified items were recovered as a priority.
The following morning the Canadian unit was withdrawn to support other coalition forces engaged in fighting with the Taliban, at which point several hundred locals began to enter the site. The security situation began to deteriorate rapidly and at 0910 the RAF Regiment patrol was withdrawn by air. The majority of the wreckage was removed within a short period of time, probably by local nationals.
A board of inquiry (BOI) was convened to investigate the crash with an experienced ex-Nimrod wing commander nominated as its president, supported by two squadron leaders from the Nimrod Force Headquarters at RAF Kinloss. The board members were not able to visit the crash site due to the security situation in the area and had to rely on evidence collected by the units who initially secured the crash site and interviews with key witnesses. Crucially, the accident data recorder and a badly damaged section of the mission tape (containing crew intercom recordings and position information) were recovered. This allowed the inquiry team to reconstruct as far as possible the events leading up to the crash.
The board, using a combination of evidence collected in theatre and expert analysis, concluded that, as air-to-air refuelling drew to a close, fuel escaped. This was either as a result of the action of a pressure-relief device in the main fuel tank, leading to an overflow of fuel during air-to-air refuelling, or from a leak in a fuel coupling within the fuel system. This fuel moved rearwards, either internally or along the outside of the fuselage. It was then ignited following contact with an element of the aircraft's hot air system. The fuel probably gained access to the pipe at a gap between two types of insulation. The subsequent fire penetrated the pressure hull, causing the aircraft to depressurise and probably began to weaken the starboard wing. The aircraft's hydraulic systems probably failed in the latter stages of the incident as a result of the fire and the flying controls were probably similarly affected.
After about five minutes, the fuel in the tank located at the base of the starboard wing, having been subjected to intense heat, began to boil. The tank began to breach and eventually ruptured, provoking a boiling liquid, expanding vapour explosion (BLEVE). At a height of about 1,000 feet above ground level, the weakened aircraft began to break apart into four large parts, which struck the ground. The board was unable to determine whether the BLEVE provoked the aircraft's break-up, or whether the BLEVE was a result of the aircraft's break-up.
The board of inquiry found that the crew were all on duty and were properly trained, qualified and authorised. They had arrived at their deployed operating base on 21 August and had flown three sorties since their arrival, the last being on 27 August. The crew were all medically fit and considered to have been adequately rested prior to the sortie. The aircraft had not exhibited any significant faults while in theatre.
The board found no evidence that the maintenance or servicing conducted on the aircraft was a cause or contributory factor in the loss of XV230. It also concluded that, while the continued commitment to long-term operations places pressure on the Nimrod force, there was no evidence of that this was a cause or factor in the loss of the aircraft.
Following the crash, and in conjunction with the board of inquiry's investigations, a number of measures have been taken to ensure the continued safe operation of the aircraft. Additional maintenance and safety checks have been carried out on all of the Nimrod MR2 and R1 aircraft. Action has been taken to deactivate possible sources of ignition and an enhanced inspection regime put in place to examine for signs of fuel leakage. We will be reviewing the Nimrod safety case and conducting an ageing aircraft audit of the aircraft's systems.
We have continued to adapt our Nimrod force maintenance and operating procedures in response to the emerging findings of the board of inquiry and the lessons identified from ongoing operations in the Middle East and the United Kingdom, just as we would for any other aircraft.
The Chief of the Air Staff's professional judgment is that, taking all these measures into account, the Nimrod aircraft fleet remains safe to fly. I have accepted his assurance on this and his opinion that all necessary safety measures have been implemented.
The board of inquiry made 33 recommendations in total, relating to maintenance policy, the fuel and hot air systems, air-to-air refuelling, operational issues, aircraft modifications, post-crash management, engineering and personnel. Twenty-one of these recommendations have been accepted outright by the chain of command. Eight of the recommendations are actively being considered. One recommendation (Recommendation 5, to determine a specific life for fuel seals) has not proved possible to implement but mitigating action has been taken. One recommendation (Recommendation 17, to investigate the utility of parachute escape on Nimrod aircraft) has not been taken forward as it is not considered feasible. One recommendation (Recommendation 20, to review the design of No. l fuel tank) has not been taken forward but the issue it sought to solve has been addressed by other means. One recommendation (Recommendation 28, to increase the RAF's stocks of BOI kits) has not been taken forward because BOI kits could be made available from Royal Navy and Army holdings.
The detailed recommendations of the BOI and the chain of command's response to them, are as follows:
1. The Nimrod maintenance policy is reviewed to ensure that maintenance procedures reflect the increasing age of the aircraft.
This recommendation has been accepted.
2. The Nimrod ageing aircraft audit is reviewed to include aircraft systems.
This recommendation has been accepted.
3. The Nimrod safety case is reviewed, reassessing the factual data used for interpretation and categorization of hazard and risk.
This recommendation has been accepted.
4. A safety review of the Nimrod fuel and hot air systems is completed.
This recommendation has been accepted.
5. A life for the FRS Series 1 fuel seal be determined, based on the designer's recommendation that fitted seals are replaced after 25 years.
The recommendation that fuel seals be given a specific life has not been accepted because experts advise the life of seals will vary considerably, according to the conditions of their installation in the aircraft. Further studies have yet to identify any predictable ageing mechanism and it has therefore been impossible to define a common finite life for the approximately 400 fuel seals fitted to the Nimrod aircraft. Experience shows that replacing fuel seals may actually introduce more problems than it solves.
6. A maximum installed life for fuel seals of other material types is determined.
This recommendation is under consideration. A review is being conducted to determine whether the regulations for the lifing of seals are adequate.
7. A one-off inspection of the integrity of each Nimrod's fuel system, between Ribs 3 starboard and port, be conducted with access panels removed and the system pressurised.
This recommendation has been accepted.
8. An inspection regime for fuel seals be initiated as recommended by Eaton Aerospace.
This recommendation has been accepted. A comprehensive inspection of fuel couplings is also under way.
9. A procedure is developed to pressure test the fuel vent system at the fuselage to wing interface.
This recommendation has been accepted.
10. Detailed instructions for the correct fitting and locking of FRS couplings and seals be incorporated formally within the Nimrod AMM and publicised widely.
This recommendation has been accepted.
11. Hot Air System. Existing limitations, prohibiting the use of the supplementary conditioning pack (SCP) and of the cross-feed pipe in the air be continued.
This recommendation has been accepted.
12. Nimrod air-to-air refuelling (AAR) procedures are reviewed in the light of the board's report, to establish appropriate levels and rates of refuel, which will prevent overspill of fuel from tanks.
This recommendation has been accepted.
13. A study be initiated to determine the cause of pressure surges during air-to-air refuelling and their long-term effect on aircraft fuel systems.
The feasibility of the recommendation is being examined and a technical proposal on how this could be implemented has been requested.
14. A statement specifying that the maximum normal operating pressure of 50 psi during air-to-air refuelling be reintroduced into the Nimrod aircrew manual.
The recommendation has been accepted.
15. Air-to-air refuelling refuel rates in the dynamic simulator are changed to reflect actual refuel rates to provide more realistic training.
This recommendation is under consideration.
16. Existing limitations, prohibiting the use of the No. 7 fuel tanks, introduced following the loss of XV230, be discontinued.
This recommendation has been accepted.
17. A study be undertaken into the utility of parachute escape on the Nimrod MR2.
This recommendation has not been taken forward. The Nimrod has no airborne escape system as it was not designed for the deployment of parachutes. It is highly likely that any attempt to abandon the aircraft from the front or rear exit would result in either being pulled into the engine or hitting the tail of the aircraft.
18. Nimrod STANEVAL (standard evaluation team) consider the lessons identified at Annex P (description of crew actions during the emergency) and their potential impact on crew emergency procedures.
This recommendation has been accepted.
19. The port rear emergency oxygen bottle is relocated to a more central position, or another oxygen bottle is provided in this position.
The feasibility of the recommendation is being examined and a technical proposal on how this could be implemented has been requested.
20. The design of No. 1 fuel tank is reviewed to reduce the effect of asymmetric filling.
It is not currently intended to review the design of the No. 1 fuel tank as this problem has been resolved by only refuelling the No. 1 tank to a level well below that which could initiate the safety valve.
21. The outlet pipes for fuselage fuel tank blow-off valves be modified to ensure that blown-off fuel cannot run down the exterior of the fuselage.
The feasibility of the recommendation is being examined and a technical proposal on how this could be implemented has been requested.
22. The connections of the No. 1 tank vent pipes be modified to reduce the risk of fuel leakage.
The feasibility of the recommendation is being examined and a technical proposal on how this could be implemented has been requested.
23. The drainage of the lower panel in the No. 7 tank dry bay be improved to prevent any accumulation of fuel.
The feasibility of the recommendation is being examined and a technical proposal on how this could be implemented has been requested. In the mean time the likelihood of a hazard arising from fuel pooling in this area has been significantly reduced by suspending the use of the supplementary conditioning pack and cross-feed pipe system and introducing the enhanced inspection regime.
24. A crash-protected means of recording aircraft position and intercom voice is introduced to the Nimrod.
This recommendation is under consideration.
25. The Defence Aviation Safety Centre (DASC) should investigate the provision of details of type-specific emergency equipment (ADR, etc) and key internal components (for example the ADR tape unit and housing) on their website to enable Post-Crash MoD Incident Officer (PCMIO) to provide guidance to search teams.
This recommendation has been accepted.
26. Instructions for PCMIO are revised to provide guidance when attending crash sites that are likely to become inaccessible.
This recommendation has been accepted.
27. Instructions for PCMIO at crash sites which are likely to become inaccessible should include advice to make every effort to ensure the widest possible photographic coverage of the crash site, at the highest possible resolution. This should take priority over all other tasks for any photographic team.
This recommendation has been accepted.
28. DASC should increase their current stock of post-crash BOI kits.
This recommendation has not been accepted. We currently hold four post-crash BOI kits. In the unlikely circumstance that a fifth BOI post-crash kit is required the RAF could borrow a kit from one of the other services.
29. Body bag fluidproof liners should be stored within the outer ruggedised bags in crash kits to ensure that they always arrive on scene together.
This recommendation has been accepted.
30. The Nimrod MOD Form 700 Sections 2 and 3 (F703/F704) should be copied and retained before the document is carried on the aircraft.
This recommendation has been accepted.
31. The use of non-approved mission system panel blanks be discontinued.
This recommendation has been accepted.
32. Consideration be given to reinstating the SO1 (Wg Cdr) engineering post in Forward at RAF Kinloss to provide senior oversight of station engineering matters.
This recommendation has been accepted.
33. A review of engineering training is undertaken to identify those areas which, while relevant to Nimrod capability, are not encompassed within existing formal training courses.
This recommendation has been accepted.