Rail Services (Devon)
Westminster Hall, 27 June 2007.
Richard Younger-Ross (Liberal Democrat, Teignbridge)
In the short time available, I hope to touch on a couple of issues relating to health and safety concerns about the rail service provided in my constituency. Time permitting, I shall then talk about some general issues and concerns about the future of rail services for those who commute to, travel to or holiday in what has always been known as glorious Devon. It is known as that because 1930s British Rail advertisements for services to the west country were emblazoned with words urging people to travel to "glorious Devon".
My particular concerns relate to two stations in my constituency, Starcross and Dawlish Warren. It could fairly be said that the issues that I am raising with the Minister are for Network Rail to resolve, but they have been raised with the company for a number of years. We may be making progress on some of those issues—on others, we may not. I am hoping that, because of his influence with Network Rail, the Minister can say that health and safety concerns should be paramount and that disabled access and the ability to get on to trains are a concern to him as a Minister.
Starcross is a small station on the banks of the River Exe overlooking east Devon. It even has a connecting ferry service across the river. The station platform is straight until it bends in its latter half. The station had served its local community without problem for a number of years. In an effort to shorten travel times and improve the service, the rails were banked through the curved section of the platform to allow the trains to travel faster. The trains subsequently stopped on a banked curve.
The result was twofold. A gap was opened up between the platform and the train and because of the tipping motion and how they are banked, the trains sit higher above the platform than they used to. As a consequence, there is a large gap that makes it difficult for anybody with walking difficulties to get into or off trains. Anyone with a severe such handicap would probably avoid using Starcross as a station if they could. Constituents tell me that because of the difficulties on the platform, they prefer to use the bus service or their cars to travel into Exeter or down the line towards Dawlish or Teignmouth.
The resolution to the problem is straightforward. Most of the trains that stop—99 per cent. of them—are at most only four carriages long. The platform is designed for trains of eight or 10 carriages, so all Network Rail has to do is stop the trains halfway down the platform. Ian Coucher kindly visited my constituency and we considered a number of issues together. He accepted my point and said 18 months to two years ago that the company would consider the problem. However, it has still not come back to me, and that is why I bring it to the Minister's attention today.
The platform does not need to be raised, as was originally proposed; the halt sign needs to be put halfway down, and a shelter and some lighting need to be moved—that is all that is required. I would have thought that, given the effect on those using the service, such changes would be small change. There would be a difficulty in respect of the occasional high-speed train that stops at Starcross, but that could probably be accepted by people with a disability; they could get used to using only one end of the platform.
I ask the Minister to ask Network Rail about that station and others with difficulties of access and safety which colleagues in the House have raised with me. The safety aspect is that small children, dogs or others could fall into the gap between the train and platform. Some pets already have.
The next station down the line is another small halt at Dawlish Warren, where, I am pleased to say, some changes have been made—trains stop closer to the shelter, making things slightly more convenient for passengers. However, there is a different safety issue at the station. The Dawlish Warren area includes a bird sanctuary, a popular bathing beach, an amusement arcade and other facilities that local tourists like to visit. All that is accessed via a small tunnel, through which ambulances and fire engines cannot go to service the other side. However, there is a crossing, to which Network Rail and its predecessor have refused emergency vehicles access. The company's argument is that it is a health and safety issue and that it would be dangerous to allow such vehicles to use the gate. However, I argue strongly that if anyone is fit to judge health and safety risks and whether to use a crossing, it is the emergency services. I am fairly certain that a way could be found for that gate to be used by them; it could be pulled back to allow them to access the Dawlish Warren area.
The current situation is not without risk. I say that for two reasons, one of which is personal. Sadly, a good friend of mine, Councillor Bill Buckle, had a heart attack and died while walking on the warren. The ambulance had to stop on one side and its crew had to leg it nearly half a mile across the sand dunes to Bill, who was dying. Vital minutes could have been saved if the gate had been accessible. It is unlikely that the buildings destroyed by two fires on the warren would have been saved by the fire crews getting there that much quicker, because of the nature of the fires, how quickly they spread and the fact that the buildings were structured with timber. However, the fact that there have been two major fires there highlights the need to allow full appliances to gain access to the warren.
I have corresponded with Network Rail on the issue and it is totally intransigent about it. When the Minister has opportunities to discuss funding with Network Rail, will he ask about its health and safety record on such matters and what health and safety improvements it thinks need to be made? Is there any chance of the Minister asking the company, or even insisting, that it give greater priority to such health and safety concerns?
Not all the concerns are easily reconciled. There are concerns about the walk along the sea wall between Teignmouth and Dawlish. Sadly, there is not an easy solution to some concerns and some compromises have to be made. We have to accept that; I am not saying that the world should be wrapped in cotton wool in such instances. However, in the two cases that I have outlined, there are clear examples of how things could be done.
I mentioned the sea wall. The last time I was fortunate enough to secure an Adjournment debate in this Chamber, we discussed the sea wall at great length. For the record, I should say that there has been progress on the issue. Network Rail has indicated that it believes that maintaining the line along the sea wall—the one through Dawlish and through to Teignmouth—is the best option. The line featured spectacularly on the BBC's "Coast" programme three weeks ago. Sadly, I did not get to see it and I have not been able to see a recording, but the waves crash over the line. Network Rail believes that the line can and should be maintained as the best link to the west of the county and Cornwall, and for those areas it is essential that the line remains open. I am glad of the company's continued investment in and commitment to that service. However, there are risks from weather change, as we have seen from the horrendous storms that have affected some northern parts of the country this week. No matter what pre-planning is done, services will be always put out of action for a period by such storms.
On that point, it is always better to have two options to access a destination than just one. I am not seeking a firm commitment now, but I ask the Minister to consider representations that might be made to him by the regional development agency and by others to consider the cost of reopening the old line from Okehampton to Plymouth. That would provide relief in the event of problems with the other line, and the same would be true in reverse in the event that there were problems with the small commuter service, because the coastal alternative could substitute.
Let me say something else about relief. One of the Bills that has been making its way through the House is the Crossrail Bill, although, from the faces of the hon. Members who emerge from the Committee sittings, it appears that progress on it is slow. I make no comment on the benefits or otherwise of the Bill, because Crossrail is not a matter on which I have particularly strong views. However, my constituents are concerned about the impact of Crossrail on their ability to get in and out of London.
Again, I do not press for firm commitments one way or the other. However, will the Minister consider what could be done to alleviate the potential problems that might exist, in particular during the construction phase? Two thoughts come to mind, both of which revolve around the capacity of Waterloo and whether it can be improved. First, some alleviation could be achieved from improvements to the Exeter to Waterloo line, which are in any case much needed for the benefit of the service to the west country and Devon. Secondly, if First Great Western maintains its service to Reading, why cannot feasibility studies be undertaken to consider improving the line from Reading to Waterloo? There is already such a service, but it is one that could perhaps be made even better.
I hope that the Minister will respond positively to the matters that I have raised.
Tom Harris (Labour, Glasgow South)
I congratulate the hon. Gentleman on securing the debate and on getting to the Chamber on time following his endeavours in the Westminster boat race. I am delighted that he did not fall in.
The hon. Gentleman raised some important issues and I shall address some specific ones before moving on to some more general comments. I understand that there might shortly be a Division, so I shall try to keep my comments brief. He is understandably concerned about health and safety in stations in his constituency—particularly at Starcross. He prefaced his own comments by correctly pointing out that that matter is one more for Network Rail than for the Department for Transport. However, I shall be happy to make representations on his concerns to Network Rail at my next regular meeting with the chief executive designate, Ian Coucher.
As the hon. Gentleman said, health and safety matters are normally dealt with by Network Rail, by the train operating companies—in this case, First Great Western, or occasionally by the Office of Rail Regulation, which is the industry safety regulator. However, he has made his case extremely well, and I should be more than happy again to raise the matters that he has mentioned with Network Rail. I say that particularly in light of the fact that the hon. Gentleman invited Ian Coucher to his constituency 18 months to two years ago, yet still nothing seems to have materialised.
The hon. Gentleman takes a pragmatic and realistic view of what can and cannot be achieved on the budgets that are available to the railways. The Department for Transport subscribes to the so-called low-hanging fruit theory, which is the theory that it is often better value for money to spend fairly modest sums to achieve modest change to infrastructure, because that can result in disproportionate benefit to passengers. I know that he subscribes to that theory too, so I am more than happy to encourage Network Rail to pursue that course and find out whether the stop sign on the platform can be changed so that people can enter and leave trains more easily.
The hon. Gentleman mentioned the lack of emergency access at Dawlish Warren. I extend my sympathy for the loss of his friend—I am unhappy to hear of any such incidents. Again, the matter is one for Network Rail and perhaps for the ORR.
Tom Harris (Labour, Glasgow South)
The hon. Gentleman also raised concerns about the Dawlish sea wall. I am aware of concerns that the main line between Exeter and Plymouth, which runs along the sea wall in the Dawlish area, is, as he said, vulnerable to storms and flooding. Some have been pressing for the reinstatement of an inland route to allow services to avoid the Dawlish area in the longer term, but that is a matter for Network Rail rather than for my Department. I apologise to the hon. Gentleman if that sounds like a recitation of buck-passing. Network Rail continues to monitor the likelihood of risks to the safety and operational integrity of the railway in the Dawlish area.
The hon. Gentleman referred specifically to the reopening of the Okehampton to Plymouth line. There is a well established process in the Department whereby, provided that the initiative for the opening of a line comes from local stakeholders such as local authorities or business interests, that they work with Network Rail and that they provide a robust business case including an explanation of where the finance will come from, the Department should and will look sympathetically upon it. He would not expect me to undertake today to reopen the line.
If the hon. Gentleman has raised any issues that I cannot respond to directly, I shall be more than happy to write to him. More generally, I can say that after a number of difficult years Britain's railways are a success story. Performance has improved and Network Rail and the train operators have a renewed focus on punctuality. The franchise system is delivering; more than 1 billion passenger journeys were made last year, 40 per cent. more than 10 years ago, and we have the fastest-growing network in Europe, with that strong growth expected to continue.
The hon. Gentleman will have heard me say on a number of occasions that in the current control period we are spending £88 million a week on the network. Network Rail has embarked on a nationwide infrastructure renewal programme worth more than £2 billion a year. We are basically running to catch up on the decades of under-investment in our railways by previous Governments of both colours.
Increased investment in such initiatives as integrated control centres has improved punctuality to pre-Hatfield levels. In the past 12 months, more than 88 per cent. of trains have run on time, as measured by the industry-standard public performance measure. Further improvements are targeted for March 2008. The rail industry has committed to achieve 89.4 per cent. on the public performance measure by then and 90 per cent. a year later.
The hon. Gentleman's constituency is served by First Great Western. I have said on a number of occasions, and first in this Chamber, that it is not my role to defend First Great Western—I am not the Minister for FGW. I am determined that appropriate action will be taken to ensure that its performance improves substantially. There is evidence that the worst of the problems experienced at the beginning of this year have abated to an extent, but the situation remains poor. I shall continue to look for further improvements to match those elsewhere in the rail industry.
First Great Western, Network Rail and other train operators in the area, including freight train companies, have an important part to play in improving performance. Under its existing franchise, First Great Western is contractually committed to spending substantial sums on improving the reliability of its whole train fleet. Following problems earlier this year, it has also published in conjunction with Network Rail a recovery programme comprising 40 additional action points.
As the hon. Gentleman will know, the First Great Western franchise is not just about long-distance services. Its local services in the west of England are an important part of it and serve the needs of commuters, tourists and other passengers travelling to towns, villages and cities in the area, including key regional centres such as Bristol, Exeter and Plymouth. They also provide connections to longer-distance services to London and other parts of Britain. I confirm that the new franchise also commits the company to a series of reliability modifications to all the trains used on the west of England services. Their passenger accommodation and exteriors will also be refreshed.
Network Rail is carrying out a lot of work to improve performance in the area. It is renewing and improving its infrastructure across the whole area in which First Great Western operates train services, including on lines in the hon. Gentleman's constituency. That covers track, signalling systems and civil engineering structures such as bridges and embankments. It is perhaps in that context that I shall raise the issues that he has raised today. I meet Network Rail regularly to discuss performance across the network.
I do not wish to embark on a more general discourse on the state of the railways that might not be entirely relevant to the hon. Gentleman's concerns, so I shall end with a commitment to raise with Network Rail the matters that he has mentioned in a bid to speed up the work that, understandably and correctly for a constituency MP, he wishes to be done in his constituency.
Question put and agreed to.
Adjourned accordingly at twenty-four minutes to Six o'clock.