Highways Agency: Correction to Written Answers
House of Lords, 28 March 2007.
Lord Bassam of Brighton (Labour)
My honourable friend the Minister of State for Transport (Stephen Ladyman) has made the following Ministerial Statement.
My Answer to Parliamentary Questions UIN 126098 (Official Report, 9 March 2007, cols. 2262-4W) regarding traffic volumes for each concrete section of the national trunk road network and UIN 126096 (Official Report, 12 March 2007, cols. 20-2W) regarding the proportion of the concreted trunk road network which has had quieter surfacing installed since July 2005, contained several inaccuracies.
The Answer to the Parliamentary Questions should have read:
The table below gives the annual average daily traffic (AADT) data for each concrete surfaced section of the all purpose national trunk road network for 2005.
Route | Annual Average Daily Traffic (AADT)
A5 Knowl Hill, Milton Keynes | 35,699
A11 Barton Mills Bypass, Suffolk | 38,100
A11 Wymondham Bypass, Norfolk | 35,400
A11 Wymondham to A47 Thickthorn, Norfolk | 35,400
A12 Chelmsford Bypass, Essex | 62,000
A12 Hatfield Peverel and Witham (South), Essex | 78,700
A12 Margaretting Bypass, Essex | 73,100
A12 Rivenhall End and Kelvedon Bypass, Essex | 78,700
A12 Stanway Bypass, Essex | 87,800
A13 | 82,000*
A14 Haughley New Street Bypass, Suffolk | 40,200
A14 Ipswich South-Eastern Bypass (Orwell Bridge to Levington), Suffolk | 53,400
A14 Ipswich South-Western Bypass (Copdock to Orwell Bridge), Suffolk | 53,400
A14 Ipswich Western Bypass (Claydon to Copdock), Suffolk | 47,000
A19 Billingham Bypass | 60,600 (16 per cent HGV)
A30 Honiton to Exeter | 28,500
A30 Longrock | 23,500
A30 Whiddon Down | 22,700
A35 Tolpuddle/Puddletown | 25,000
A46: Willoughby-on-the-Wolds to Six Hills—dual carriageway. Nearest town—between Bingham and Leicester. County—Leicestershire | 24,000
A47 Dereham Bypass | 22,000
A50 Doveridge Bypass | 42,051
A50 Derby Southern Bypass | 50,919
A50 Foston Hatton Hilton Bypass | 38,245
A50 Blythe Bridge to Uttoxeter | 32,918
A52: Bottesford Bypass—single carriageway. Nearest town—between Radcliffe-on-Trent and Grantham County—Leicestershire | 16,500
A120 Colchester Eastern Bypass | 13,200
A120 Wix Bypass | 13,200
A160-A160 between A1077 and A180 | 12,000 (44 per cent HGV)
A180-A180 between A1136 and A1173 | 30,300 (16 per cent HGV)
A180-A180 between A1136 and A180 | 30,800 (15 per cent HGV)
A180-A180 between A1173 and A160 | 22,100 (19 per cent HGV)
A180-A180 between A160 and M180 J5 | No AADT data
A303 between A356 & A358 (WB) | 12,595
A303 between A358 & A356 (E/B) | 12,996
A419/A417 DBFO concrete carriageway | 29,894
A483 Pulford Island to Welsh Border | No count information for 2005, AADT 2004 was 48,700.
* no AADT available. Figure provided is an actual traffic flow for October 2005
The table below gives the annual average daily traffic (AADT) data for each concrete surfaced section of the motorway network for 2005.
Route | Annual Average Daily Traffic (AADT)
M1 A1 link J47-48N, A1M J44 | 65,800 (17 per cent HGV)
M1 A1 link J46-47 | 67,300 (17 per cent HGV)
M1 A1 link J44-45 | 80,900 (17 per cent HGV)
M1 A1 link J43-44 | 67,500 (18 per cent HGV)
M1 A1 link J42-43 | 132,600 (15 per cent HGV)
M1 A1 link J45-46 | 79,900 (17 per cent HGV)
M1 J5-8 | 105,000
M3 J8 north of J9 | 57,000
M4 J10 | No AADT data available
M6 J12-13 | 117,849
M11 J6-5 | 71,000
M11 J8-9 (final phase) | 67,483
M18 J5 | 48,900 (22 per cent HGV)
M18 J5-6 | 47,600 (26 per cent HGV)
M18 J6-7 | 44,100 (24 per cent HGV)
M20 J8-9 | 56,000
M25 J8-9 | 152,000
M25 J9-10 | 153,000
M25 J10-11 | 164,000
M25 J24-25 | 127,000
M25 J27-28 | 129,000
M26 J2a-3 | 48,000
M27 J5-7 | 122,000
M42 J3a-4* | 126,800
M42 J9-10 | 35,253
M53 J11-12 | No data for J11-12 so J10-11 used 62,300
M54 J2-3 | 50,300
M54 J3-4 | 50,100
M54 J4-5 | 41,800
M56 J15-16 | No data for J15-16 so J14-15 used 96,700
M60 J1-2 | 125,600
M271 (north of M27 J3) | 122,000
M271 (south of M27 J3) | 14,000
* M42 J3a-4 was identified in the 2003 Ministerial announcement, however, this location is within the ATM section and resurfacing with low noise surfacing has been delayed due to the data collection of ATM traffic flow figures.
The Highways Agency has a policy of using quieter surfaces as a matter of course whenever a road needs to be resurfaced. Since July 2000 approximately 35 per cent of the concrete sections of the strategic road network have been surfaced with quieter materials.
Tables (A) and (B) indicate concrete sections surfaced and sections not surfaced respectively.
Table A— Concrete sections surfaced with quieter materials
Year | Scheme
1999-00 | M20 Junctions 3-5
2000-01 | M20 Junctions 9-10
2001-02 | No schemes c
2002-03 | M180 Junction 2 to Beltoft
| A12 Brentwood Bypass Phase 2
| M11 Junction 8 (Stanstead Slip Rd Contract)
| M20 Junction 11-Smeeth
| M27 Junctions 2-4
| M11 Junctions 7-6 southbound
| M5 Junctions 26-27 Contract 1
2003-04 | A1 Long Bennington (additional stretch to April 2003 announcement)
| M42 Junctions 2-3a
| M180 Sandtoft-Junction 2
| M11 B1038 (Newport) A11 (M11 Junction 9 Junction 8 Phase 1) (new scheme from Oct 2001 announcement)
| M1 Junctions 1-2
| M20 Junctions 11a-11
| M20 Junctions 13-11a
| M25 Junctions 26-27
| M5 Junctions 26-27 Contract 2
| M5 Junctions 27 south to Willand (additional stretch to April 2003 announcement)
| A12 Witham-Kelvedon
2004-05 | M11 Junction 6 (additional stretch to April 2003 announcement)
| A1(M) Junction 1 (South Mimms)
| M4 Junction 10 slip roads—phase 1
| A27 Chichester to Havant (phases 1 & 2)
| A1 North Muskham to Carlton on Trent (phases 1 & 2)
| M5 J26 — J27 Contract 3
| M69 Junction 2-M1 Contract 1
2005-06 | A180 Habrough to Stallingborough (new scheme from Oct 2001 announcement)
| M62 Gilberdyke to Newport (additional stretch to April 2003 announcement)
| A1 North Muskham to Carlton on Trent (phase 3)
| A27 Chichester to Havant (phase 3)
| M20 Junction 3-A20 West Kingstown
| A34 Peartree to Weston
| A36: M27 roundabout to Circuit Road roundabout (additional stretch to April 2003 announcement)
2006-07 | A1 Coddington to Balderton
| A1 Coddington to Balderton phase 2 (March 07)
| M11 J9-8 phase 2 (B1038 Newport-Ugley)
| M6 Junction 12 to Penkridge
Table B—Concrete sections not re-surfaced with quieter materials
Concrete Road Section Description | Concrete Section Length—km
M1-A1 link | 15.5
M20 Junctions 8-9 | 20.4
M25 Junctions 9-10 | 7.8
M27 Junctions 5-7 | 5.7
M60 J1-2 concrete overlay | 1.7
A5 Milton Keynes (A422-A508) | 6.3
A11: B1172-A47 | 13.7
A12 Ingateston-Margaretting | 4.4
A12 Hatfield Peverel-Witham | 5.2
A13: A1306-M25 J30 | 3
A14 Claydon-B1067 Underbridge | 3
A30 Honiton-Exeter | 16.2
A47 East Dereham: East Dereham-B1135 | 3.3
A50: Doveridge Bypass | 4
A419/A417 Cirencester & Latton Bypasses | 14.2
M42 Junctions 9-10 | 5.1
M6 Penkridge to Junction 13 | 3.8
M18 Junctions 5-6 | 2.3
M25 Junctions 10-11 | 9.2
M25 Junctions 24-25 | 8.5
M25 Junctions 8-9 | 7.2
M42 Junctions 3a-4 | 3.5
M54: A5-A41 | 9.3
M271 Junctions 1 to A3057 | 2.8
A11-Barton Mills | 2.8
A12 Contract 11: Kelvedon Bypass-Eight Ash Green | 7.7
A12 Margaretting-Boreham | 13.4
A14 B1067 Underbridge-Copdock Interchange | 3.3
A14 Copdock Interchange-A12 | 8
A19 Billingham Bypass | 4.2
A30 Longrock Bypass | 1.8
A35 Tolpuddle-Puddletown | 7.2
A50 Derby Southern Bypass | 0.5
A52 Bottesford Bypass | 4.8
A120 Elmstead-Wix eastbound | 3.5
A483: B5445-Welsh boundary | 3.1
M3 Junctions 8-9 | 9
M4 Junction 10 slip roads-phase 2 | 0.5
M11 Junctions 5-6 | 4.7
M18 Moorends-Greenland | 4.9
M25 Junctions 27-28 | 5.6
M26-J2A to M20 concrete and EB overlay (MP 14/6 TO 15/9) | 0.8
M53 Junctions 11-12 (A56-M56) | 3.9
M54: A41-A449 | 12.9
M56 Junction 15 (M53)-A5117 | 3
A14 A12 Levington | 3.7
A14 Elmswell | 3.6
A30 Whiddon Down to Okehampton | 6.9
A46 Six Hills-Widmerpool | 9.5
A47 East Dereham: Wending-East Dereham | 4.3
A50 Blythe Bridge to Uttoxeter | 12.4
A50: Foston Hatton Hilton Bypass | 3.6
A120: A12-Elmstead | 4.5
A160: A1077-A180 | 4.4
A180: Habrough to Grimsby | 11.5
A180:M180-Ulceby | 8
A303 Illminster Bypass | 8.8
M1 J5-8 (SB) | 8
M11 J8-9 (final phase) | 7