Winter Energy Supply
House of Commons, 16 May 2006, TRADE AND INDUSTRY.
Alistair Darling (Labour, Edinburgh South West)
It has been a tight winter for energy supply, and this has led to high energy prices. The energy market had taken steps to prepare for the winter, and Government worked closely with Ofgem and National Grid to ensure that all possible actions were taken to secure energy supplies. Looking ahead to next winter, I am announcing today the creation of a Business Energy Forum to look at strategic energy issues. Looking beyond next winter, I am depositing in the House a parliamentary statement of "Need for Additional Gas Supply Infrastructure". This sets out the economic case for taking action on planning to enable our strong energy market to deliver.
Outturn for Winter 05/06
The gas market for winter 2005-06 was tighter than the previous winter. Gas supplies were maintained, but increased gas prices arising from the tight supply-demand balance were a major issue for industry as well as for domestic users. A fire at the Rough gas storage facility on 16 February 2006 led to the facility being taken out of operation, and heightened concerns about supply during the final stages of the winter. There was one Gas Balancing Alert, on 13 March 2006, which followed the loss of the Rough storage facility, butno forcible interruptions due to supply-demand constraints. Adequate supplies of gas and electricity were successfully maintained on every day this winter.
The market had responded to projected increased demand, with additional import infrastructure at the Isle of Grain LNG terminal, the expansion of the Interconnector import capacity, and a new storage facility, Humbly Grove. All these began operation at the start of the winter. DTI played a proactive role, working with developers and regulators to smooththe path for these developments. The Government encouraged offshore producers to be ready to maximise their production capacity in the winter, and supplies of gas direct from the offshore fields held up well throughout the winter.
There was significant demand-side response from the electricity-generating sector. In terms of base-load generation, there was switching from gas to coal. In addition, there was some switching from gas to distillate fuel. The level of coal-fired generation was more significant than had been expected, and this clearly has implications for carbon emissions and climate change. Accordingly, the experience gained here will be taken into account by the Government's Energy Review.
Other energy intensive users also reduced demand significantly in response to high prices. The Government also worked to increase the awareness of energy intensive users of the importance of demand side response, and had facilitated switching from gas to other fuels for power generators and other users, by working with the Environment Agency to ensure this could be accommodated within the regulatory regime.
Price signals would have been expected to be sufficient to incentivise full use of new import facilities. There was, however, under-utilisation of this capacity, despite strong price signals to the market, particularly early in the winter. Lower than anticipated delivery of gas from continental European sources through the interconnector led to further increases in price. Ofgem has estimated this cost UK consumers up to £1.5 billion this year over the winter. The Government are looking into how to resolve this, supporting Ofgem and the European Commission's investigations. The Government also continue to push hard for liberalisation of the European market, including in particular, transparency of gas stocks and movements throughout the EU.
Throughout the winter, the Government worked closely with National Grid and Ofgem to communicate information on the gas market to Parliament, industry and the public, in particular on price. The Government recognise the difficulties faced by industrial users, particularly energy intensive energy users, and also domestic users.
For domestic users, the Government have increased funding for tackling fuel poverty by approximately £300m over the 2005-2008 period. The Government's main way of tackling fuel poverty in vulnerable households in England is Warmfront. Similar schemes, Warm Deal, the Home Energy Efficiency Scheme, and the Warm Homes Scheme also operate Scotland, Wales and Northern Ireland respectively. These provide heating and insulation measures to vulnerable households. To help those on low incomes, the Government have committed itself to continued winter fuel payments for the duration of this Parliament.
Outlook for Winter 2006-07
National Grid's draft "Winter Consultation Document", published today, indicates the supply-demand balance for gas next winter is expected again to be tight. Only a modest increase in demand is anticipated. Production of gas from the UK Continental Shelf, although lower than last winter, will continue to be by far the most important source of supply to the UK. Over the medium term, it will continue to contribute significantly to meeting UK demand. The balance of demand will need to be met through imports and release of gas from storage.
The market is delivering further new import infrastructure that is due to come on line next winter. This includes the completion of the Langeled Pipeline from Norway and the further expansion of the Belgian interconnector. There are also plans for the Balgzand-Bacton pipeline from the Netherlands to be in place this winter, and the new Excelerate LNG ship import facility in Teesside has recently been announced. In addition, the Humbly Grove storage facility should have had the opportunity to fill up with gas over this summer, unlike last year. The Government are monitoring carefully progress on restoring operations at the Rough storage facility.
The availability of adequate import infrastructure is only one aspect of supply. The Government remains committed to the liberalised market as the means of delivering security of supply. Interactions between the UK and other markets are growing, and the Government will be working to ensure that imports through the Interconnector and imports of LNG respond to demand from the UK. We will be meeting key companies over coming months, as we did last winter, to emphasise the importance to the UK of maximising gas supply in the winter. We will continue our efforts with Ofgem and the European Commission to push for greater transparency and liberalisation in continental European markets.
Electricity generation is expected to be similar to last winter, with around one third of electricity generation capacity gas-fired. Last winter showed, however, that during periods of high gas demand, coal generation becomes significant as the base load generator, and some gas-fired generators switch from gas to distillate as an alternative fuel. The Government will be working to ensure that reliability of alternative power generation capacity is enhanced, and to ensure that the environmental regulatory regime allows flexibility for power generators to switch from gas to alternative fuels if necessary.
The Government are taking early action to ensure that security of supply is assured during the coming winter, and to ensure that the impacts of a tight demand-supply balance are mitigated. The Government recognise that all participants in the market have a role to play, including the gas supply industry, including producers, transporters, and suppliers, users including industry, power generators and other energy intensive users, and regulatory bodies.
The Government are working to ensure that the best possible information on supply and demand forecasting is available to the industry. An important part of this includes working closely with National Grid who are producing their Winter Consultation Document, to be published by Ofgem today. The Government are also reviewing energy emergency arrangements, as part of proper contingency and emergency planning, consulting industry and other interested parties. The Government will be working closely with CBI, Ofgem, National Grid, producers, shippers, suppliers and industrial users to ensure that all possible preparations are made for next winter, that these are effectively coordinated, and communicated.
I am therefore announcing today the creation of a Business Energy Forum. This will be high-level group jointly chaired by my right hon. Friend the Minister for Energy (Malcolm Wicks) and Richard Lambert, Director General Designate of the CBI. The group will provide a forum for discussion of a broad range of strategic energy issues, with a focus on security of supply next winter. Its members will include representatives from industry bodies, including the Engineering Employers Federation, the Energy Intensive Users Group, and the Chemical Industries Association, gas producers and shippers, electricity generators and suppliers and representatives of other user groups.
Looking beyond next winter, there is further significant investment in gas supply infrastructure planned. The need for additional infrastructure, and a regulatory environment to allow such infrastructure to be delivered to the market in a timely fashion remains a priority for this Government. That is why today I am also depositing in the House a parliamentary statement of "Need for Additional Gas Supply Infrastructure", which sets out the economic case for our growing need for more infrastructure, and clarifies the Government policy context for planning and consent decisions on gas supply infrastructure projects.
The lessons of last winter are being taken into account. In the light of last winter's experience, gas supplies should be able to meet daily demand, although concerns remain about high prices. The Government remain committed to ensuring that the UK's strong energy market has the opportunity to operate effectively next winter and in the years to come.